Home / Browse projects / Uttara Kannada, Karnataka / SEA PEARL

Registration approved No litigation declared Residential/Group Housing project

SEA PEARL

By AMAN DEVELOPERS

RG-KA-75512 · RERA PRM/KA/RERA/1274/351/PR/141223/006466 · Last updated on RERA Karnataka portal: 6 Dec 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 130 documents Report an error

SEA PEARL is a Residential/Group Housing project by AMAN DEVELOPERS in Uttara Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1274/351/PR/141223/006466 on 14 Dec 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameSEA PEARL
  • TypeResidential/Group Housing
  • Location
    • Karwar
    • Uttara Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1274/351/PR/141223/006466
  • ReraGenie IDRG-KA-75512

Builder

  • NameAMAN DEVELOPERS
  • Entity typePartnership Firm
  • GSTIN29ABUFA8726G1ZT
  • Authorized SignatoryANANDU M NAIK

Key dates

this monthRegisteredDec 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Dec 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed130 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SEA PEARL---101

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 6 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 6 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
AMAN DEVELOPERS--
AMAN DEVELOPERS--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 12.19 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 12.08 cr-
Payment of feesRs 11.21 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKANCHAN VERNEKAR
EngineerMahesh Basanna
Chartered AccountantKiran Kenikar

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed130

As listed on the registration, under the names the promoter filed them with; the newest 80 of 130 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1274/351/PR/141223/006466 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Promoter need to upload upto date EC for both Sy nos. Hence not okFile: EC from 05082023 to 09112023.pdf6 Dec 2023
Uploaded with the signature of the Engineer. Please upload the STP design drawing as per the guideliFile: STP design and drawing as per KSPCB Guideliness signed by promoter and Engineer.pdf6 Dec 2023
Uploaded with the signature of the Engineer. Please upload the STP design drawing as per the guideliFile: STP Signed report.pdf6 Dec 2023
Uploaded the Form-6, Engineer certificate, but did not update the project's ongoing status on the prFile: Covering Letter 06122023.pdf6 Dec 2023
Please update the common area details of corridors/Lobbies and water & sanitation on the project deFile: Covering Letter 06122023.pdf6 Dec 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: Balance Sheet March 2022.pdf17 Nov 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: IT Acknowledgement March 2022.pdf17 Nov 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: P&L March 2022.pdf17 Nov 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: Schedule March 2022.pdf17 Nov 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: Balance Sheet March 2022.pdf17 Nov 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: IT Acknowledgement March 2022.pdf17 Nov 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: P&L March 2022.pdf17 Nov 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: Schedule March 2023.pdf17 Nov 2023
Upload Chartered accountant details properly with his KYCFile: PAN.pdf17 Nov 2023
Upload Chartered accountant details properly with his KYCFile: Practise Certificate.pdf17 Nov 2023
Upload chartered accountant certificate in prescribed format form -01.File: Form-1.pdf17 Nov 2023
What are all the sources of funds to complete the project? With supporting documentsFile: Declaration for source of funds.pdf17 Nov 2023
Registration fee paid not as per measurement of total area of land.File: Additional fee paid challan.pdf17 Nov 2023
Registration fee paid not as per measurement of total area of land.File: Additional fee calculation sheet.pdf17 Nov 2023
Promoter need to upload upto date EC for both Sy nos.File: EC 31 2 from 01042008 to 19082022.pdf17 Nov 2023
Promoter need to upload upto date EC for both Sy nos.File: EC from 01042009 to 05082023.pdf17 Nov 2023
Promoter need to upload upto date EC for both Sy nos.File: EC from 05082023 to 09112023.pdf17 Nov 2023
Promoter need to upload upto date EC for both Sy nos.File: EC-30 2A from 01042010 to 31122022.pdf17 Nov 2023
Promoter need to upload upto date EC for both Sy nos.File: EC-302A 31 2 31 from 01042009 to 05082023.pdf17 Nov 2023
Break up of types of Units (BHKwise)File: Area statement and Unit wise breakup.pdf17 Nov 2023
Upload certified Carpet area calculation.File: Area statement and Unit wise breakup.pdf17 Nov 2023
as per the uploaded CDP the proposed site comes in the park/agriculture zone upload the change of laFile: Change of land use CDP Map.pdf17 Nov 2023
Number of floors and height of the building details entered not matching with the sanction planFile: Reply for the Query.pdf17 Nov 2023
Enter the details of all the inventory.File: Area statement and Unit wise breakup.pdf17 Nov 2023
Enter the details of all the inventory.File: Reply for the Query.pdf17 Nov 2023
Please update the Development details properly on the project detail pageFile: Reply for the Query.pdf17 Nov 2023
Please update the Amenities and Common area details as per the sanctioned drawing along with the calFile: Reply for the Query.pdf17 Nov 2023
self-attested copy of the Power supply and Water supply NOC along with the copy of the fee receipt pFile: HESCOM NOC Fees paid.pdf17 Nov 2023
self-attested copy of the Power supply and Water supply NOC along with the copy of the fee receipt pFile: Water NOC Fees are included.pdf17 Nov 2023
Please upload the proforma of the Agreement for sale and the proforma of the Allotment letterFile: Allotment letter.pdf17 Nov 2023
Please upload the proforma of the Agreement for sale and the proforma of the Allotment letterFile: AOS.pdf17 Nov 2023
Please upload the STP design drawing as per the guidelines of KSPCB NOC certified by the Engineer.File: STP Signed report.pdf17 Nov 2023
Please mention the project name and project address and upload the project specification certified bFile: Project Specification signed by Engineer.pdf17 Nov 2023
Please upload the Form-6, Engineer certificate in the prescribed formatFile: Query form-6.pdf17 Nov 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: Balance Sheet March 2022.pdf21 Oct 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: IT Acknowledgement March 2022.pdf21 Oct 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: P&L March 2022.pdf21 Oct 2023
What are all the sources of funds to complete the project? With supporting documents.File: Declaration for source of fund.pdf21 Oct 2023
Registration fee paid not as per measurement of total area of land. Hence NOT OKFile: Challan Generation.pdf21 Oct 2023
Sale deed in Favour of Land owner Anand Naik & Anchala Anand Naik for Sy no.30/2A & 31/2.File: Mother Deed.pdf21 Oct 2023
Uploaded local Authority Katha is in the name of Anand Naik & Anchala Anand Naik for Sy no.30/2A & 3File: Form-9.pdf21 Oct 2023
EC from 01.04.2022 to till date for both Sy nos. Hence not ok.File: Encumbrance certificate.pdf21 Oct 2023
Upload CDP map showing the proposed site.File: CDP MAP.pdf21 Oct 2023
Upload commencement certificate.File: Building permission from local Panchayat.pdf21 Oct 2023
Upload Architects certificate with valid COA numberFile: COP.pdf21 Oct 2023
Please clarify the source of water supply to the project/building along with the supporting documentFile: Open Well.pdf21 Oct 2023
Please upload the brief estimated cost of construction certified by the Engineer.File: SEA-PEARL ESTIMATE.pdf21 Oct 2023
Please upload the Engineer certificate in the prescribed format.File: Form-3.pdf21 Oct 2023
Please Certificate from the Registered Engineer indicating the structural safety adopted for the prFile: Stability Certificate.pdf21 Oct 2023
Please upload the Land cost calculation sheet as per the guidance value (Self-attested copy). HenceFile: Self attested ASR Value.pdf21 Oct 2023
Reply to QueryFile: Reply to 1st Query.pdf21 Oct 2023
RTC, survey 31/2-
Mutation, survey 31/2-
Encumbrance Certificate, survey 31/2-
Conversion/Alienation Order, survey 31/2-
Sale/Title/Gift Deed, survey 31/2-
Khatha, survey 31/2-
RTC, survey 30/2A-
Mutation, survey 30/2A-
Encumbrance Certificate, survey 30/2A-
Conversion/Alienation Order, survey 30/2A-
Sale/Title/Gift Deed, survey 30/2A-
Khatha, survey 30/2A-
Registration CertificateFile: firm Registration certificate.pdf-
Partnership DeedFile: Partnership deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form-1.pdf-
Certificate issued by Architect Form 2File: Form-2.pdf-
Certificate issued by Engineer Form 3File: Form-3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit for non litigation on land.pdf-
Cash Flow Statement 2022 - 2023File: IS AY 2022-23.pdf-

How this compares with Uttara Kannada

22%of Uttara Kannada projects moved their completion datethis one has not
0%of Uttara Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 100+ Uttara Kannada projects on ReraGenie, from their own filings.

Keep SEA PEARL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Uttara Kannada100+ in Uttara Kannada

Builder: AMAN DEVELOPERS

AMAN DEVELOPERS has 1 registration on RERA Karnataka, including SEA PEARL. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Uttara Kannada district page.

Frequently asked questions

What are my rights if SEA PEARL is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SEA PEARL?

The registered promoter entity is AMAN DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29ABUFA8726G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SEA PEARL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SEA PEARL?

The professionals named in the filing: Architect: KANCHAN VERNEKAR; Engineer: Mahesh Basanna; Chartered Accountant: Kiran Kenikar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SEA PEARL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SEA PEARL. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SEA PEARL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.