ReraGenieLog inGet a buyer report

Home / Browse projects / Uttara Kannada, Karnataka / NISHA RESIDENCY-PHASE 1

Registration approved No litigation declared Residential/Group Housing project

NISHA RESIDENCY-PHASE 1

By PRADEEP DATTA BANDEKAR

RG-KA-87001 · RERA PRM/KA/RERA/1274/351/PR/150423/005866 · Last updated on RERA Karnataka portal: 24 Mar 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 102 documents Report an error

NISHA RESIDENCY-PHASE 1 is a Residential/Group Housing project by PRADEEP DATTA BANDEKAR in Uttara Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1274/351/PR/150423/005866 on 15 Apr 2023. Possession is promised by 31 Dec 2024.

At a glance

Project

  • NameNISHA RESIDENCY-PHASE 1
  • TypeResidential/Group Housing
  • Location
    • Karwar
    • Uttara Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1274/351/PR/150423/005866
  • ReraGenie IDRG-KA-87001

Builder

  • NamePRADEEP DATTA BANDEKAR
  • Entity typeProprietorship Firm
  • Authorized SignatoryPradeep Datta.Bandekar

Key dates

this monthRegisteredApr 2023PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Apr 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NISHA RESIDENCY PHASE-1---16016

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 24 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 24 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Pradeep Datta Bandekar--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.47 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 3.47 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKanchan S Vernekar
EngineerMahesh Basanna
Chartered AccountantKiran K Kenikar

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed102

As listed on the registration, under the names the promoter filed them with; the newest 80 of 102 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1274/351/PR/150423/005866 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
sources of fund to complete the projectFile: Reply to 5th query.pdf24 Mar 2023
What are all the sources of fund to complete the project.File: Funding letter from St Milagrese Karwar.pdf10 Mar 2023
What are all the sources of fund to complete the project.File: Reply to query 4.pdf10 Mar 2023
Once again updated Total Open Area is incorrect, in the open area, road area not included. thereforeFile: Reply to query 4.pdf10 Mar 2023
Designated bank account number not matched with CA certificateFile: Revised Form-1.pdf23 Feb 2023
Designated bank account number not matched with CA certificateFile: SBI letter for change of bank account.pdf23 Feb 2023
Designated bank account number not matched with CA certificateFile: Designated bank account.pdf23 Feb 2023
Once again updated Built up area, Open area details are incorrect, please check the drawing and updaFile: Clarification and reply to 3rd querry.pdf23 Feb 2023
Not updated. Since the project is ongoing, please update the project ongoing status with the expendiFile: Clarification and reply to 3rd querry.pdf23 Feb 2023
Designated bank account number not matched with CA certificateFile: Clarification and reply to 3rd querry.pdf23 Feb 2023
Upload Proprietorship registration certificateFile: Proprietorship Registration certificate.pdf7 Feb 2023
Total area as per plan and in project details not matchedFile: Revised area statement.pdf7 Feb 2023
title deed of pradeep dattaFile: Tittle deed.pdf7 Feb 2023
certified copy obtained by the concerned Sub-registrar regarding value of the property on the basFile: Guidance value Signed-31012023.pdf7 Feb 2023
certified copy obtained by the concerned Sub-registrar regarding value of the property on the basFile: Revised Form-1 07022023.pdf7 Feb 2023
updated area details are incorrect, please check the drawing and update the area details properly asFile: Revised area statement.pdf7 Feb 2023
Engineer address is very much faraway from the project therefore please upload the local project EngFile: Clarification for Site Engineer.pdf7 Feb 2023
Please upload the Certificate from Registered Engineer indicating the structural safety adopted forFile: Stability Certificate.pdf7 Feb 2023
Allotment in the prescribed format as available in the RERA web portalFile: proforma allotment letter revised.pdf7 Feb 2023
letter is for temporary power supply, Therefore Please upload the NOC issued by HESCOM.File: HESCOM NOC.pdf7 Feb 2023
Upload Proprietorship registration certificateFile: GST Registration.pdf13 Jan 2023
Bank account name should be as per bank account direction circularFile: RERA Designated Account.pdf13 Jan 2023
profit and loss account 2020File: Profit and Loss Account March 2020.pdf13 Jan 2023
BS 2020File: Balance Sheet March 2020.pdf13 Jan 2023
schedule 2020File: Schedule 2020.pdf13 Jan 2023
profit and loss account 2021File: P&L March 2021.pdf13 Jan 2023
BS 2021File: BS March 2021.pdf13 Jan 2023
schedule 2021File: Shedules 2021.pdf13 Jan 2023
profit and loss account 2022File: P&L March 2022.pdf13 Jan 2023
BS 2021File: BS March 2022.pdf13 Jan 2023
schedule 2022File: Schedule 2022.pdf13 Jan 2023
Total area as per plan and in project details not matchedFile: Revised Area Statement 13012023.pdf13 Jan 2023
need title deed of pradeep dattaFile: Sale deed.pdf13 Jan 2023
Upload village map showing the proposed site.File: Shirwad Village Map.pdf13 Jan 2023
Upload village map showing the proposed site.File: Village Map with Site demarcation.pdf13 Jan 2023
Upload certified Carpet area calculation.File: Revised Area Statement 13012023.pdf13 Jan 2023
Upload village map showing the proposed siteFile: Village Map with Site demarcation.pdf13 Jan 2023
Updated area details are incorrect, Therefore please update the area details properly as per the appFile: Revised Area Statement 13012023.pdf13 Jan 2023
No of parking lots details are not properly updated, please update the same or clarify the detailsFile: Revised Area Statement 13012023.pdf13 Jan 2023
Upload the proforma of Allotment in the prescribed formatFile: Proforma Allotment.pdf13 Jan 2023
Please mention the timeline completion date in the Para 7.1 and upload the proforma of Agreement forFile: AOS.pdf13 Jan 2023
Please upload the clearly visible coloured copy (as received) of Water supply NOC's.File: Water NOC.pdf13 Jan 2023
Please upload the clearly visible coloured copy (as received) of HESCOM NOC's.File: HESCOM Power sanction .pdf13 Jan 2023
Please upload the STP/Septic tank, Soak pit and sewer line demarcation drawingFile: Septic tank demarcation drawing.pdf13 Jan 2023
Please upload the reason for delay in RERA registration along with the sold and unsold details of flFile: Declaration for Delay in Registration of Project in RERA.pdf13 Jan 2023
RTC, survey 105 Hissa 3A1-
Mutation, survey 105 Hissa 3A1-
Encumbrance Certificate, survey 105 Hissa 3A1-
Conversion/Alienation Order, survey 105 Hissa 3A1-
Sale/Title/Gift Deed, survey 105 Hissa 3A1-
Khatha, survey 105 Hissa 3A1-
Registration CertificateFile: Proprietorship Registration certificate.pdf-
Certificate issued by CA Form 1File: Revised Form-1.pdf-
Certificate issued by Architect Form 2File: Form-2 for Registration.pdf-
Certificate issued by Engineer Form 3File: Form-3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation Affidavit.pdf-
Balance Sheet 2021 - 2022File: BS March 2022.pdf-
Balance Sheet 2020 - 2021File: BS March 2021.pdf-
Balance Sheet 2019 - 2020File: Balance Sheet March 2020.pdf-
Audited Profit and Loss Statement 2021 - 2022File: P&L March 2022.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P&L March 2021.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profit and Loss Account March 2020.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Income Tax Acknowlegement March 2022.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: Income Tax Acknowledgement March 2021.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: IT Acknowlegdement March 2020.pdf-
Commencement certificate-
HESCOM Power sanction-
Water NOC-
SIngle Layout-
Approved Building drawing-
SIngle Layout-
Approved Building drawing-
Approved Building drawing-
Project Specification-
Approved Building drawing-
Approved Building drawing-
Title Search Report-

How this compares with Uttara Kannada

22%of Uttara Kannada projects moved their completion datethis one has not
0%of Uttara Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 100+ Uttara Kannada projects on ReraGenie, from their own filings.

Keep NISHA RESIDENCY-PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Uttara Kannada100+ in Uttara Kannada

Builder: PRADEEP DATTA BANDEKAR

PRADEEP DATTA BANDEKAR has 1 registration on RERA Karnataka, including NISHA RESIDENCY-PHASE 1. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Uttara Kannada district page.

Frequently asked questions

What are my rights if NISHA RESIDENCY-PHASE 1 is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of NISHA RESIDENCY-PHASE 1?

The registered promoter entity is PRADEEP DATTA BANDEKAR, a proprietorship firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in NISHA RESIDENCY-PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NISHA RESIDENCY-PHASE 1?

The professionals named in the filing: Architect: Kanchan S Vernekar; Engineer: Mahesh Basanna; Chartered Accountant: Kiran K Kenikar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NISHA RESIDENCY-PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NISHA RESIDENCY-PHASE 1. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NISHA RESIDENCY-PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.