Home / Browse projects / Bengaluru Urban, Karnataka / SARANG BY SUMADHURA PHASE-I
SARANG BY SUMADHURA PHASE-I
By SUMADHURA INFRACON PRIVATE LIMITED
RG-KA-94711 · RERA PRM/KA/RERA/1251/446/PR/180723/006075 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SARANG BY SUMADHURA PHASE-I is a Residential/Group Housing project by SUMADHURA INFRACON PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/180723/006075 on 18 Jul 2023. Possession is promised by 31 Dec 2026. 184 of the 272 units on this registration are recorded sold or booked, and 18 of 18 construction stages are filed complete.
At a glance
Project
- NameSARANG BY SUMADHURA PHASE-I
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560067
- Pincode560067
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/180723/006075
- ReraGenie IDRG-KA-94711
Builder
- NameSUMADHURA INFRACON PRIVATE LIMITED
- Entity typeCompany
- CINU45200KA2012PTC062071
- GSTIN29AAQCS9641A1ZZ
- Authorized SignatoryBHARAT KUMAR KANDUKURI
- Chairman and Managing DirectorGUNDA MADHUSUDHAN
- DirectorsGUNDA MADHUSUDHAN, BHARAT KUMAR KANDUKURI, KALAKUNTLA VENKATA RAMA RAO, RAHUL KANDUKURI, G SWAPNA, G NAVEEN KUMAR
- Project HeadSHIVANOORI SOHITH
- Other registrations20 more →
- Declared earlier projects16 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Jul 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed169 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING-A | - | - | - | 134 | 0 | 134 |
| WING-B | - | - | - | 138 | 0 | 138 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 18 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | Yes | 100% |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | Yes | 100% |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | Yes | 50% |
| Street Lighting | Yes | 80% |
| Electricity | Yes | 100% |
| Smart Home Automation | Yes | 100% |
| CCTV Surveillance | Yes | 100% |
| Club House | Yes | 100% |
| Community Hall | Yes | 100% |
| Outdoor Sports facility | Yes | 100% |
| Indoor Sports facility | Yes | 100% |
| Swimming Pool | Yes | 100% |
| Gym | Yes | 100% |
| Parks | Yes | 100% |
| Power Backup | Yes | 100% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 100% |
| Air Conditioning | Yes | 100% |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 100% |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas | Yes | 100% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 100% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VEGESNA KASTURI | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 160.62 cr | Rs 5.65 cr |
| On-site expenditure-Site Overhead | Rs 30.61 cr | - |
| Payment of taxes | Rs 14.84 cr | Rs 12.81 lakh |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 11.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 2.80 cr | Rs 2.23 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Nagabandi Shravan Kumar |
| Engineer | Arun Nadig |
| Chartered Accountant | CH PRANAY KUMAR |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed169
As listed on the registration, under the names the promoter filed them with; the newest 80 of 169 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/180723/006075 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-300926 Sarang-I_0001.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-300926 Sarang-I.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300926-Sarang-I.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA Certificate 300626- Sarang-I_0001.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-30062026_Sarang-I.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300626-Sarang-I.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 310326-Sarang-I.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate-080426-Sarang-I.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate 310326 Sarang-I.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-Sarang-I 31122025.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate-Sarang-I 31122025.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate-Sarang-I 31122025.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Q3 2025-26 Fire and Safety | 14 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 14 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 14 Jan 2026 |
| 19th FLOOR PLANFile: 19th FLOOR PLAN.pdf | 12 Jul 2023 |
| MutationFile: Mutation Register.pdf | 12 Jul 2023 |
| Survay sketchFile: Survey Sketch.pdf | 12 Jul 2023 |
| TippaniFile: Tippani.pdf | 12 Jul 2023 |
| Village mapFile: Village Map Doddabanahalli.pdf | 12 Jul 2023 |
| APPROVED SITE PLANFile: APPROVED SITE PLAN.pdf | 6 Jul 2023 |
| APPROVED SECTIONAL PLANFile: APPROVED ELEVATION & SECTION PLAN.pdf | 6 Jul 2023 |
| ELEVATION & SECTION AMENITYFile: ELEVATION & SECTION AMENITY.pdf | 6 Jul 2023 |
| APPROVED GROUND FLOOR PLAN with LandscapeFile: APPROVED GF PLAN with Landscape.pdf | 6 Jul 2023 |
| APPROVED 5tth TO 18th FLOOR PLANFile: APPROVED 5tth TO 18th FLOOR PLAN.pdf | 6 Jul 2023 |
| APPROVED TERRACE FLOOR PLANFile: APPROVED TERRACE FLOOR PLAN.pdf | 6 Jul 2023 |
| APPROVED 21st & 22nd FLOOR PLANFile: APPROVED 21st & 22nd FLOOR PLAN.pdf | 6 Jul 2023 |
| 2nd BF PLANFile: 2nd BF PLAN.pdf | 6 Jul 2023 |
| 1st BF PLANFile: 1st BF PLAN.pdf | 6 Jul 2023 |
| GF PLANFile: GF PLAN.pdf | 6 Jul 2023 |
| 1st FLOOR PLANFile: 1st FLOOR PLAN.pdf | 6 Jul 2023 |
| 20th FLOOR PLANFile: 20th FLOOR PLAN.pdf | 6 Jul 2023 |
| 4th FLOOR PLANFile: 4th FLOOR PLAN.pdf | 6 Jul 2023 |
| 2nd FLOOR PLANFile: 2nd FLOOR PLAN.pdf | 6 Jul 2023 |
| 3rd FLOOR PLANFile: 3rd FLOOR PLAN.pdf | 6 Jul 2023 |
| BDA LICENSEFile: NOC BDA License with Endorsement & Receipt.pdf | 6 Jul 2023 |
| KSPCB NOC with Fee ReceiptFile: NOC KSPCB.pdf | 6 Jul 2023 |
| Relinquishment DeedFile: Relinquishment Deed.pdf | 6 Jul 2023 |
| Site Location Demarked in Village MapFile: Site Location Demarked in Village Map.pdf | 6 Jul 2023 |
| PROJECT GOOGLE MAPFile: PROJECT GOOGLE MAP.pdf | 6 Jul 2023 |
| Advocate Search ReportFile: Advocate Search Report.pdf | 30 Jun 2023 |
| Affidavit for NOC'sFile: Affidavit for NOC's.pdf | 30 Jun 2023 |
| Affidavit Sec (3) NotarisedFile: Allotment Letter (2 files merged).pdf | 30 Jun 2023 |
| Allotment LetterFile: Allotment Letter.pdf | 30 Jun 2023 |
| Commencement CertifcateFile: Commencement Certifcate.pdf | 30 Jun 2023 |
| Demarked in CDP-ModelFile: Demarked in CDP-Model.pdf | 30 Jun 2023 |
| Demarked in Village mapFile: Demarked in Village map.pdf | 30 Jun 2023 |
| Development Plan & OrderFile: Development Plan & Order.pdf | 30 Jun 2023 |
| FAR ClarificationFile: FAR Clarification.pdf | 30 Jun 2023 |
| Form 2 Architect Certificate with COAFile: Form 2 Architect Certificate.pdf | 30 Jun 2023 |
| NOC (ACK) FIREFile: NOC (ACK) FIRE.pdf | 30 Jun 2023 |
| NOC (ACK) KSPCBFile: NOC (ACK) KSPCB.pdf | 30 Jun 2023 |
| NOC AAIFile: NOC AAI.pdf | 30 Jun 2023 |
| NOC BDA License with Endorsement & ReceiptFile: NOC BDA License with Endorsement & Receipt.pdf | 30 Jun 2023 |
| NOC BESCOMFile: NOC BESCOM.pdf | 30 Jun 2023 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| FOLIUM BY SUMADHURA PHASE-I | BBMP Katha No 650/389 Sy No 47/1 47/2A & B 48/3 48/4 47/3 Whitefiled Village K R Puram Hobli Bangalore East Taluk | Ongoing | Jun 2025 | Not delivered |
| SUMADHURA SUSHANTHAM PHASE-II | BBMP Katha No 1583 Sy No 3/7 3/8A 3/8B 3/8C Thindlu Village Yelahanka Hobli Bangalore North Taluk | Ongoing | Dec 2024 | Not delivered |
| SUMADHURA SUSHANTHAM PHASE-I | BBMP Katha No 1582 Sy No 3/9 3/10 Thindlu Village Yelahanka Hobli Bangalore North Taluk | Completed | - | No date filed |
| SUMADHURA NANDANAM | BBMP Katha No 1087 Sy No 10/2 Hoodi Village KR Puram hobli, Bangalore East Taluk | Completed | - | No date filed |
| SUMADHURA EDEN GARDEN | Sy No 8/2 8/3 8/5 9/1 9/2 9/3 10 113/2 Doddabanahalli Village Bidarahalli Hobli Bangalore East Bangalore | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SARANG BY SUMADHURA PHASE-I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 37 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
DS MAX SKY FIELDS
DS Max Properties Private Limited
Sowparnika Rhythm of Rain
SOWPARNIKA HOMES PRIVATE LIMITED
WORLD OF GARDENS
RLP TRENDSQUARES PROJECTS PRIVATE LIMITED
DS MAX SKYSAMPURN
DS MAX PROPERTIES PRIVATE LIMITED
Amrutha Lake Vista
Amrutha Shelters Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: SUMADHURA INFRACON PRIVATE LIMITED
SUMADHURA INFRACON PRIVATE LIMITED has 21 registrations on RERA Karnataka, including Sumadhura Belfort and SUMADHURA SUSHANTHAM PHASE I. Its filings declare 16 earlier projects, 11 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SARANG BY SUMADHURA PHASE-I is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SARANG BY SUMADHURA PHASE-I?
The registered promoter entity is SUMADHURA INFRACON PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062071 and GSTIN 29AAQCS9641A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SARANG BY SUMADHURA PHASE-I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SARANG BY SUMADHURA PHASE-I?
The professionals named in the filing: Architect: Nagabandi Shravan Kumar; Engineer: Arun Nadig; Chartered Accountant: CH PRANAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SARANG BY SUMADHURA PHASE-I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.