Home / Browse projects / Vadodara, Gujarat / SHIVALIK SHOPS

Valid until 29 Sep 2026 Commercial project

SHIVALIK SHOPS

By SHREE SAI DEVELOPERS

RG-GJ-39803 · RERA PR/GJ/VADODARA/VADODARA/Others/CAA10711/EX1/290626/290926 · Last updated on GujRERA portal: 5 Aug 2026

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Nothing verified clear yet
Sep 2026Possession promisedmoved 12 months from the original
14 of 27Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
20 of 53Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

SHIVALIK SHOPS is a Commercial project by SHREE SAI DEVELOPERS in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/CAA10711/EX1/290626/290926 on 29 Sep 2022. Possession is promised by 29 Sep 2026. The completion date has moved by 12 months from the original filing. 33 of the 53 units on this registration are recorded sold or booked, and 14 of 27 construction stages are filed complete.

At a glance

Project

  • NameSHIVALIK SHOPS
  • TypeCommercial
  • Location
    • 24 Mtr Road
    • Bh Kesar 45
    • Kapurai crossing to dabhoi road
    • kapurai
    • Vadodara
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/CAA10711/EX1/290626/290926
  • ReraGenie IDRG-GJ-39803

Builder

  • NameSHREE SAI DEVELOPERS
  • Entity typePARTNERSHIP FIRM
  • Other registrations9 more →

Key dates

this monthRegisteredSep 2022First promiseSep 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusValid until 29 Sep 2026
  • Registered on29 Sep 2022
  • Promised completion29 Sep 2026
  • Revised completionRevised to 29 Sep 2026 (originally 30 Sep 2025)
  • Buildings3 building records
  • Documents filed44 files

Current status

62%33 of 53 units booked
70.8%Of the estimated cost spent so far

Figures as on 5 Aug 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 3---01010
Building 1---02020
Building 2---02323

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

Building 30%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Building 178%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Building 278%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes50%
Water supplyNoNot applicable
Sewerage (chamber, lines, septic tank, STP)NoNot applicable
Storm water drainsNoNot applicable
Landscaping and tree plantingNoNot applicable
Street lightingYes50%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes40%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,138 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 3.60 cr
Cost incurredRs 2.55 cr
Spent of the estimate70.83%
BuildingWingEstimatedIncurred
Building 1NARs 1.20 crRs 1.25 cr
Building 2NARs 1.20 crRs 1.25 cr
Building 3NARs 1.20 crRs 5.00 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE PLUS
EngineerSUJAL SHAH

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/VADODARA/Others/CAA10711/EX1/290626/290926Applied Sep 2025; approved Jun 2026

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/CAA10711/EX1/290626/290926 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)5 Aug 2026
Engineer's certificate (Form 2)5 Aug 2026
Engineer's certificate annexure5 Aug 2026
Accountant's certificate (Form 3)5 Aug 2026
Site photograph, Building 35 Aug 2026
Site photograph, Building 15 Aug 2026
Site photograph, Building 25 Aug 2026
RERA registration certificate29 Sep 2022
Extension certificate-
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

62%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 12 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep SHIVALIK SHOPS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadodara2,900+ in Vadodara

2 kmSHIVALIK SHOPSOther 149Dot size: filed unitsN

Filed coordinates, straight-line distance. 149 registered projects within 2 km.

Builder: SHREE SAI DEVELOPERS

SHREE SAI DEVELOPERS has 10 registrations on GujRERA, including PARK WOODS and VASTU 20. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if SHIVALIK SHOPS is delayed beyond 29 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHIVALIK SHOPS?

The registered promoter entity is SHREE SAI DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHIVALIK SHOPS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHIVALIK SHOPS?

The professionals named in the filing: Architect: SPACE PLUS; Engineer: SUJAL SHAH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVALIK SHOPS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVALIK SHOPS. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVALIK SHOPS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.