RG-KA-14519 · RERA PRM/KA/RERA/1251/446/PR/050225/007481 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SARANG BY SUMADHURA PHASE-II is a Residential/Group Housing project by SUMADHURA INFRACON PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/050225/007481 on 5 Feb 2025. Possession is promised by 30 Jun 2027. 88 of the 138 units on this registration are recorded sold or booked, and 5 of 17 construction stages are filed complete.
At a glance
Project
- NameSARANG BY SUMADHURA PHASE-II
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560067
- Pincode560067
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/050225/007481
- ReraGenie IDRG-KA-14519
Builder
- NameSUMADHURA INFRACON PRIVATE LIMITED
- Entity typeCompany
- CINU45200KA2012PTC062071
- GSTIN29AAQCS9641A1ZZ
- Authorized SignatoryBHARAT KUMAR KANDUKURI
- Chairman and Managing DirectorGUNDA MADHUSUDHAN
- DirectorsBHARAT KUMAR KANDUKURI, KALAKUNTLA VENKATA RAMA RAO, G NAVEEN KUMAR, G SWAPNA, G MADHUSUDHAN, RAHUL KANDUKURI
- Project HeadSHIVANOORI SOHITH
- Other registrations20 more →
- Declared earlier projects16 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on5 Feb 2025
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings1 building record
- Documents filed142 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING-C | - | - | - | 138 | 0 | 138 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 17 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 80%.
Building: 47% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 80% |
| Masonry Construction | 50% |
| Plastering inside , outside & Ceiling | 40% |
| Joinery: Doors, Windows, Ventilators etc | 30% |
| Basic work of Water supply, Sanitary and Electrification | 20% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 30% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 18% |
| Painting | 12% |
| Fire prevention and fire fighting fitting and fixture with network | 20% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 85% |
| Sewage and Drainage System | Yes | 82% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 82% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 82% |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 35% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 72% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 98% |
| Parks & Tree planting | Yes | 32% |
| Street Lighting | Yes | 32% |
| Electricity | Yes | 86% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | Yes | 0% |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 45% |
| Lifts | Yes | 20% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 92% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 46% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VEGESNA KASTURI | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 114.07 cr | Rs 23.31 cr |
| Payment of taxes | Rs 9.45 cr | - |
| Administrative costs | Rs 4.07 cr | - |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 3.00 cr | Rs 8.09 lakh |
| On-site expenditure-Consultants Fees | Rs 67.90 lakh | Rs 43.31 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Nagabandi Shravan Kumar |
| Engineer | Arun Nadig |
| Chartered Accountant | CH PRANAY KUMAR |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed142
As listed on the registration, under the names the promoter filed them with; the newest 80 of 142 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/050225/007481 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-300926 Sarang-II_0001.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-300926 Sarang 2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300926-Sarang-II.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA Certificate 300626-Sarang-II_0001.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-30062026_Sarang-II.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300626-Sarang-II.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 310326-Sarang-II.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate 310326-Sarang-II.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate 310326 Sarang-II.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 31122025 Sarang-II.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate 31122025 Sarang-II.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate-31122025 Sarang-II.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Q3 2025-26 Fire and Safety | 14 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 14 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 14 Jan 2026 |
| CA certificateFile: Form-1 CA Certificate Sarang-II new.pdf | 28 Jan 2025 |
| Balance sheet 2023-24File: Balance sheet 2023-24.pdf | 28 Jan 2025 |
| Director IT AcknowledementFile: GMS IT ACK.pdf | 28 Jan 2025 |
| Director KVRR IT ACKFile: KVRR IT ACK.pdf | 28 Jan 2025 |
| EC FROM 01-06-2023 TO 20-09-2024 SY NO 119File: EC FROM 01-06-2023 TO 20-09-2024 SY NO 119.pdf | 28 Jan 2025 |
| Sale Deed of Land OwnerFile: Sale Deed of Land Owner.pdf | 28 Jan 2025 |
| Advocate Search ReportFile: Advocate Search Report.pdf | 28 Jan 2025 |
| Single Plot Layout approvalFile: Single Plot Layout approval.pdf | 28 Jan 2025 |
| Approved Building PlanFile: Approved Building Plan.pdf | 28 Jan 2025 |
| NOC KSPCBFile: NOC KSPCB.pdf | 28 Jan 2025 |
| NOC MOEFFile: NOC MOEF.pdf | 28 Jan 2025 |
| NOC HALFile: NOC HAL.pdf | 28 Jan 2025 |
| NOC FIREFile: NOC FIRE.pdf | 28 Jan 2025 |
| STP Drawing as per KSPCB Norms self attested by EngineerFile: STP Drawing as per KSPCB Norms self attested by Engineer.pdf | 28 Jan 2025 |
| Notarized Affidavit for 3(1) VoliationFile: Notarized Affidavit for 3(1) Voliation.pdf | 28 Jan 2025 |
| Proforma Of Allotment Letter - Sarang -2File: Proforma Of Allotment Letter - Sarang -2.pdf | 28 Jan 2025 |
| SEIAA-KSPCB Nocs ClariFile: SEIAA-KSPCB Nocs Clari.pdf | 28 Jan 2025 |
| Self Attested AAI NOCFile: Self Attested AAI NOC.pdf | 28 Jan 2025 |
| Approved Building Licence Sarang -IIFile: Approved Building Licence Sarang -II.pdf | 28 Jan 2025 |
| Amenities and Common area details certified by the Engineer Sarang-IIFile: Amenities and Common area details certified by the Engineer Sarang-II.pdf | 28 Jan 2025 |
| Development Plan & OrderFile: Development Plan & Order.pdf | 28 Jan 2025 |
| Estimated cost of construction certified by the Engineer Sarang-IIFile: Estimated cost of construction certified by the Engineer Sarang-II.pdf | 28 Jan 2025 |
| Land Value Calculation sheet as per Certificed Guideline ValeFile: Land Value Cost.pdf | 28 Jan 2025 |
| Balancwe Fee Paid Challan Sarang-2 RERAFile: Fee Paid Challan Sarang-2 RERA.pdf | 28 Jan 2025 |
| EC 24-09-20 TO 2025-01-15File: EC 24-09-20 TO 2025-01-15.pdf | 28 Jan 2025 |
| Registered Engineer Self Attested LicenseFile: Structural Engineer Certifcate Nadig.pdf | 28 Jan 2025 |
| NOC Panchayat Water PermissionFile: NOC PDO Water Permission.PDF | 28 Jan 2025 |
| Approved Site PlanFile: 01 Site Plan.pdf | 28 Jan 2025 |
| Approved 2nd BF PlanFile: 02 2nd BF Plan.pdf | 28 Jan 2025 |
| Appproved 1st BF PlanFile: 03 1st BF Plan.pdf | 28 Jan 2025 |
| Approved Ground Floor PlanFile: 04 Groung Plan.pdf | 28 Jan 2025 |
| Approved Typical 1 to 18 PlanFile: 05 Typical 1 to 18 Plan.pdf | 28 Jan 2025 |
| Approved Typical 1 to 18 PlanFile: 06 Typical 19 to 22 with Terrace Plan.pdf | 28 Jan 2025 |
| Approved Elevation & Section PlanFile: 07 Elevation & Section Plan.pdf | 28 Jan 2025 |
| RTC, survey 119 | - |
| Mutation, survey 119 | - |
| Encumbrance Certificate, survey 119 | - |
| Conversion/Alienation Order, survey 119 | - |
| JDA, survey 119 | - |
| Khatha, survey 119 | - |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| FOLIUM BY SUMADHURA PHASE-II | BBMP Katha No 650/389 Sy No 47/1 47/2A & B 48/3 48/4 47/3 Whitefiled Village K R Puram Hobli Bangalore East Taluk | Ongoing | Jun 2025 | Not delivered |
| FOLIUM BY SUMADHURA PHASE-I | BBMP Katha No 650/389 Sy No 47/1 47/2A & B 48/3 48/4 47/3 Whitefiled Village K R Puram Hobli Bangalore East Taluk | Ongoing | Jun 2025 | Not delivered |
| SUMADHURA SUSHANTHAM PHASE-II | BBMP Katha No 1583 Sy No 3/7 3/8A 3/8B 3/8C Thindlu Village Yelahanka Hobli Bangalore North Taluk | Ongoing | Dec 2024 | Not delivered |
| SUMADHURA NANDANAM | BBMP Katha No 1087 Sy No 10/2 Hoodi Village KR Puram hobli, Bangalore East Taluk | Completed | - | No date filed |
| SUMADHURA EDEN GARDEN | Sy No 8/2 8/3 8/5 9/1 9/2 9/3 10 113/2 Doddabanahalli Village Bidarahalli Hobli Bangalore East Bangalore | Completed | - | No date filed |
| ASPIRE AURUM | VP Katha No 191, Sy No 114/1,114/2,114/3 Doddabanahalli Village Bidarahalli Hobli Bangalore East Taluk | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SARANG BY SUMADHURA PHASE-II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 34 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
DS MAX SKY FIELDS
DS Max Properties Private Limited
Sowparnika Rhythm of Rain
SOWPARNIKA HOMES PRIVATE LIMITED
WORLD OF GARDENS
RLP TRENDSQUARES PROJECTS PRIVATE LIMITED
DS MAX SKYSAMPURN
DS MAX PROPERTIES PRIVATE LIMITED
Amrutha Lake Vista
Amrutha Shelters Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: SUMADHURA INFRACON PRIVATE LIMITED
SUMADHURA INFRACON PRIVATE LIMITED has 21 registrations on RERA Karnataka, including Sumadhura Belfort and SUMADHURA SUSHANTHAM PHASE I. Its filings declare 16 earlier projects, 11 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SARANG BY SUMADHURA PHASE-II is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SARANG BY SUMADHURA PHASE-II?
The registered promoter entity is SUMADHURA INFRACON PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062071 and GSTIN 29AAQCS9641A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SARANG BY SUMADHURA PHASE-II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SARANG BY SUMADHURA PHASE-II?
The professionals named in the filing: Architect: Nagabandi Shravan Kumar; Engineer: Arun Nadig; Chartered Accountant: CH PRANAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SARANG BY SUMADHURA PHASE-II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.