ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / SHREE SIDDHESHWAR PRIDE

Valid until 30 Apr 2027 Mixed Development project

SHREE SIDDHESHWAR PRIDE

By SP INFRA SPACE

RG-GJ-93195 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA10060/210422 · Last updated on GujRERA portal: 30 Jun 2023

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2027Possession promisedno revision filed
18 of 27Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 40%
24 of 204Units unsoldnot recorded sold or booked
Jump to the 37 documents Report an error

SHREE SIDDHESHWAR PRIDE is a Mixed Development project by SP INFRA SPACE in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA10060/210422 on 21 Apr 2022. Possession is promised by 30 Apr 2027. 180 of the 204 units on this registration are recorded sold or booked, and 18 of 27 construction stages are filed complete.

At a glance

Project

  • NameSHREE SIDDHESHWAR PRIDE
  • TypeMixed Development
  • Location
    • SHREE SIDDHESHWAR PRIDE NEAR PALM GREEN RESIDENCY
    • AJWA WAGHODIYA LINK ROAD BAPOD
    • Vadodara
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA10060/210422
  • ReraGenie IDRG-GJ-93195

Builder

  • NameSP INFRA SPACE
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredApr 2022PromisedApr 2027

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2027
  • Registered on21 Apr 2022
  • Promised completion30 Apr 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed37 files

Current status

88%180 of 204 units booked
26.0%Of the estimated cost spent so far

Figures as on 30 Jun 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER-01(A+B)---542175
TOWER-02(C+D+E)---8417101
TOWER-03(F)---28028

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 30 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 40%.

TOWER-01(A+B)60%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor13%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats23%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing1%
TOWER-02(C+D+E)69%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor40%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats40%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing40%
TOWER-03(F)89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities23

As on 30 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes20%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingNoNot applicable
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesYes0%
Emergency evacuationYes0%
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%
Compound wallYes30%
Plinth protectionYes100%
Water tankYes100%
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,991 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 19.57 cr
Cost incurredRs 5.09 cr
Spent of the estimate26.0%
BuildingWingEstimatedIncurred
TOWER-01(A+B)NARs 6.53 crRs 1.70 cr
TOWER-02(C+D+E)NARs 6.53 crRs 1.70 cr
TOWER-03(F)NARs 6.53 crRs 1.70 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRAN PATEL (SPACE PLUS)
EngineerDELF CONSULTING ENGINEERS

Documents filed37

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA10060/210422 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)30 Jun 2023
Engineer's certificate annexure30 Jun 2023
RERA registration certificate21 Apr 2022
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

88%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep SHREE SIDDHESHWAR PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadodara2,900+ in Vadodara

2 kmSHREE SIDDHESHWAR PRIDEOther 186Dot size: filed unitsN

Filed coordinates, straight-line distance. 186 registered projects within 2 km.

Builder: SP INFRA SPACE

SP INFRA SPACE has 1 registration on GujRERA, including SHREE SIDDHESHWAR PRIDE. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if SHREE SIDDHESHWAR PRIDE is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHREE SIDDHESHWAR PRIDE?

The registered promoter entity is SP INFRA SPACE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHREE SIDDHESHWAR PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHREE SIDDHESHWAR PRIDE?

The professionals named in the filing: Architect: KIRAN PATEL (SPACE PLUS); Engineer: DELF CONSULTING ENGINEERS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE SIDDHESHWAR PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SIDDHESHWAR PRIDE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SIDDHESHWAR PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.