ReraGenieLog inGet a buyer report

Home / Browse projects / Uttara Kannada, Karnataka / PK GRAHABAGYA YOJANE

Registration approved No litigation declared Residential/Group Housing project

PK GRAHABAGYA YOJANE

By CHIEF OFFICER TOWN MUNICIPAL COUNCIL KUMTA

RG-KA-45054 · RERA PRM/KA/RERA/1274/356/PR/130325/007579 · Last updated on RERA Karnataka portal: 18 Feb 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2022Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 47 documents Report an error

PK GRAHABAGYA YOJANE is a Residential/Group Housing project by CHIEF OFFICER TOWN MUNICIPAL COUNCIL KUMTA in Uttara Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1274/356/PR/130325/007579 on 13 Mar 2025. Possession is promised by 31 Mar 2022.

At a glance

Project

  • NamePK GRAHABAGYA YOJANE
  • TypeResidential/Group Housing
  • Location
    • Kumta
    • Uttara Kannada
    • 581343
  • Pincode581343
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1274/356/PR/130325/007579
  • ReraGenie IDRG-KA-45054

Builder

  • NameCHIEF OFFICER TOWN MUNICIPAL COUNCIL KUMTA
  • Entity typeRajiv Gandhi Housing Corporation Limited
  • Authorized SignatoryCHIEF OFFICER

Key dates

Registered
13 Mar 2025
Promised
31 Mar 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on13 Mar 2025
  • Promised completion31 Mar 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block-1---10010
Block-2---808

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 18 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 18 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,634 sq m
Named landowners1
LandownerVillageDistrict
TOWN MUNICIPAL COUNCIL KUMTA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.35 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.35 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSantosh R Naik
EngineerSantosh R Naik
Chartered AccountantSANTOSH R NAIK

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed47

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1274/356/PR/130325/007579 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
13. copy of the Power supply NOC is attached and water supply NOC is Not applicable.File: Elecricity & Water NOC.pdf18 Feb 2025
14. STP/Septic Tank, Soak pit and sewer line demarcation drawingFile: Septic tank and sewer line.pdf18 Feb 2025
16. Source of water is Municipal Water supplied by ourself and open well waterFile: Source of water.pdf18 Feb 2025
1. Chartered Accountant certificateFile: CA certificate.pdf18 Feb 2025
2. profit and loss account, balance sheet and ITR for 2021-22, 2022-23 & 2023-24 with scheduleFile: Balance Sheet Statement & Schedule kumta_compressed.pdf18 Feb 2025
RTC, survey 556-
Mutation, survey 556-
Encumbrance Certificate, survey 556-
Khatha, survey 556-
Registration CertificateFile: Office PAN.jpg-
GST CertificateFile: GST.jpeg-
Certificate issued by CA Form 1File: NA (1).pdf-
Certificate issued by Architect Form 2File: NA (1).pdf-
Certificate issued by Engineer Form 3File: NA (1).pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: 135 lakh pkgb.pdf-
Certificate from Chartered AccountFile: RTC PKGB SY No 556.jpeg-
Balance Sheet 2023 - 2024File: Balance Sheet & Schedule_20-21-compressed.pdf-
Drawing signed 04-01-2022-
Drawing signed 04-01-2022-
Drawing signed 04-01-2022-
Drawing signed 04-01-2022-
Drawing signed 04-01-2022-
Drawing signed 04-01-2022-
Drawing signed 04-01-2022-
Unnamed document-
Unnamed document-
Unnamed document-
NA (1)-
NA (1)-
NA (1)-
NA (1)-
NA (1)-
NA (1)-
NA (1)-
NA (1)-
NA (1)-
NA (1)-
NA (1)-
NA (1)-
NA (1)-
NA (1)-
NA (1)-
Unnamed document-
NA (1)-

How this compares with Uttara Kannada

22%of Uttara Kannada projects moved their completion datethis one has not
0%of Uttara Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 100+ Uttara Kannada projects on ReraGenie, from their own filings.

Keep PK GRAHABAGYA YOJANE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Uttara Kannada100+ in Uttara Kannada

Builder: CHIEF OFFICER TOWN MUNICIPAL COUNCIL KUMTA

CHIEF OFFICER TOWN MUNICIPAL COUNCIL KUMTA has 1 registration on RERA Karnataka, including PK GRAHABAGYA YOJANE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Uttara Kannada district page.

Frequently asked questions

What are my rights if PK GRAHABAGYA YOJANE is delayed beyond 31 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of PK GRAHABAGYA YOJANE?

The registered promoter entity is CHIEF OFFICER TOWN MUNICIPAL COUNCIL KUMTA, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in PK GRAHABAGYA YOJANE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at PK GRAHABAGYA YOJANE?

The professionals named in the filing: Architect: Santosh R Naik; Engineer: Santosh R Naik; Chartered Accountant: SANTOSH R NAIK. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PK GRAHABAGYA YOJANE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PK GRAHABAGYA YOJANE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PK GRAHABAGYA YOJANE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.