ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / NATHDWAR RESICOM

Valid until 30 Apr 2028 Mixed Development project

NATHDWAR RESICOM

By BALAJI ENTERPRISE

RG-GJ-92736 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA10049/A1M/270923 · Last updated on GujRERA portal: 22 Oct 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2028Possession promisedno revision filed
11 of 63Construction stages doneacross 7 buildings; furthest along: External plumbing and external plaster, 88%
82 of 226Units unsoldnot recorded sold or booked
Jump to the 38 documents Report an error

NATHDWAR RESICOM is a Mixed Development project by BALAJI ENTERPRISE in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA10049/A1M/270923 on 20 Apr 2022. Possession is promised by 30 Apr 2028. 144 of the 226 units on this registration are recorded sold or booked, and 11 of 63 construction stages are filed complete.

At a glance

Project

  • NameNATHDWAR RESICOM
  • TypeMixed Development
  • Location
    • "NATHDWAR RESICOM"
    • F. P. NO - 429
    • T. P. NO - 04
    • NEAR PRABHU NAGAR
    • B/H. ZAVER NAGAR
    • PRABHAT CHAR RASTA
    • WAGHODIA ROAD
    • VADODARA - 390019
    • Vadodara
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA10049/A1M/270923
  • ReraGenie IDRG-GJ-92736

Builder

  • NameBALAJI ENTERPRISE
  • Entity typePARTNERSHIP FIRM
  • Other registrations10 more →

Key dates

this monthRegisteredApr 2022PromisedApr 2028

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2028
  • Registered on20 Apr 2022
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings7 building records
  • Documents filed38 files

Current status

64%144 of 226 units booked
48.0%Of the estimated cost spent so far

Figures as on 22 Oct 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B---28735
A---28836
D---28735
C---28836
F---28028
E---28028
G---28028

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building7

As on 22 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 63 construction stages are filed complete across 7 buildings. The stage furthest along is External plumbing and external plaster, at 88%.

B43%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor3%
Slabs of Super Structure86%
Internal walls, internal plaster, floorings, doors and windows within flats62%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks38%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
A19%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure38%
Internal walls, internal plaster, floorings, doors and windows within flats25%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
D33%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor3%
Slabs of Super Structure88%
Internal walls, internal plaster, floorings, doors and windows within flats62%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks38%
External plumbing and external plaster, elevation, completion of terraces with waterproofing11%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
C26%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure62%
Internal walls, internal plaster, floorings, doors and windows within flats38%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing8%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
F36%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor4%
Slabs of Super Structure88%
Internal walls, internal plaster, floorings, doors and windows within flats75%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks38%
External plumbing and external plaster, elevation, completion of terraces with waterproofing18%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
E61%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor21%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats21%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing88%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing21%
G26%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, internal plaster, floorings, doors and windows within flats25%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks38%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities23

As on 22 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes9%
Sewerage (chamber, lines, septic tank, STP)Yes13%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes28%
Street lightingYes9%
Community buildingsYes32%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes13%
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes24%
Letter boxYes0%
Compound wallYes8%
Plinth protectionYes0%
Water tankYes0%
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,574 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 28.01 cr
Cost incurredRs 13.46 cr
Spent of the estimate48.04%
BuildingWingEstimatedIncurred
BNARs 4.55 crRs 2.12 cr
DNARs 4.55 crRs 2.32 cr
ANARs 4.52 crRs 1.66 cr
CNARs 4.51 crRs 1.93 cr
ENARs 3.37 crRs 1.93 cr
FNARs 3.25 crRs 1.79 cr
GNARs 3.25 crRs 1.70 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAHESH LAVJIBHAI RATHOD
EngineerAAKASH KHANVILKAR

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA10049/A1M/270923 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)22 Oct 2024
Engineer's certificate annexure22 Oct 2024
RERA registration certificate20 Apr 2022
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

64%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep NATHDWAR RESICOM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadodara2,900+ in Vadodara

2 kmNATHDWAR RESICOMOther 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 141 registered projects within 2 km.

Builder: BALAJI ENTERPRISE

BALAJI ENTERPRISE has 11 registrations on GujRERA, including MILLENIUM RESIDENCY and KASTURI RESIDENCY. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if NATHDWAR RESICOM is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of NATHDWAR RESICOM?

The registered promoter entity is BALAJI ENTERPRISE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in NATHDWAR RESICOM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NATHDWAR RESICOM?

The professionals named in the filing: Architect: MAHESH LAVJIBHAI RATHOD; Engineer: AAKASH KHANVILKAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NATHDWAR RESICOM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NATHDWAR RESICOM. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NATHDWAR RESICOM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.