ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / SEPAL LIFESTYLE

Valid until 30 Jan 2027 Residential/Group Housing project

SEPAL LIFESTYLE

By SEPAL BUILDCON

RG-GJ-97641 · RERA PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN207AA10107/EX1/151026/300127 · Last updated on GujRERA portal: 18 Aug 2026

Source: official GujRERA filing

Red flags

  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • Nothing verified clear yet
Jan 2027Possession promisedmoved 10 months from the original
64 of 72Construction stages doneacross 8 buildings; furthest along: Stilt Floor, 0%
13 of 41Units unsoldnot recorded sold or booked
Jump to the 38 documents Report an error

SEPAL LIFESTYLE is a Residential/Group Housing project by SEPAL BUILDCON in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN207AA10107/EX1/151026/300127 on 1 Oct 2022. Possession is promised by 30 Jan 2027. The completion date has moved by 10 months from the original filing. 28 of the 41 units on this registration are recorded sold or booked, and 64 of 72 construction stages are filed complete.

At a glance

Project

  • NameSEPAL LIFESTYLE
  • TypeResidential/Group Housing
  • Location
    • SEPAL LIFESTYLE Behind One West
    • Near Avadh Sky Seavsi-Bhayli Canal Road F.P 131 & 132
    • T.P-2
    • Sevasi
    • Vadodara
    • Sevasi
    • Vadodara
    • Sewasi
    • Vadodara
    • 391101
  • Pincode391101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN207AA10107/EX1/151026/300127
  • ReraGenie IDRG-GJ-97641

Builder

  • NameSEPAL BUILDCON
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredOct 2022First promiseMar 2026Revised toJan 2027

Key facts

Registration and timeline

  • StatusValid until 30 Jan 2027
  • Registered on1 Oct 2022
  • Promised completion30 Jan 2027
  • Revised completionRevised to 30 Jan 2027 (originally 31 Mar 2026)
  • Buildings8 building records
  • Documents filed38 files

Current status

68%28 of 41 units booked
100.0%Of the estimated cost spent so far

Figures as on 18 Aug 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE A---15015
TYPE B---12012
TYPE C---505
TYPE D---303
TYPE E---202
TYPE F---202
TYPE G---101
TYPE H---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building8

As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

64 of 72 construction stages are filed complete across 8 buildings. The stage furthest along is Stilt Floor, at 0%.

TYPE A89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TYPE B89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TYPE C89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TYPE D89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TYPE E89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TYPE F89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TYPE G89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TYPE H89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,075 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 21.06 cr
Cost incurredRs 21.06 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
TYPE ANARs 8.33 crRs 8.33 cr
TYPE BNARs 5.45 crRs 5.45 cr
TYPE CNARs 2.46 crRs 2.46 cr
TYPE DNARs 1.44 crRs 1.44 cr
TYPE ENARs 1.09 crRs 1.09 cr
TYPE FNARs 1.03 crRs 1.03 cr
TYPE HNARs 68.45 lakhRs 68.45 lakh
TYPE GNARs 57.12 lakhRs 57.12 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShivani Pranay Gohil
EngineerRANJIT HARILAL SOJITRA

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN207AA10107/EX1/151026/300127Applied Apr 2026; approved Oct 2026

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN207AA10107/EX1/151026/300127 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)18 Aug 2026
Engineer's certificate (Form 2)18 Aug 2026
Engineer's certificate annexure18 Aug 2026
Accountant's certificate (Form 3)18 Aug 2026
Site photograph, TYPE A14 Aug 2026
Site photograph, TYPE B14 Aug 2026
Site photograph, TYPE C14 Aug 2026
Site photograph, TYPE D14 Aug 2026
Site photograph, TYPE E14 Aug 2026
Site photograph, TYPE F14 Aug 2026
Site photograph, TYPE G14 Aug 2026
Site photograph, TYPE H14 Aug 2026
RERA registration certificate1 Oct 2022
Proforma agreement for sale-
Auditor's report (3 of 3)-
Income tax return (3 of 3)-
Project specific document-
Drainage affidavit-
Directors' report (3 of 3)-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Proforma sale deed-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

68%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 10 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep SEPAL LIFESTYLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Sewasi2,900+ in Vadodara

2 kmSEPAL LIFESTYLEOther 292Dot size: filed unitsN

Filed coordinates, straight-line distance. 292 registered projects within 2 km.

Builder: SEPAL BUILDCON

SEPAL BUILDCON has 1 registration on GujRERA, including SEPAL LIFESTYLE. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if SEPAL LIFESTYLE is delayed beyond 30 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SEPAL LIFESTYLE?

The registered promoter entity is SEPAL BUILDCON, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SEPAL LIFESTYLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SEPAL LIFESTYLE?

The professionals named in the filing: Architect: Shivani Pranay Gohil; Engineer: RANJIT HARILAL SOJITRA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SEPAL LIFESTYLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SEPAL LIFESTYLE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SEPAL LIFESTYLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.