Home / Browse projects / Bengaluru Urban, Karnataka / SARANG BY SUMADHURA PHASE-I

Registration approved No litigation declared Residential/Group Housing project

SARANG BY SUMADHURA PHASE-I

By SUMADHURA INFRACON PRIVATE LIMITED

RG-KA-94711 · RERA PRM/KA/RERA/1251/446/PR/180723/006075 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2026Possession promisedno revision filed
18 of 18Construction stages doneevery applicable stage filed complete
88 of 272Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 169 documents Report an error

SARANG BY SUMADHURA PHASE-I is a Residential/Group Housing project by SUMADHURA INFRACON PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/180723/006075 on 18 Jul 2023. Possession is promised by 31 Dec 2026. 184 of the 272 units on this registration are recorded sold or booked, and 18 of 18 construction stages are filed complete.

At a glance

Project

  • NameSARANG BY SUMADHURA PHASE-I
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560067
  • Pincode560067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/180723/006075
  • ReraGenie IDRG-KA-94711

Builder

  • NameSUMADHURA INFRACON PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200KA2012PTC062071
  • GSTIN29AAQCS9641A1ZZ
  • Authorized SignatoryBHARAT KUMAR KANDUKURI
  • Chairman and Managing DirectorGUNDA MADHUSUDHAN
  • DirectorsGUNDA MADHUSUDHAN, BHARAT KUMAR KANDUKURI, KALAKUNTLA VENKATA RAMA RAO, RAHUL KANDUKURI, G SWAPNA, G NAVEEN KUMAR
  • Project HeadSHIVANOORI SOHITH
  • Other registrations20 more →
  • Declared earlier projects16 →

Key dates

this monthRegisteredJul 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Jul 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed169 files

Current status

68%184 of 272 units booked
3.6%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING-A---1340134
WING-B---1380138

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 18 construction stages are filed complete.

Building: 100% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing100%
Painting100%
Fire prevention and fire fighting fitting and fixture with network100%
Weather Proof work(tile,concrete)100%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work100%
Internal and External work including landscapes as per sanctioned drawings100%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Sewage and Drainage SystemYes100%
Water conservation/rain water harvesting/recharge of ground waterYes100%
Energy managementYes0%
Fire protection and fire safety requirementsYes100%
Solid waste management and disposalYes100%
Emergency Evacuation servicesYes100%
Internal Roads & FootpathsYes100%
Electricity supply transformer and substationYes100%
Storm water drainsYes100%
Use of renewable energyYes100%
Sewage Treatment Plant (STP)Yes100%
Parks & Tree plantingYes50%
Street LightingYes80%
ElectricityYes100%
Smart Home AutomationYes100%
CCTV SurveillanceYes100%
Club HouseYes100%
Community HallYes100%
Outdoor Sports facilityYes100%
Indoor Sports facilityYes100%
Swimming PoolYes100%
GymYes100%
ParksYes100%
Power BackupYes100%
Piped GasNoNot applicable
Water and SanitationYes100%
Air ConditioningYes100%
StaircasesYes100%
LiftsYes100%
Corridor/LobbiesYes100%
Fire escapesYes100%
Common entrance and exit for the building/common portico/foyer/verandahYes100%
BasementYes100%
TerraceYes100%
Outer WallYes100%
Open parking areasYes100%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes100%
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,537 sq m
Named landowners1
LandownerVillageDistrict
VEGESNA KASTURI--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 219.86 cr
Cost incurredRs 8.01 cr
Spent of the estimate3.64%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 160.62 crRs 5.65 cr
On-site expenditure-Site OverheadRs 30.61 cr-
Payment of taxesRs 14.84 crRs 12.81 lakh
Principal sum and interest payable to financial institutions-Scheduled BanksRs 11.00 cr-
On-site expenditure-Consultants FeesRs 2.80 crRs 2.23 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNagabandi Shravan Kumar
EngineerArun Nadig
Chartered AccountantCH PRANAY KUMAR

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed169

As listed on the registration, under the names the promoter filed them with; the newest 80 of 169 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/180723/006075 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-300926 Sarang-I_0001.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-300926 Sarang-I.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300926-Sarang-I.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA Certificate 300626- Sarang-I_0001.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-30062026_Sarang-I.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300626-Sarang-I.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 310326-Sarang-I.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate-080426-Sarang-I.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate 310326 Sarang-I.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-Sarang-I 31122025.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate-Sarang-I 31122025.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate-Sarang-I 31122025.pdf14 Jan 2026
Q3 2025-26 Water supply and sewage board14 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)14 Jan 2026
Q3 2025-26 KPTCL- BESCOM14 Jan 2026
Q3 2025-26 Fire and Safety14 Jan 2026
Q3 2025-26 Airport Authority of India14 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department14 Jan 2026
19th FLOOR PLANFile: 19th FLOOR PLAN.pdf12 Jul 2023
MutationFile: Mutation Register.pdf12 Jul 2023
Survay sketchFile: Survey Sketch.pdf12 Jul 2023
TippaniFile: Tippani.pdf12 Jul 2023
Village mapFile: Village Map Doddabanahalli.pdf12 Jul 2023
APPROVED SITE PLANFile: APPROVED SITE PLAN.pdf6 Jul 2023
APPROVED SECTIONAL PLANFile: APPROVED ELEVATION & SECTION PLAN.pdf6 Jul 2023
ELEVATION & SECTION AMENITYFile: ELEVATION & SECTION AMENITY.pdf6 Jul 2023
APPROVED GROUND FLOOR PLAN with LandscapeFile: APPROVED GF PLAN with Landscape.pdf6 Jul 2023
APPROVED 5tth TO 18th FLOOR PLANFile: APPROVED 5tth TO 18th FLOOR PLAN.pdf6 Jul 2023
APPROVED TERRACE FLOOR PLANFile: APPROVED TERRACE FLOOR PLAN.pdf6 Jul 2023
APPROVED 21st & 22nd FLOOR PLANFile: APPROVED 21st & 22nd FLOOR PLAN.pdf6 Jul 2023
2nd BF PLANFile: 2nd BF PLAN.pdf6 Jul 2023
1st BF PLANFile: 1st BF PLAN.pdf6 Jul 2023
GF PLANFile: GF PLAN.pdf6 Jul 2023
1st FLOOR PLANFile: 1st FLOOR PLAN.pdf6 Jul 2023
20th FLOOR PLANFile: 20th FLOOR PLAN.pdf6 Jul 2023
4th FLOOR PLANFile: 4th FLOOR PLAN.pdf6 Jul 2023
2nd FLOOR PLANFile: 2nd FLOOR PLAN.pdf6 Jul 2023
3rd FLOOR PLANFile: 3rd FLOOR PLAN.pdf6 Jul 2023
BDA LICENSEFile: NOC BDA License with Endorsement & Receipt.pdf6 Jul 2023
KSPCB NOC with Fee ReceiptFile: NOC KSPCB.pdf6 Jul 2023
Relinquishment DeedFile: Relinquishment Deed.pdf6 Jul 2023
Site Location Demarked in Village MapFile: Site Location Demarked in Village Map.pdf6 Jul 2023
PROJECT GOOGLE MAPFile: PROJECT GOOGLE MAP.pdf6 Jul 2023
Advocate Search ReportFile: Advocate Search Report.pdf30 Jun 2023
Affidavit for NOC'sFile: Affidavit for NOC's.pdf30 Jun 2023
Affidavit Sec (3) NotarisedFile: Allotment Letter (2 files merged).pdf30 Jun 2023
Allotment LetterFile: Allotment Letter.pdf30 Jun 2023
Commencement CertifcateFile: Commencement Certifcate.pdf30 Jun 2023
Demarked in CDP-ModelFile: Demarked in CDP-Model.pdf30 Jun 2023
Demarked in Village mapFile: Demarked in Village map.pdf30 Jun 2023
Development Plan & OrderFile: Development Plan & Order.pdf30 Jun 2023
FAR ClarificationFile: FAR Clarification.pdf30 Jun 2023
Form 2 Architect Certificate with COAFile: Form 2 Architect Certificate.pdf30 Jun 2023
NOC (ACK) FIREFile: NOC (ACK) FIRE.pdf30 Jun 2023
NOC (ACK) KSPCBFile: NOC (ACK) KSPCB.pdf30 Jun 2023
NOC AAIFile: NOC AAI.pdf30 Jun 2023
NOC BDA License with Endorsement & ReceiptFile: NOC BDA License with Endorsement & Receipt.pdf30 Jun 2023
NOC BESCOMFile: NOC BESCOM.pdf30 Jun 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 not delivered by the promised date3 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
FOLIUM BY SUMADHURA PHASE-IBBMP Katha No 650/389 Sy No 47/1 47/2A & B 48/3 48/4 47/3 Whitefiled Village K R Puram Hobli Bangalore East TalukOngoingJun 2025Not delivered
SUMADHURA SUSHANTHAM PHASE-IIBBMP Katha No 1583 Sy No 3/7 3/8A 3/8B 3/8C Thindlu Village Yelahanka Hobli Bangalore North TalukOngoingDec 2024Not delivered
SUMADHURA SUSHANTHAM PHASE-IBBMP Katha No 1582 Sy No 3/9 3/10 Thindlu Village Yelahanka Hobli Bangalore North TalukCompleted-No date filed
SUMADHURA NANDANAMBBMP Katha No 1087 Sy No 10/2 Hoodi Village KR Puram hobli, Bangalore East TalukCompleted-No date filed
SUMADHURA EDEN GARDENSy No 8/2 8/3 8/5 9/1 9/2 9/3 10 113/2 Doddabanahalli Village Bidarahalli Hobli Bangalore East BangaloreCompleted-No date filed

How this compares with Bengaluru Urban

68%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SARANG BY SUMADHURA PHASE-I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSARANG BY SUMADHURA PHASOther 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: SUMADHURA INFRACON PRIVATE LIMITED

SUMADHURA INFRACON PRIVATE LIMITED has 21 registrations on RERA Karnataka, including Sumadhura Belfort and SUMADHURA SUSHANTHAM PHASE I. Its filings declare 16 earlier projects, 11 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SARANG BY SUMADHURA PHASE-I is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SARANG BY SUMADHURA PHASE-I?

The registered promoter entity is SUMADHURA INFRACON PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062071 and GSTIN 29AAQCS9641A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SARANG BY SUMADHURA PHASE-I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SARANG BY SUMADHURA PHASE-I?

The professionals named in the filing: Architect: Nagabandi Shravan Kumar; Engineer: Arun Nadig; Chartered Accountant: CH PRANAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SARANG BY SUMADHURA PHASE-I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SARANG BY SUMADHURA PHASE-I. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SARANG BY SUMADHURA PHASE-I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.