ReraGenieLog inGet a buyer report

Home / Browse projects / Anand, Gujarat / SHREE NARAYAN RESIDENCY

Valid until 30 May 2020 Residential/Group Housing project

SHREE NARAYAN RESIDENCY

By SHREE NARAYAN CONSTRUCTION

RG-GJ-66335 · RERA PR/GJ/ANAND/ANAND/Others/RAA03904/EX1/230819 · Last updated on GujRERA portal: 23 Nov 2020

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
May 2020Possession promisedmoved 12 months from the original
42 of 48Construction stages doneacross 6 buildings; furthest along: Installation of lifts, 0%
2 of 38Units unsoldnot recorded sold or booked
Jump to the 43 documents Report an error

SHREE NARAYAN RESIDENCY is a Residential/Group Housing project by SHREE NARAYAN CONSTRUCTION in Anand, Gujarat, registered with GujRERA as PR/GJ/ANAND/ANAND/Others/RAA03904/EX1/230819 on 1 Nov 2018. Possession is promised by 30 May 2020. The completion date has moved by 12 months from the original filing. 36 of the 38 units on this registration are recorded sold or booked, and 42 of 48 construction stages are filed complete.

At a glance

Project

  • NameSHREE NARAYAN RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • BEHIND SPEC CAMPUS
    • BAKROL VADTAL ROAD
    • Bakrol
    • Anand
    • 388315
  • Pincode388315
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/ANAND/ANAND/Others/RAA03904/EX1/230819
  • ReraGenie IDRG-GJ-66335

Builder

  • NameSHREE NARAYAN CONSTRUCTION
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredNov 2018First promiseMay 2019Revised toMay 2020

Key facts

Registration and timeline

  • StatusValid until 30 May 2020
  • Registered on1 Nov 2018
  • Promised completion30 May 2020
  • Revised completionRevised to 30 May 2020 (originally 30 May 2019)
  • Buildings6 building records
  • Documents filed43 files

Current status

95%36 of 38 units booked
79.2%Of the estimated cost spent so far

Figures as on 23 Nov 2020, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
wing 1 1 to 4---404
wing 2 5 to 11---707
wing 3 12 to 18---707
wing 4 19 to 25---707
wing 5 26 to 32---707
wing 6 33 to 38---606

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building6

As on 23 Nov 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

42 of 48 construction stages are filed complete across 6 buildings. The stage furthest along is Installation of lifts, at 0%.

wing 1 1 to 488%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
wing 2 5 to 1188%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
wing 3 12 to 1888%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
wing 4 19 to 2588%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
wing 5 26 to 3288%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
wing 6 33 to 3888%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 23 Nov 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,529 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.76 cr
Cost incurredRs 2.19 cr
Spent of the estimate79.24%
BuildingWingEstimatedIncurred
wing 1 1 to 4NARs 46.04 lakhRs 36.48 lakh
wing 2 5 to 11NARs 46.04 lakhRs 36.48 lakh
wing 3 12 to 18NARs 46.04 lakhRs 36.48 lakh
wing 4 19 to 25NARs 46.04 lakhRs 36.48 lakh
wing 5 26 to 32NARs 46.04 lakhRs 36.48 lakh
wing 6 33 to 38NARs 46.04 lakhRs 36.48 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMITESH HARSHADRAI DAVE
EngineerRIDDHISH SHAH

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/ANAND/ANAND/Others/RAA03904/EX1/230819Applied Jul 2019; approved Aug 2019

Documents filed43

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/ANAND/ANAND/Others/RAA03904/EX1/230819 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)23 Nov 2020
Architect's certificate (Form 1)21 Nov 2020
Engineer's certificate (Form 2)21 Nov 2020
Engineer's certificate annexure21 Nov 2020
Site photograph, wing 1 1 to 421 Nov 2020
Site photograph, wing 2 5 to 1121 Nov 2020
Site photograph, wing 3 12 to 1821 Nov 2020
Site photograph, wing 4 19 to 2521 Nov 2020
Site photograph, wing 5 26 to 3221 Nov 2020
Site photograph, wing 6 33 to 3821 Nov 2020
RERA registration certificate1 Nov 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Anand

95%of this project is bookeddistrict median 57%
17%of Anand projects moved their completion datethis one moved by 12 months

Computed across the 310+ Anand projects on ReraGenie, from their own filings.

Keep SHREE NARAYAN RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bakrol ,310+ in Anand

2 kmSHREE NARAYAN RESIDENCYOther 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: SHREE NARAYAN CONSTRUCTION

SHREE NARAYAN CONSTRUCTION has 1 registration on GujRERA, including SHREE NARAYAN RESIDENCY. Read the full track record. See more projects on the Anand district page.

Frequently asked questions

What are my rights if SHREE NARAYAN RESIDENCY is delayed beyond 30 May 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHREE NARAYAN RESIDENCY?

The registered promoter entity is SHREE NARAYAN CONSTRUCTION, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHREE NARAYAN RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHREE NARAYAN RESIDENCY?

The professionals named in the filing: Architect: MITESH HARSHADRAI DAVE; Engineer: RIDDHISH SHAH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE NARAYAN RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE NARAYAN RESIDENCY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE NARAYAN RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.