ReraGenieLog inGet a buyer report

Home / Browse projects / Chikkamagaluru, Karnataka / Sharada Enclave

Registration approved No litigation declared Residential/Group Housing project

Sharada Enclave

By Injith Developers

RG-KA-06373 · RERA PRM/KA/RERA/1255/477/PR/191222/005535 · Last updated on RERA Karnataka portal: 20 Nov 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Feb 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 99 documents Report an error

Sharada Enclave is a Residential/Group Housing project by Injith Developers in Chikkamagaluru, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1255/477/PR/191222/005535 on 19 Dec 2022. Possession is promised by 28 Feb 2024.

At a glance

Project

  • NameSharada Enclave
  • TypeResidential/Group Housing
  • Location
    • Chikkamagaluru
    • 577139
  • Pincode577139
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1255/477/PR/191222/005535
  • ReraGenie IDRG-KA-06373

Builder

  • NameInjith Developers
  • Entity typeProprietorship Firm
  • GSTIN29AUAPP8958N3ZJ
  • Authorized SignatoryP S Injith Kumar

Key dates

this monthRegisteredDec 2022PromisedFeb 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on19 Dec 2022
  • Promised completion28 Feb 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sharada Enclave---20020

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 20 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 20 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area733 sq m
Named landowners1
LandownerVillageDistrict
P S Injith Kumar--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.85 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 4.85 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAshwin Srinivasa D
EngineerAshwin Srinivasa D
Chartered AccountantAshwin Kini H

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed99

As listed on the registration, under the names the promoter filed them with; the newest 80 of 99 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1255/477/PR/191222/005535 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
GSTFile: GST.pdf20 Nov 2022
Udyam Registration certificateFile: Udyam Registration cer.pdf20 Nov 2022
Adhar card CAFile: adhar card ca.pdf20 Nov 2022
Balancesheet & Profit and loss ac 2020File: Balancesheet & P& Loss ac 2020.pdf20 Nov 2022
Balancesheet & Profit and loss ac 2021File: Banacesheet & P&Loss ac 2021.pdf20 Nov 2022
Balancesheet & Profit and loss ac 2022File: Balancesheet & P&Loss ac 2022.pdf20 Nov 2022
ITR 2019 20File: ITR 2019 20.pdf20 Nov 2022
ITR 2020 21File: ITR 2020 21.pdf20 Nov 2022
ITR 2021 22File: ITR 2021 22.pdf20 Nov 2022
Adhar card CAFile: adhar card ca.pdf20 Nov 2022
Membercard CAFile: MemberCard CA.pdf20 Nov 2022
Estimate engineer costFile: Estimate engineer cost.pdf20 Nov 2022
balance sheet 2022File: Balancesheet 2022 with UDIN.pdf24 Oct 2022
ITR 2019 20File: ITR 2019 20.pdf24 Oct 2022
ITR 2020 21File: ITR 2020 21.pdf24 Oct 2022
ITR 2021 22File: ITR 2021 22.pdf24 Oct 2022
HissaFile: Hissa.pdf24 Oct 2022
akarbandFile: Akarband.pdf24 Oct 2022
ScketchFile: Sckech.pdf24 Oct 2022
estimate cost of engineerFile: Estimate cost of construnction.pdf24 Oct 2022
Structural engineer certificateFile: Structural Stability Certificate.pdf24 Oct 2022
sewage drawingFile: Sweage drawing.pdf24 Oct 2022
STP Demarction drawingFile: STP Demarction drawing.pdf24 Oct 2022
Project SpecificationFile: Project specification.pdf24 Oct 2022
NOcs fee paid recieptFile: NOCs fee paid reciept.pdf24 Oct 2022
tittle deed of RathnammaFile: tittle deed of rathnamma.pdf24 Oct 2022
RTC, survey Survey No -51/3-
Mutation, survey Survey No -51/3-
Encumbrance Certificate, survey Survey No -51/3-
Conversion/Alienation Order, survey Survey No -51/3-
Sale/Title/Gift Deed, survey Survey No -51/3-
Khatha, survey Survey No -51/3-
Registration CertificateFile: Registration certificate.pdf-
Certificate issued by CA Form 1File: Form 1 CA.pdf-
Certificate issued by Architect Form 2File: Architect certificate.pdf-
Certificate issued by Engineer Form 3File: Engineer certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation affidavit.pdf-
Certificate from Chartered AccountFile: Form 1 CA (1).pdf-
Balance Sheet 2021 - 2022File: Declaration for ITR.pdf-
Balance Sheet 2020 - 2021File: Declaration for ITR.pdf-
Balance Sheet 2019 - 2020File: Declaration for ITR.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Declaration for ITR.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Declaration for ITR.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Declaration for ITR.pdf-
Director's Report 2021 - 2022File: Declaration for ITR.pdf-
Director's Report 2020 - 2021File: Declaration for ITR.pdf-
Director's Report 2019 - 2020File: Declaration for ITR.pdf-
Cash Flow Statement 2021 - 2022File: Declaration for ITR.pdf-
Cash Flow Statement 2020 - 2021File: Declaration for ITR.pdf-
Auditor's Report 2021 - 2022File: Declaration for ITR.pdf-
Auditor's Report 2020 - 2021File: Declaration for ITR.pdf-
Auditor's Report 2019 - 2020File: Declaration for ITR.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Declaration for ITR.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: Declaration for ITR.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: Declaration for ITR.pdf-
Building license-
MESCOM-
Water NOC-
Single layout pln-
Building plan-
Building plan-
Building plan-
Building plan-
Project specification with sign-
Building plan-
Building plan-
convesrion order-
convesrion order-
MR RTC TIPPANY SCTETCH-
Agreement of Sale Proforma-
allotment letter-
Form B-
Sec 3(1) affidavit-
MESCOM-
Water NOC-
Unnamed document-
Unnamed document-

How this compares with Chikkamagaluru

13%of Chikkamagaluru projects moved their completion datethis one has not
0%of Chikkamagaluru registrations are shown as withdrawn or revokedthis one is not

Computed across the 36 Chikkamagaluru projects on ReraGenie, from their own filings.

Keep Sharada Enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Chikkamagaluru36 in Chikkamagaluru

Builder: Injith Developers

Injith Developers has 1 registration on RERA Karnataka, including Sharada Enclave. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Chikkamagaluru district page.

Frequently asked questions

What are my rights if Sharada Enclave is delayed beyond 28 Feb 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sharada Enclave?

The registered promoter entity is Injith Developers, a proprietorship firm as per the filing. Its GSTIN 29AUAPP8958N3ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sharada Enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Sharada Enclave?

The professionals named in the filing: Architect: Ashwin Srinivasa D; Engineer: Ashwin Srinivasa D; Chartered Accountant: Ashwin Kini H. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sharada Enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sharada Enclave. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sharada Enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.