Valid until 1 Jun 2022 Mixed Development project

KUBER CITY

By KUBER HEIGHTS

RG-GJ-65096 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA02974/220618 · Last updated on GujRERA portal: 7 Apr 2022

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Jun 2022Possession promisedno revision filed
5 of 25Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 90%
37 of 211Units unsoldnot recorded sold or booked
Jump to the 40 documents Report an error

KUBER CITY is a Mixed Development project by KUBER HEIGHTS in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA02974/220618 on 22 Jun 2018. Possession is promised by 1 Jun 2022. 174 of the 211 units on this registration are recorded sold or booked, and 5 of 25 construction stages are filed complete.

At a glance

Project

  • NameKUBER CITY
  • TypeMixed Development
  • Location
    • 75 Mtr. Main Road
    • New Waghodia Dabhoi Ring Road
    • Ratanpur
    • Vadodara
    • 390004
  • Pincode390004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA02974/220618
  • ReraGenie IDRG-GJ-65096

Builder

  • NameKUBER HEIGHTS
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredJun 2018PromisedJun 2022

Key facts

Registration and timeline

  • StatusValid until 1 Jun 2022
  • Registered on22 Jun 2018
  • Promised completion1 Jun 2022
  • Revised completionNone
  • Buildings3 building records
  • Documents filed40 files

Current status

82%174 of 211 units booked
85.5%Of the estimated cost spent so far

Figures as on 7 Apr 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER D+E------
DUPLEX---79079
TOWER A+B+C---7854132

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 7 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 25 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

TOWER D+E0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
DUPLEX54%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
TOWER A+B+C69%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing85%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing60%

Progress on shared amenities19

As on 7 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes70%
Water supplyYes70%
Sewerage (chamber, lines, septic tank, STP)Yes65%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes30%
Street lightingYes65%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area21,093 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 13.87 cr
Cost incurredRs 11.86 cr
Spent of the estimate85.53%
BuildingWingEstimatedIncurred
TOWER A+B+CNARs 4.62 crRs 3.95 cr
TOWER D+ENARs 4.62 crRs 3.95 cr
DUPLEXNARs 4.62 crRs 3.95 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRISHI ARCHIECT
EngineerZARNA ASSOCIATES

Documents filed40

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA02974/220618 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)7 Apr 2022
Engineer's certificate (Form 2)7 Apr 2022
Engineer's certificate annexure7 Apr 2022
Accountant's certificate (Form 3)7 Apr 2022
Site photograph, TOWER D+E7 Apr 2022
Site photograph, DUPLEX7 Apr 2022
Site photograph, TOWER A+B+C7 Apr 2022
RERA registration certificate22 Jun 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

82%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep KUBER CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Ratanpur2,900+ in Vadodara

2 kmKUBER CITYOther 103Dot size: filed unitsN

Filed coordinates, straight-line distance. 103 registered projects within 2 km.

Builder: KUBER HEIGHTS

KUBER HEIGHTS has 1 registration on GujRERA, including KUBER CITY. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if KUBER CITY is delayed beyond 1 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of KUBER CITY?

The registered promoter entity is KUBER HEIGHTS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in KUBER CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at KUBER CITY?

The professionals named in the filing: Architect: RISHI ARCHIECT; Engineer: ZARNA ASSOCIATES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUBER CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUBER CITY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUBER CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.