Home / Browse projects / Bengaluru Urban, Karnataka / SARANG BY SUMADHURA PHASE-II

Registration approved No litigation declared Residential/Group Housing project

SARANG BY SUMADHURA PHASE-II

By SUMADHURA INFRACON PRIVATE LIMITED

RG-KA-14519 · RERA PRM/KA/RERA/1251/446/PR/050225/007481 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2027Possession promisedno revision filed
5 of 17Construction stages donefurthest along: RCC or MS Framed structure, 80%
50 of 138Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 142 documents Report an error

SARANG BY SUMADHURA PHASE-II is a Residential/Group Housing project by SUMADHURA INFRACON PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/050225/007481 on 5 Feb 2025. Possession is promised by 30 Jun 2027. 88 of the 138 units on this registration are recorded sold or booked, and 5 of 17 construction stages are filed complete.

At a glance

Project

  • NameSARANG BY SUMADHURA PHASE-II
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560067
  • Pincode560067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/050225/007481
  • ReraGenie IDRG-KA-14519

Builder

  • NameSUMADHURA INFRACON PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200KA2012PTC062071
  • GSTIN29AAQCS9641A1ZZ
  • Authorized SignatoryBHARAT KUMAR KANDUKURI
  • Chairman and Managing DirectorGUNDA MADHUSUDHAN
  • DirectorsBHARAT KUMAR KANDUKURI, KALAKUNTLA VENKATA RAMA RAO, G NAVEEN KUMAR, G SWAPNA, G MADHUSUDHAN, RAHUL KANDUKURI
  • Project HeadSHIVANOORI SOHITH
  • Other registrations20 more →
  • Declared earlier projects16 →

Key dates

this monthRegisteredFeb 2025PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 Feb 2025
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed142 files

Current status

64%88 of 138 units booked
18.1%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING-C---1380138

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 17 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 80%.

Building: 47% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure80%
Masonry Construction50%
Plastering inside , outside & Ceiling40%
Joinery: Doors, Windows, Ventilators etc30%
Basic work of Water supply, Sanitary and Electrification20%
Dadoing, Skirting, Flooring, Tiles work (All types)30%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing18%
Painting12%
Fire prevention and fire fighting fitting and fixture with network20%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes85%
Sewage and Drainage SystemYes82%
Water conservation/rain water harvesting/recharge of ground waterYes82%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes82%
Solid waste management and disposalYes100%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes35%
Electricity supply transformer and substationYes0%
Storm water drainsYes72%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes98%
Parks & Tree plantingYes32%
Street LightingYes32%
ElectricityYes86%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes0%
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes45%
LiftsYes20%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes92%
TerraceYes0%
Outer WallYes46%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,281 sq m
Named landowners1
LandownerVillageDistrict
VEGESNA KASTURI--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 131.27 cr
Cost incurredRs 23.83 cr
Spent of the estimate18.15%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 114.07 crRs 23.31 cr
Payment of taxesRs 9.45 cr-
Administrative costsRs 4.07 cr-
Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for constructionRs 3.00 crRs 8.09 lakh
On-site expenditure-Consultants FeesRs 67.90 lakhRs 43.31 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNagabandi Shravan Kumar
EngineerArun Nadig
Chartered AccountantCH PRANAY KUMAR

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed142

As listed on the registration, under the names the promoter filed them with; the newest 80 of 142 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/050225/007481 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-300926 Sarang-II_0001.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-300926 Sarang 2.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300926-Sarang-II.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA Certificate 300626-Sarang-II_0001.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-30062026_Sarang-II.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300626-Sarang-II.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 310326-Sarang-II.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate 310326-Sarang-II.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate 310326 Sarang-II.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 31122025 Sarang-II.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate 31122025 Sarang-II.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate-31122025 Sarang-II.pdf14 Jan 2026
Q3 2025-26 Water supply and sewage board14 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)14 Jan 2026
Q3 2025-26 KPTCL- BESCOM14 Jan 2026
Q3 2025-26 Fire and Safety14 Jan 2026
Q3 2025-26 Airport Authority of India14 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department14 Jan 2026
CA certificateFile: Form-1 CA Certificate Sarang-II new.pdf28 Jan 2025
Balance sheet 2023-24File: Balance sheet 2023-24.pdf28 Jan 2025
Director IT AcknowledementFile: GMS IT ACK.pdf28 Jan 2025
Director KVRR IT ACKFile: KVRR IT ACK.pdf28 Jan 2025
EC FROM 01-06-2023 TO 20-09-2024 SY NO 119File: EC FROM 01-06-2023 TO 20-09-2024 SY NO 119.pdf28 Jan 2025
Sale Deed of Land OwnerFile: Sale Deed of Land Owner.pdf28 Jan 2025
Advocate Search ReportFile: Advocate Search Report.pdf28 Jan 2025
Single Plot Layout approvalFile: Single Plot Layout approval.pdf28 Jan 2025
Approved Building PlanFile: Approved Building Plan.pdf28 Jan 2025
NOC KSPCBFile: NOC KSPCB.pdf28 Jan 2025
NOC MOEFFile: NOC MOEF.pdf28 Jan 2025
NOC HALFile: NOC HAL.pdf28 Jan 2025
NOC FIREFile: NOC FIRE.pdf28 Jan 2025
STP Drawing as per KSPCB Norms self attested by EngineerFile: STP Drawing as per KSPCB Norms self attested by Engineer.pdf28 Jan 2025
Notarized Affidavit for 3(1) VoliationFile: Notarized Affidavit for 3(1) Voliation.pdf28 Jan 2025
Proforma Of Allotment Letter - Sarang -2File: Proforma Of Allotment Letter - Sarang -2.pdf28 Jan 2025
SEIAA-KSPCB Nocs ClariFile: SEIAA-KSPCB Nocs Clari.pdf28 Jan 2025
Self Attested AAI NOCFile: Self Attested AAI NOC.pdf28 Jan 2025
Approved Building Licence Sarang -IIFile: Approved Building Licence Sarang -II.pdf28 Jan 2025
Amenities and Common area details certified by the Engineer Sarang-IIFile: Amenities and Common area details certified by the Engineer Sarang-II.pdf28 Jan 2025
Development Plan & OrderFile: Development Plan & Order.pdf28 Jan 2025
Estimated cost of construction certified by the Engineer Sarang-IIFile: Estimated cost of construction certified by the Engineer Sarang-II.pdf28 Jan 2025
Land Value Calculation sheet as per Certificed Guideline ValeFile: Land Value Cost.pdf28 Jan 2025
Balancwe Fee Paid Challan Sarang-2 RERAFile: Fee Paid Challan Sarang-2 RERA.pdf28 Jan 2025
EC 24-09-20 TO 2025-01-15File: EC 24-09-20 TO 2025-01-15.pdf28 Jan 2025
Registered Engineer Self Attested LicenseFile: Structural Engineer Certifcate Nadig.pdf28 Jan 2025
NOC Panchayat Water PermissionFile: NOC PDO Water Permission.PDF28 Jan 2025
Approved Site PlanFile: 01 Site Plan.pdf28 Jan 2025
Approved 2nd BF PlanFile: 02 2nd BF Plan.pdf28 Jan 2025
Appproved 1st BF PlanFile: 03 1st BF Plan.pdf28 Jan 2025
Approved Ground Floor PlanFile: 04 Groung Plan.pdf28 Jan 2025
Approved Typical 1 to 18 PlanFile: 05 Typical 1 to 18 Plan.pdf28 Jan 2025
Approved Typical 1 to 18 PlanFile: 06 Typical 19 to 22 with Terrace Plan.pdf28 Jan 2025
Approved Elevation & Section PlanFile: 07 Elevation & Section Plan.pdf28 Jan 2025
RTC, survey 119-
Mutation, survey 119-
Encumbrance Certificate, survey 119-
Conversion/Alienation Order, survey 119-
JDA, survey 119-
Khatha, survey 119-

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 not delivered by the promised date3 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
FOLIUM BY SUMADHURA PHASE-IIBBMP Katha No 650/389 Sy No 47/1 47/2A & B 48/3 48/4 47/3 Whitefiled Village K R Puram Hobli Bangalore East TalukOngoingJun 2025Not delivered
FOLIUM BY SUMADHURA PHASE-IBBMP Katha No 650/389 Sy No 47/1 47/2A & B 48/3 48/4 47/3 Whitefiled Village K R Puram Hobli Bangalore East TalukOngoingJun 2025Not delivered
SUMADHURA SUSHANTHAM PHASE-IIBBMP Katha No 1583 Sy No 3/7 3/8A 3/8B 3/8C Thindlu Village Yelahanka Hobli Bangalore North TalukOngoingDec 2024Not delivered
SUMADHURA NANDANAMBBMP Katha No 1087 Sy No 10/2 Hoodi Village KR Puram hobli, Bangalore East TalukCompleted-No date filed
SUMADHURA EDEN GARDENSy No 8/2 8/3 8/5 9/1 9/2 9/3 10 113/2 Doddabanahalli Village Bidarahalli Hobli Bangalore East BangaloreCompleted-No date filed
ASPIRE AURUMVP Katha No 191, Sy No 114/1,114/2,114/3 Doddabanahalli Village Bidarahalli Hobli Bangalore East TalukCompleted-No date filed

How this compares with Bengaluru Urban

64%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SARANG BY SUMADHURA PHASE-II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSARANG BY SUMADHURA PHASOther 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 34 registered projects within 2 km.

Builder: SUMADHURA INFRACON PRIVATE LIMITED

SUMADHURA INFRACON PRIVATE LIMITED has 21 registrations on RERA Karnataka, including Sumadhura Belfort and SUMADHURA SUSHANTHAM PHASE I. Its filings declare 16 earlier projects, 11 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SARANG BY SUMADHURA PHASE-II is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SARANG BY SUMADHURA PHASE-II?

The registered promoter entity is SUMADHURA INFRACON PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062071 and GSTIN 29AAQCS9641A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SARANG BY SUMADHURA PHASE-II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SARANG BY SUMADHURA PHASE-II?

The professionals named in the filing: Architect: Nagabandi Shravan Kumar; Engineer: Arun Nadig; Chartered Accountant: CH PRANAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SARANG BY SUMADHURA PHASE-II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SARANG BY SUMADHURA PHASE-II. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SARANG BY SUMADHURA PHASE-II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.