Home / Browse projects / Vadodara, Gujarat / SHREE NAND 151

Valid until 30 Apr 2027 Residential/Group Housing project

SHREE NAND 151

By NAND ASSOCIATES

RG-GJ-61922 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA09445/091221 · Last updated on GujRERA portal: 14 Oct 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2027Possession promisedno revision filed
22 of 27Construction stages doneacross 3 buildings; furthest along: Staircases, 62%
1 of 140Units unsoldnot recorded sold or booked
Jump to the 43 documents Report an error

SHREE NAND 151 is a Residential/Group Housing project by NAND ASSOCIATES in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA09445/091221 on 9 Dec 2021. Possession is promised by 30 Apr 2027. 139 of the 140 units on this registration are recorded sold or booked, and 22 of 27 construction stages are filed complete.

At a glance

Project

  • NameSHREE NAND 151
  • TypeResidential/Group Housing
  • Location
    • SHREE NAND 151
    • B/H DARSHNAM ANTILIYA -2
    • NEAR NAMAN FLTATS
    • KAPURAI CROSS ROAD VADODARA 390025.
    • Vadodara
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA09445/091221
  • ReraGenie IDRG-GJ-61922

Builder

  • NameNAND ASSOCIATES
  • Entity typePARTNERSHIP FIRM
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2021PromisedApr 2027

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2027
  • Registered on9 Dec 2021
  • Promised completion30 Apr 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed43 files

Current status

99%139 of 140 units booked
87.9%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1 & 2---56056
Tower 3---28028
Tower 4 & 5---56056

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 62%.

Tower 1 & 2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Tower 3100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Tower 4 & 566%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats43%
Sanitary fittings within the flats40%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks62%
External plumbing and external plaster, elevation, completion of terraces with waterproofing52%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes60%
Sewerage (chamber, lines, septic tank, STP)Yes60%
Storm water drainsYes0%
Landscaping and tree plantingNoNot applicable
Street lightingYes50%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingYes0%
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,582 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 14.50 cr
Cost incurredRs 12.75 cr
Spent of the estimate87.94%
BuildingWingEstimatedIncurred
Tower 1 & 2NARs 5.80 crRs 5.80 cr
Tower 4 & 5NARs 5.80 crRs 4.05 cr
Tower 3NARs 2.90 crRs 2.90 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR. GIRDHAR LOOMBA
EngineerAR. GIRDHAR LOOMBA

Documents filed43

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA09445/091221 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)14 Oct 2026
Engineer's certificate (Form 2)14 Oct 2026
Engineer's certificate annexure14 Oct 2026
Accountant's certificate (Form 3)14 Oct 2026
Site photograph, Tower 1 & 213 Oct 2026
Site photograph, Tower 313 Oct 2026
Site photograph, Tower 4 & 513 Oct 2026
RERA registration certificate9 Dec 2021
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

99%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep SHREE NAND 151 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadodara2,900+ in Vadodara

2 kmSHREE NAND 151Other 175Dot size: filed unitsN

Filed coordinates, straight-line distance. 175 registered projects within 2 km.

Builder: NAND ASSOCIATES

NAND ASSOCIATES has 2 registrations on GujRERA, including SHREE NAND 151 and MYRAH 32. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if SHREE NAND 151 is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHREE NAND 151?

The registered promoter entity is NAND ASSOCIATES, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHREE NAND 151?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHREE NAND 151?

The professionals named in the filing: Architect: AR. GIRDHAR LOOMBA; Engineer: AR. GIRDHAR LOOMBA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE NAND 151?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE NAND 151. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE NAND 151 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.