Home / Browse projects / Vadodara, Gujarat / PEARL ELEGANCE

Valid until 30 Apr 2028 Residential/Group Housing project

PEARL ELEGANCE

By PRATITI HOMESPACE

RG-GJ-98532 · RERA PR/GJ/VADODARA/VADODARA/Vadodara Urban Development Authority/RAA13799/050724/311227 · Last updated on GujRERA portal: 5 Jul 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2028Possession promisedno revision filed
5 of 54Construction stages doneacross 6 buildings; furthest along: Excavation, 60%
13 of 17Units unsoldnot recorded sold or booked
Jump to the 28 documents Report an error

PEARL ELEGANCE is a Residential/Group Housing project by PRATITI HOMESPACE in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Vadodara Urban Development Authority/RAA13799/050724/311227 on 5 Jul 2024. Possession is promised by 30 Apr 2028. 4 of the 17 units on this registration are recorded sold or booked, and 5 of 54 construction stages are filed complete.

At a glance

Project

  • NamePEARL ELEGANCE
  • TypeResidential/Group Housing
  • Location
    • BS. BANSIDHAR DUPLEX
    • NR KESAR-45
    • VADODARA-DABHOI ROAD
    • KAPURAI
    • KAPURAI
    • Vadodara
    • 390004
  • Pincode390004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Vadodara Urban Development Authority/RAA13799/050724/311227
  • ReraGenie IDRG-GJ-98532

Builder

  • NamePRATITI HOMESPACE
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredJul 2024PromisedApr 2028

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2028
  • Registered on5 Jul 2024
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings6 building records
  • Documents filed28 files

Current status

24%4 of 17 units booked
1.7%Of the estimated cost spent so far

Figures as on 5 Jul 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE-A3---505
TYPE-B1---303
TYPE-B---202
TYPE-A---505
TYPE-A1---101
TYPE-A2---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building6

As on 5 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 54 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 60%.

TYPE-A344%
ActivityProgress
Excavation60%
Podiums (if any)Not applicable
Plinth60%
Stilt Floor40%
Slabs of Super Structure60%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats40%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing40%
TYPE-B19%
ActivityProgress
Excavation40%
Podiums (if any)Not applicable
Plinth40%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE-B9%
ActivityProgress
Excavation40%
Podiums (if any)Not applicable
Plinth40%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE-A8%
ActivityProgress
Excavation50%
Podiums (if any)Not applicable
Plinth25%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE-A17%
ActivityProgress
Excavation30%
Podiums (if any)Not applicable
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
TYPE-A256%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities23

As on 5 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes20%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyYes0%
SecurityYes0%
Letter boxYes0%
Compound wallYes0%
Plinth protectionYes0%
Water tankYes0%
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,283 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 4.09 cr
Cost incurredRs 6.85 lakh
Spent of the estimate1.67%
BuildingWingEstimatedIncurred
TYPE-ANARs 1.22 crRs 2.50 lakh
TYPE-A3NARs 1.22 crRs 2.85 lakh
TYPE-B1NARs 69.71 lakh-
TYPE-BNARs 46.47 lakh-
TYPE-A1NARs 24.08 lakh-
TYPE-A2NARs 24.08 lakhRs 1.50 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRENIK RAJENDRAKUMAR SONI
EngineerASHISH RAMANLAL SOLANKI

Documents filed28

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Vadodara Urban Development Authority/RAA13799/050724/311227 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RERA registration certificate5 Jul 2024
Engineer's certificate (Form 2)25 Jun 2024
Engineer's certificate annexure25 Jun 2024
Proforma agreement for sale-
Auditor's report (3 of 3)-
Income tax return (3 of 3)-
Project specific document-
Drainage affidavit-
Directors' report (3 of 3)-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Statutory document-
Project photograph-
Proforma sale deed-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

24%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep PEARL ELEGANCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near KAPURAI2,900+ in Vadodara

2 kmPEARL ELEGANCEOther 167Dot size: filed unitsN

Filed coordinates, straight-line distance. 167 registered projects within 2 km.

Builder: PRATITI HOMESPACE

PRATITI HOMESPACE has 1 registration on GujRERA, including PEARL ELEGANCE. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if PEARL ELEGANCE is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of PEARL ELEGANCE?

The registered promoter entity is PRATITI HOMESPACE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in PEARL ELEGANCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at PEARL ELEGANCE?

The professionals named in the filing: Architect: SHRENIK RAJENDRAKUMAR SONI; Engineer: ASHISH RAMANLAL SOLANKI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PEARL ELEGANCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PEARL ELEGANCE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PEARL ELEGANCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.