Home / Browse projects / Uttara Kannada, Karnataka / ROSH RESIDENCY

Registration approved No litigation declared Mixed Development project

ROSH RESIDENCY

By Ramesh Ganesh Rane

RG-KA-76827 · RERA PRM/KA/RERA/1274/351/PR/181122/005467 · Last updated on RERA Karnataka portal: 3 Nov 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 99 documents Report an error

ROSH RESIDENCY is a Mixed Development project by Ramesh Ganesh Rane in Uttara Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1274/351/PR/181122/005467 on 18 Nov 2022. Possession is promised by 31 Dec 2024.

At a glance

Project

  • NameROSH RESIDENCY
  • TypeMixed Development
  • Location
    • Karwar
    • Uttara Kannada
    • 581352
  • Pincode581352
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1274/351/PR/181122/005467
  • ReraGenie IDRG-KA-76827

Builder

  • NameRamesh Ganesh Rane
  • Entity typeProprietorship Firm
  • Authorized SignatoryRamesh Ganesh Rane

Key dates

this monthRegisteredNov 2022PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Nov 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROSH RESIDENCY-----9

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 3 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 3 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area354 sq m
Named landowners1
LandownerVillageDistrict
Ramesh Ganesh Rane--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.81 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.81 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJyoschna Mohanty
EngineerVidhyadhar shambu sinai Kakodkar
Chartered AccountantSuresh kumar saini

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed99

As listed on the registration, under the names the promoter filed them with; the newest 80 of 99 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1274/351/PR/181122/005467 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Estimate AbstractFile: Estimate by Architect.pdf3 Nov 2022
form-2File: Architect certificate for RERA Reg.pdf3 Nov 2022
Form-3File: Engineer certificate for RERA Reg.pdf3 Nov 2022
balance sheet of last 3 years.File: BS and PL.pdf12 Oct 2022
ec from 01-04-2005 to 1-04-2010 in form 15File: EC 2005 to 2022.pdf12 Oct 2022
land owners signature needed in no litigation affidavitFile: Non Litigation20220810_11334765.pdf12 Oct 2022
Commercial ClarificationFile: Conversion clarification.pdf12 Oct 2022
Commercial ClarificationFile: Karwar ZR for Commercial Zone Clarification.pdf12 Oct 2022
Upload Commencement Certificate.File: Commencement certificate.pdf12 Oct 2022
Upload Relinquishment deed of the road widening area.File: Relinquishment Deed for Road to PWD.pdf12 Oct 2022
FAR as per sanction plan.File: Area detail with Approved Plan.pdf12 Oct 2022
Area details as per Approved PlanFile: Area detail with Approved Plan.pdf12 Oct 2022
Area details statementFile: Area detail with Approved Plan.pdf12 Oct 2022
Engineer certificate with Cost detailFile: Engineer certificate with cost details.pdf12 Oct 2022
CA CertificateFile: CA certificate for Cost details.pdf12 Oct 2022
brief estimated cost of construction certified by the Engineer.File: Engineer Cost estimate certificate.pdf12 Oct 2022
Upload Proprietorship registration certificateFile: GST Registration Certificate.pdf27 Aug 2022
Upload chartered accountant certificate in prescribed format form-01File: CA certificate for Registration.pdf27 Aug 2022
Upload profit and loss account and balance sheet for last 3 yearsFile: Declaration for Accounts.pdf27 Aug 2022
need title deed of pradeep bhikru kadan and prashant bhikra kadanFile: Mother deed-Pradeep B kadam and Prashant B Kadam.pdf27 Aug 2022
converion is made only for commercial need conversion order for commercial and residentialFile: evidence for commercial zone conversion.pdf27 Aug 2022
need ec from 01-04-2005 to 1-04-2010 in form 15File: EC from2005-2010.pdf27 Aug 2022
Need to upload the certified copy obtained by the concerned Sub-registrar regarding value of theFile: Land value as per sub-registar.pdf27 Aug 2022
Need notarized Non- litigation affidavit with respect the property regarding land acquisition, courFile: Non Litigation20220810_11334765.pdf27 Aug 2022
Upload Commencement CertificateFile: Panchayat NOC.pdf27 Aug 2022
Upload Relinquishment deed of the road widening areaFile: Relinquishment deed for Road widening.pdf27 Aug 2022
Upload Village map demarcation of the proposed site.File: Village Map-Demarcation.pdf27 Aug 2022
upload CDP Plan demarcation of the proposed siteFile: CDP Plan.pdf27 Aug 2022
5) FAR As per the sanction Plan is Not Matching with the details Entered. 6) Area details the projecFile: Area Statement.pdf27 Aug 2022
Please upload the Engineer certificateFile: Engineer certificate for RERA Reg.pdf27 Aug 2022
Please update the Cost details as per certificates issued by the Engineer and CA.File: CA certificate for Registration.pdf27 Aug 2022
Please upload the Engineer License certificate issued by local authority or clarify the same.File: Structural eng registration certificate.pdf27 Aug 2022
Please upload the Certificate from Registered Engineer indicating the structural safety of the propoFile: Stability certificate.pdf27 Aug 2022
Please upload the copy of fee paid receipt paid towards power supply NOC.File: fee receipt HESCOM.pdf27 Aug 2022
Please upload the copy of fee paid receipt paid towards Water supply andFile: Water NOC20220810_11004886.pdf27 Aug 2022
10) In the uploaded proforma of Agreement for sale, The clause "A" not updated properly and The LocaFile: Revised AOS.pdf27 Aug 2022
11) Provision of STP/Septic Tank, Soak pit and sewer line system in the project is to be clarified bFile: Septic tank demarcation.pdf27 Aug 2022
Declaration for Query dated 18-08-2022File: Reply to querry-1.pdf27 Aug 2022
RTC, survey 530*1B3A-
Mutation, survey 530*1B3A-
Encumbrance Certificate, survey 530*1B3A-
Conversion/Alienation Order, survey 530*1B3A-
Sale/Title/Gift Deed, survey 530*1B3A-
Khatha, survey 530*1B3A-
Registration CertificateFile: GST Registration Certificate.pdf-
Certificate issued by CA Form 1File: CA certificate for Registration.pdf-
Certificate issued by Architect Form 2File: Architect certificate for RERA Reg.pdf-
Certificate issued by Engineer Form 3File: Engineer certificate for RERA Reg.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit20220810_11363630.pdf-
Certificate from Chartered AccountFile: CA certificate for Registration.pdf-
Balance Sheet 2020 - 2021File: ITR DECLARATION.pdf-
Balance Sheet 2019 - 2020File: ITR DECLARATION.pdf-
Balance Sheet 2018 - 2019File: ITR DECLARATION.pdf-
Audited Profit and Loss Statement 2020 - 2021File: ITR DECLARATION.pdf-
Audited Profit and Loss Statement 2019 - 2020File: ITR DECLARATION.pdf-
Audited Profit and Loss Statement 2018 - 2019File: ITR DECLARATION.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 22-23 Acknowledgement.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 21-22 ITR Acknowlegdement.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITR 20-21 ITR Acknowlegdement.pdf-
Panchayat Building Permission-
HESCOM NOC20220810_11035393-
Water NOC20220810_11004886-
Permission Drawing-
Permission Drawing-
Permission Drawing-
Permission Drawing-
Permission Drawing-
Project specification-
Single layout-
Permission Drawing-
Legal Search Report20220810_10534996-
NA-conversion-
NA-conversion-
Agreement of Sale Proforma Rosh Residency-
Allotment Letter-
Form B-120220810_11411391-
Affidavit20220810_11363630-

How this compares with Uttara Kannada

22%of Uttara Kannada projects moved their completion datethis one has not
0%of Uttara Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 100+ Uttara Kannada projects on ReraGenie, from their own filings.

Keep ROSH RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Uttara Kannada100+ in Uttara Kannada

2 kmROSH RESIDENCYOther 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: Ramesh Ganesh Rane

Ramesh Ganesh Rane has 1 registration on RERA Karnataka, including ROSH RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Uttara Kannada district page.

Frequently asked questions

What are my rights if ROSH RESIDENCY is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ROSH RESIDENCY?

The registered promoter entity is Ramesh Ganesh Rane, a proprietorship firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ROSH RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ROSH RESIDENCY?

The professionals named in the filing: Architect: Jyoschna Mohanty; Engineer: Vidhyadhar shambu sinai Kakodkar; Chartered Accountant: Suresh kumar saini. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROSH RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROSH RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROSH RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.