Home / Browse projects / Bengaluru Rural, Karnataka / SANJEEVINI HELICONIA
SANJEEVINI HELICONIA
RG-KA-70108 · RERA PRM/KA/RERA/1250/304/PR/180726/008826 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SANJEEVINI HELICONIA is a Residential/Group Housing project by Sanjeevini Projects in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/180726/008826 on 18 Jul 2026. Possession is promised by 31 Dec 2029. 34 of the 221 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameSANJEEVINI HELICONIA
- TypeResidential/Group Housing
- Location
- Hosakote
- Bengaluru Rural
- 560067
- Pincode560067
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1250/304/PR/180726/008826
- ReraGenie IDRG-KA-70108
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Jul 2026
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings2 building records
- Documents filed108 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Block | - | - | - | 95 | 0 | 95 |
| B Block | - | - | - | 126 | 0 | 126 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 80%.
Building: 19% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 80% |
| Foundation footing work | 80% |
| Upto Plinth Level | 80% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 25% |
| Retaining wall (All types) | 80% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 10% |
| Sewage and Drainage System | Yes | 5% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 5% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sumitra Sreenivas | - | - |
| Srinidhi Sreenivas | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 99.55 cr | Rs 11.79 cr |
| Payment of taxes | Rs 13.05 cr | Rs 15.83 lakh |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 12.15 cr | Rs 23.42 lakh |
| On-site expenditure-Site Overhead | Rs 7.50 cr | Rs 2.93 cr |
| On-site expenditure-Consultants Fees | Rs 1.85 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | B V Narendranath Reddy |
| Engineer | Chanakya N |
| Chartered Accountant | Nirmala Sreenivasulu |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed108
As listed on the registration, under the names the promoter filed them with; the newest 80 of 108 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/180726/008826 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Final_compressed.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: form-5Archite.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| EC upto dateFile: EC upto date.pdf | 13 Jul 2026 |
| Advocate search reportFile: Advocate Search Report.pdf | 13 Jul 2026 |
| Building License from Local Authority Original Copy.File: Affidavit cum Declaration for Building License.pdf | 13 Jul 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: 1_compressed.pdf | 13 Jul 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: 2_compressed.pdf | 13 Jul 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: 3_compressed.pdf | 13 Jul 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: 4_compressed.pdf | 13 Jul 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: 5_compressed.pdf | 13 Jul 2026 |
| Approval/NOC under section 14 of the KTCP Act from competent Authority.File: Declaration for KTCP NOC.pdf | 13 Jul 2026 |
| Details of amenities and facilities provided as per plan and thereof including fire fighting facilitFile: Declaration for Amenities.pdf | 13 Jul 2026 |
| Brochure of the project with amenities details.File: Brochure with Aminities.pdf | 13 Jul 2026 |
| Kindly update the flat dimension wise details in development details as per approved plan.File: Flat Dimension Wise Details.pdf | 13 Jul 2026 |
| Kindly upload elaborated structural stability certificate clearly stating the loads considered, CodFile: Elaborated Structural Stability Certificate.pdf | 13 Jul 2026 |
| Kindly update the project name and address in the 3(1) notarized affidavit.File: Sec 3-1 Affidavit.pdf | 13 Jul 2026 |
| Kindly upload SEIAA NOC.File: SEIAA NOC.pdf | 13 Jul 2026 |
| Kindly upload STP drawing with engineer signtaure.File: STP DETAILS With Engineer Signature.pdf | 13 Jul 2026 |
| Kindly upload the brief estimated cost of construction, certified by the registered Civil Engineer.File: Breif Estimated Cost merged.pdf | 13 Jul 2026 |
| Kindly upload the Land cost calculation sheet as per the guidance value(Self-attested copy) along wiFile: Declaration for Guidance Value merged.pdf | 13 Jul 2026 |
| RTC, survey 183 | - |
| Mutation, survey 183 | - |
| Encumbrance Certificate, survey 183 | - |
| Conversion/Alienation Order, survey 183 | - |
| Sale/Title/Gift Deed, survey 183 | - |
| JDA, survey 183 | - |
| Khatha, survey 183 | - |
| Registration CertificateFile: Firm Registration Certificate_compressed.pdf | - |
| GST CertificateFile: GST Certificate.pdf | - |
| Partnership DeedFile: Reconstitutional Partnership Deed_compressed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form 1 Sanjeevini Heliconia.pdf | - |
| Certificate issued by Architect Form 2File: Form 2.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: No Litigation Affidavit.pdf | - |
| Balance Sheet 2024 - 2025File: Balance Sheet 2024-25_compressed (4).pdf | - |
| Balance Sheet 2023 - 2024File: SP IT Return 2023-24 UDIN Signed_compressed.pdf | - |
| Balance Sheet 2022 - 2023File: Financials 22-23 UDIN.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: Profit and Loss 2024-25.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: SP IT Return 2023-24 UDIN Signed_compressed.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Financials 22-23 UDIN.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: ITR of FY - 2024-25.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: SP IT Return 2023-24 UDIN Signed_compressed.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR of FY - 2022-23.pdf | - |
| Commencement Certificate | - |
| 1 | - |
| 1 | - |
| Structural Stability Certificate | - |
| Project Speciication | - |
| Will be Uploaded Soon | - |
| Relinquish Deed, Parityajana patra_13617-2025-26 | - |
| Final Proforma for Agreement of Sale | - |
| Proforma of Allotment Letter | - |
| Form B | - |
| Section 3-1 Affidavit | - |
| Will be Uploaded Soon | - |
| Will be Uploaded Soon | - |
| BESCOM NOC | - |
| Water NOC | - |
| Pollution NOC | - |
| FIRE NOC | - |
| AAI NOC | - |
| BSNL NOC | - |
| 1_compressed | - |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Sanjeevini Aarna | Sy No. 144, Dandupalya Village, Kasaba Hobli, Hoskote Taluk | Ongoing | Sep 2027 | Not due yet |
| Sanjeevini Sanctuary | Sy No. 37/1, Katha No. 890/259, Nallurahalli Village, K R Puram Hobli | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Rural
Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.
Keep SANJEEVINI HELICONIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Rural650+ in Bengaluru Rural
Filed coordinates, straight-line distance. 23 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
DS MAX SKY FIELDS
DS Max Properties Private Limited
Sowparnika Rhythm of Rain
SOWPARNIKA HOMES PRIVATE LIMITED
WORLD OF GARDENS
RLP TRENDSQUARES PROJECTS PRIVATE LIMITED
DS MAX SKYSAMPURN
DS MAX PROPERTIES PRIVATE LIMITED
Amrutha Lake Vista
Amrutha Shelters Private Limited
See every Bengaluru Rural project, with the district possession charts
Builder: Sanjeevini Projects
Sanjeevini Projects has 2 registrations on RERA Karnataka, including Sanjeevini Aarna and SANJEEVINI HELICONIA. Its filings declare 2 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.
Frequently asked questions
What are my rights if SANJEEVINI HELICONIA is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SANJEEVINI HELICONIA?
The registered promoter entity is Sanjeevini Projects, a partnership firm as per the filing. Its GSTIN 29ACJFS0131K1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SANJEEVINI HELICONIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SANJEEVINI HELICONIA?
The professionals named in the filing: Architect: B V Narendranath Reddy; Engineer: Chanakya N; Chartered Accountant: Nirmala Sreenivasulu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SANJEEVINI HELICONIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback