ReraGenieLog inGet a buyer report

Home / Browse projects / Anand, Gujarat / RAMA FLATS

Valid until 30 Apr 2024 Residential/Group Housing project

RAMA FLATS

By RAMA BUILDCON

RG-GJ-69524 · RERA PR/GJ/ANAND/ANAND/Others/RAA06442/091219 · Last updated on GujRERA portal: 8 Aug 2023

Source: official GujRERA filing

Red flags

  • Completion date moved by 16 months
  • 1 extension taken

Clear

  • Nothing verified clear yet
Apr 2024Possession promisedmoved 16 months from the original
5 of 16Construction stages doneacross 2 buildings; furthest along: Sanitary fittings within the flats, 98%
39 of 90Units unsoldnot recorded sold or booked
Jump to the 42 documents Report an error

RAMA FLATS is a Residential/Group Housing project by RAMA BUILDCON in Anand, Gujarat, registered with GujRERA as PR/GJ/ANAND/ANAND/Others/RAA06442/091219 on 9 Dec 2019. Possession is promised by 30 Apr 2024. The completion date has moved by 16 months from the original filing. 51 of the 90 units on this registration are recorded sold or booked, and 5 of 16 construction stages are filed complete.

At a glance

Project

  • NameRAMA FLATS
  • TypeResidential/Group Housing
  • Location
    • B/h Vinayaka Institute
    • Bakrol - Vadtal Road
    • Bakrol
    • Bakrol
    • Anand
    • 388315
  • Pincode388315
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/ANAND/ANAND/Others/RAA06442/091219
  • ReraGenie IDRG-GJ-69524

Builder

  • NameRAMA BUILDCON
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredDec 2019First promiseDec 2022Revised toApr 2024

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2024
  • Registered on9 Dec 2019
  • Promised completion30 Apr 2024
  • Revised completionRevised to 30 Apr 2024 (originally 30 Dec 2022)
  • Buildings2 building records
  • Documents filed42 files

Current status

57%51 of 90 units booked
35.0%Of the estimated cost spent so far

Figures as on 8 Aug 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER A---40040
TOWER B---50050

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building2

As on 8 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 16 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary fittings within the flats, at 98%.

TOWER A99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats98%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing98%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing98%
TOWER B42%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth70%
Stilt FloorNot applicable
Slabs of Super Structure70%
Internal walls, internal plaster, floorings, doors and windows within flats25%
Sanitary fittings within the flats25%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing25%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 8 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes50%
Water supplyYes50%
Sewerage (chamber, lines, septic tank, STP)Yes50%
Storm water drainsNoNot applicable
Landscaping and tree plantingNoNot applicable
Street lightingYes50%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes25%
Solid waste management and disposalYes25%
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,934 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 6.21 cr
Cost incurredRs 2.17 cr
Spent of the estimate34.96%
BuildingWingEstimatedIncurred
TOWER ANARs 3.10 crRs 1.09 cr
TOWER BNARs 3.10 crRs 1.09 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHARSHIT PATEL
EngineerMITESH H DAVE

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionApplied Aug 2023; no approval date filed

Documents filed42

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/ANAND/ANAND/Others/RAA06442/091219 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)8 Aug 2023
Site photograph, TOWER A8 Aug 2023
Site photograph, TOWER B8 Aug 2023
Engineer's certificate (Form 2)7 Oct 2022
Engineer's certificate annexure7 Oct 2022
Accountant's certificate (Form 3)7 Oct 2022
RERA registration certificate9 Dec 2019
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Anand

57%of this project is bookeddistrict median 57%
17%of Anand projects moved their completion datethis one moved by 16 months

Computed across the 310+ Anand projects on ReraGenie, from their own filings.

Keep RAMA FLATS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bakrol310+ in Anand

2 kmRAMA FLATSOther 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: RAMA BUILDCON

RAMA BUILDCON has 1 registration on GujRERA, including RAMA FLATS. Read the full track record. See more projects on the Anand district page.

Frequently asked questions

What are my rights if RAMA FLATS is delayed beyond 30 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of RAMA FLATS?

The registered promoter entity is RAMA BUILDCON, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in RAMA FLATS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at RAMA FLATS?

The professionals named in the filing: Architect: HARSHIT PATEL; Engineer: MITESH H DAVE. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAMA FLATS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAMA FLATS. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAMA FLATS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.