Home / Browse projects / Vadodara, Gujarat / SHANGRI-LA IMPERIAL

Valid until 30 Apr 2028 Residential/Group Housing project

SHANGRI-LA IMPERIAL

By KUBER ROYAL

RG-GJ-36965 · RERA PR/GJ/VADODARA/VAGHODIA/Others/RAA11052/171222 · Last updated on GujRERA portal: 26 Aug 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2028Possession promisedno revision filed
0 of 36Construction stages doneacross 4 buildings; furthest along: Excavation, 75%
65 of 115Units unsoldnot recorded sold or booked
Jump to the 48 documents Report an error

SHANGRI-LA IMPERIAL is a Residential/Group Housing project by KUBER ROYAL in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VAGHODIA/Others/RAA11052/171222 on 17 Dec 2022. Possession is promised by 30 Apr 2028. 50 of the 115 units on this registration are recorded sold or booked, and 0 of 36 construction stages are filed complete.

At a glance

Project

  • NameSHANGRI-LA IMPERIAL
  • TypeResidential/Group Housing
  • Location
    • Shangri-La Imperial
    • Punit Shrey Nagar Co Op Housing Soc
    • Ajwa Nimeta Main Road
    • Vaghodia
    • Vadodara
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VAGHODIA/Others/RAA11052/171222
  • ReraGenie IDRG-GJ-36965

Builder

  • NameKUBER ROYAL
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredDec 2022PromisedApr 2028

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2028
  • Registered on17 Dec 2022
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed48 files

Current status

43%50 of 115 units booked
19.4%Of the estimated cost spent so far

Figures as on 26 Aug 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Type - A---34034
Type - B---40040
Type - B1---101
Type - C---40040

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 26 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 75%.

Type - A42%
ActivityProgress
Excavation71%
Podiums (if any)Not applicable
Plinth71%
Stilt Floor71%
Slabs of Super Structure44%
Internal walls, internal plaster, floorings, doors and windows within flats44%
Sanitary fittings within the flats21%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks44%
External plumbing and external plaster, elevation, completion of terraces with waterproofing12%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type - B19%
ActivityProgress
Excavation33%
Podiums (if any)Not applicable
Plinth33%
Stilt Floor33%
Slabs of Super Structure20%
Internal walls, internal plaster, floorings, doors and windows within flats23%
Sanitary fittings within the flats5%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks18%
External plumbing and external plaster, elevation, completion of terraces with waterproofing5%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type - B10%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type - C38%
ActivityProgress
Excavation75%
Podiums (if any)Not applicable
Plinth65%
Stilt Floor65%
Slabs of Super Structure43%
Internal walls, internal plaster, floorings, doors and windows within flats45%
Sanitary fittings within the flats5%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks42%
External plumbing and external plaster, elevation, completion of terraces with waterproofing3%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 26 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes80%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes50%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area67,438 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 55.00 cr
Cost incurredRs 10.64 cr
Spent of the estimate19.35%
BuildingWingEstimatedIncurred
Type - ANARs 21.00 crRs 4.15 cr
Type - BNARs 17.00 crRs 2.13 cr
Type - CNARs 16.00 crRs 4.36 cr
Type - B1NARs 1.00 cr-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKiran Patel - Spce Plus
EngineerChetan Kambad - Kambad Engineers

Documents filed48

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VAGHODIA/Others/RAA11052/171222 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)26 Aug 2026
Architect's certificate (Form 1)25 Aug 2026
Engineer's certificate (Form 2)25 Aug 2026
Engineer's certificate annexure25 Aug 2026
Site photograph, Type - A25 Aug 2026
Site photograph, Type - A25 Aug 2026
Site photograph, Type - B25 Aug 2026
Site photograph, Type - B25 Aug 2026
Site photograph, Type - B125 Aug 2026
Site photograph, Type - B125 Aug 2026
Site photograph, Type - C25 Aug 2026
Site photograph, Type - C25 Aug 2026
RERA registration certificate17 Dec 2022
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

43%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep SHANGRI-LA IMPERIAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadodara2,900+ in Vadodara

2 kmSHANGRI-LA IMPERIALOther 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: KUBER ROYAL

KUBER ROYAL has 1 registration on GujRERA, including SHANGRI-LA IMPERIAL. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if SHANGRI-LA IMPERIAL is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHANGRI-LA IMPERIAL?

The registered promoter entity is KUBER ROYAL, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHANGRI-LA IMPERIAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHANGRI-LA IMPERIAL?

The professionals named in the filing: Architect: Kiran Patel - Spce Plus; Engineer: Chetan Kambad - Kambad Engineers. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHANGRI-LA IMPERIAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHANGRI-LA IMPERIAL. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHANGRI-LA IMPERIAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.