  • Completion date moved by 28 months
  • 2 extensions taken

Clear

  • Nothing verified clear yet
Apr 2027Possession promisedmoved 28 months from the original
20 of 36Construction stages doneacross 4 buildings; furthest along: Stilt Floor, 67%
8 of 27Units unsoldnot recorded sold or booked
Jump to the 38 documents Report an error

OM RESIDENCY is a Residential/Group Housing project by OM SHREE ENTERPRISE in Anand, Gujarat, registered with GujRERA as PR/GJ/ANAND/BORSAD/Others/RAA08099/EX1/100625/311225 on 22 Feb 2021. Possession is promised by 30 Apr 2027. The completion date has moved by 28 months from the original filing. 19 of the 27 units on this registration are recorded sold or booked, and 20 of 36 construction stages are filed complete.

At a glance

Project

  • NameOM RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • OM RESIDENCY
    • B/H MARUTI HOSPITAL
    • NEAR SURYA MANDIR
    • Borsad
    • Anand
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/ANAND/BORSAD/Others/RAA08099/EX1/100625/311225
  • ReraGenie IDRG-GJ-01024

Builder

  • NameOM SHREE ENTERPRISE
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredFeb 2021First promiseDec 2024Revised toApr 2027

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2027
  • Registered on22 Feb 2021
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 31 Dec 2024)
  • Buildings4 building records
  • Documents filed38 files

Current status

70%19 of 27 units booked
52.9%Of the estimated cost spent so far

Figures as on 30 Dec 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Type A---202
Type B---303
Type C---606
Type D---16016

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 30 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Stilt Floor, at 67%.

Type A72%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor50%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing50%
Type B78%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor67%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats67%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing67%
Type C83%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor67%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats67%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing50%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing67%
Type D80%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor62%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats62%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing40%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing56%

Progress on shared amenities23

As on 30 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes75%
Water supplyYes80%
Sewerage (chamber, lines, septic tank, STP)Yes80%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes30%
Street lightingYes30%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable
Compound wallYes80%
Plinth protectionYes80%
Water tankYes80%
Other requirementsNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,952 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 3.40 cr
Cost incurredRs 1.80 cr
Spent of the estimate52.94%
BuildingWingEstimatedIncurred
Type DNARs 2.12 crRs 1.11 cr
Type CNARs 70.00 lakhRs 45.00 lakh
Type BNARs 35.00 lakhRs 15.00 lakh
Type ANARs 23.00 lakhRs 9.00 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR. KARNAVKUMAR KAMLESHBHAI PATEL
EngineerPATEL DAHYABHAI HARGOVINDDAS

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/ANAND/BORSAD/Others/RAA08099/EX1/100625/311225Applied Dec 2024; approved Jun 2025
ExtensionApplied Mar 2026; no approval date filed

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/ANAND/BORSAD/Others/RAA08099/EX1/100625/311225 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)30 Dec 2024
Engineer's certificate annexure30 Dec 2024
RERA registration certificate22 Feb 2021
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Anand

70%of this project is bookeddistrict median 57%
17%of Anand projects moved their completion datethis one moved by 28 months

Computed across the 310+ Anand projects on ReraGenie, from their own filings.

Keep OM RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Anand310+ in Anand

Builder: OM SHREE ENTERPRISE

OM SHREE ENTERPRISE has 1 registration on GujRERA, including OM RESIDENCY. Read the full track record. See more projects on the Anand district page.

Frequently asked questions

What are my rights if OM RESIDENCY is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of OM RESIDENCY?

The registered promoter entity is OM SHREE ENTERPRISE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in OM RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at OM RESIDENCY?

The professionals named in the filing: Architect: MR. KARNAVKUMAR KAMLESHBHAI PATEL; Engineer: PATEL DAHYABHAI HARGOVINDDAS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM RESIDENCY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.