Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
MUKUNDA NANDANAM is a Residential/Group Housing project by Mukunda Infra in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/030922/005213 on 3 Sep 2022. Possession is promised by 31 Dec 2025.
At a glance
Project
- NameMUKUNDA NANDANAM
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560067
- Pincode560067
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/030922/005213
- ReraGenie IDRG-KA-33895
Builder
- NameMukunda Infra
- Entity typePartnership Firm
- Authorized SignatoryB Chandra Sekhar Reddy
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on3 Sep 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings4 building records
- Documents filed139 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| D-Block | - | - | - | 64 | 0 | 64 |
| A-Block | - | - | - | 44 | 0 | 44 |
| B-Block | - | - | - | 8 | 0 | 8 |
| C-Block | - | - | - | 100 | 0 | 100 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 14 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| K.M.Ramamurthy | - | - |
| K.M.Ramamurthy | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 39.69 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Bommu Veera Narendranath Reddy |
| Engineer | INTURI VEERAIAH |
| Chartered Accountant | Ramesh Babu Lankipalli |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed139
As listed on the registration, under the names the promoter filed them with; the newest 80 of 139 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/030922/005213 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Upload quarterly updatesFile: CA Form 4 QTR30th June2023_000399.pdf | 14 Oct 2024 |
| Upload quarterly updatesFile: CA Form 4 QTR30th Sept2023_000400.pdf | 14 Oct 2024 |
| Upload quarterly updatesFile: CA Form 4 QTR31st Dec2023_000401.pdf | 14 Oct 2024 |
| Upload quarterly updatesFile: CA Form 4 QTR31st Mar2023_000398.pdf | 14 Oct 2024 |
| Upload quarterly updatesFile: Form-5, Architect (Q2)27FEB2024.pdf | 14 Oct 2024 |
| Upload quarterly updatesFile: Form-5, Architect (Q3)27FEB2024.pdf | 14 Oct 2024 |
| Upload quarterly updatesFile: Form-5, Architect (Q4)27FEB2024.pdf | 14 Oct 2024 |
| Upload quarterly updatesFile: Form-5, Architect 27FEB2024.pdf | 14 Oct 2024 |
| Upload quarterly updatesFile: Form -6, Engineer_(Q1)27FEB2024.pdf | 14 Oct 2024 |
| Upload quarterly updatesFile: Form -6, Engineer_(Q2)27FEB2024.pdf | 14 Oct 2024 |
| Upload quarterly updatesFile: Form -6, Engineer_(Q3)27FEB2024.pdf | 14 Oct 2024 |
| Upload quarterly updatesFile: Form -6, Engineer_(Q4)27FEB2024.pdf | 14 Oct 2024 |
| upload all documents related to revenue section for the newly added additional landFile: 29-4 convertion sketch and order.pdf | 14 Oct 2024 |
| upload all documents related to revenue section for the newly added additional landFile: 29-4 Ravi Kumar.pdf | 14 Oct 2024 |
| upload all documents related to revenue section for the newly added additional landFile: 29-4 santosh kumar.pdf | 14 Oct 2024 |
| upload all documents related to revenue section for the newly added additional landFile: 29-6 Ravikumar katha.pdf | 14 Oct 2024 |
| upload all documents related to revenue section for the newly added additional landFile: 29-7 santhosh kumar katha.pdf | 14 Oct 2024 |
| upload all documents related to revenue section for the newly added additional landFile: cc_BBMP_EoDB_CH_0014_23-24.pdf | 14 Oct 2024 |
| upload all documents related to revenue section for the newly added additional landFile: club katha sy no 1-1,1-9,29-6,29-4 & 29-7.pdf | 14 Oct 2024 |
| upload all documents related to revenue section for the newly added additional landFile: Infra valuation report.pdf | 14 Oct 2024 |
| upload all documents related to revenue section for the newly added additional landFile: Ravikumar INFRA GPA.pdf | 14 Oct 2024 |
| upload all documents related to revenue section for the newly added additional landFile: PRJ_13599_22-23.PDF | 14 Oct 2024 |
| upload all documents related to revenue section for the newly added additional landFile: Ravikumar INFRA JDA.pdf | 14 Oct 2024 |
| AffidavitFile: Affidavit cum Ceclaraion.pdf | 14 Oct 2024 |
| AffidavitFile: Affidavit.pdf | 14 Oct 2024 |
| AffidavitFile: Form -B.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: A-109.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: A-111.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: A-208.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: A-210.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: A-211.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: A-303.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: A-308.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: C-005.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: C-011.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: C-013.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: C-206.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: C-216.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: C-309.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: C-312.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE WRITTEN CONSENT OF 2/3RD ALLOTTEESFile: C-314.pdf | 14 Oct 2024 |
| PLEASE UPLOAD THE ENGINEER CERTIFICATE FOR MODIFICATION PLAN IN THE PRESCRIBED FORMATFile: engg certificate form.pdf | 14 Oct 2024 |
| RTCFile: ravi kumar rtc.pdf | 14 Oct 2024 |
| RTCFile: santhosh kumar rtc.pdf | 14 Oct 2024 |
| he promoter of this project is a partnership firm. Partnership deed has to be amended to reflect theFile: reconstitution deed.pdf | 29 Aug 2022 |
| he following clauses are not violative of the Act. The Developer shall be entitled to retain or haveFile: sale agreement-MUKUNDA NANDANAM final (1).pdf | 29 Aug 2022 |
| Form 1File: RERA Form 1_compressed.pdf | 30 Jul 2022 |
| Form 2File: Form -2, Architect (PR) (1)_compressed.pdf | 30 Jul 2022 |
| Form 3File: Form - 3, Engineer (PR) (1).pdf | 30 Jul 2022 |
| Uploaded Proforma of agreement (AFS) for sale not in accordance with the notified AFS by GOK. CertaiFile: sale agreement-MUKUNDA NANDANAM final (1).pdf | 21 Jul 2022 |
| upload 2021-22 financial statementFile: Financial statement 2021-2022.pdf | 14 Jul 2022 |
| upload bank pass sheetFile: Mukunda Infra BANK PASS SHEET.PDF | 14 Jul 2022 |
| pay balance fee of Rs.19176/-File: payment balance.pdf | 14 Jul 2022 |
| NEED EC FROM 01/05/2005 TO UPTO DATE IN FORM 15File: INFRA EC Sy No 1-1 & 1-9 May-01-2005 TO 21-06-2022.pdf | 14 Jul 2022 |
| NEED SALE DEED TO K M RAMMAMURTHY FOR SYNO 1/1 AND 1/9 SINCE UPLOADED PARTITION DEED NOT CLEARLY MENFile: mother deed merges.pdf | 14 Jul 2022 |
| NEED TITLE DEEDFile: mother deed merges.pdf | 14 Jul 2022 |
| NEED JA CUM DECLARTION IN RERA PRESCRIBED FORMATFile: affidavit cum declaration (1).pdf | 14 Jul 2022 |
| NEED NOTRAZIED FORM B IN RERA FORMATFile: FORM-B (1).pdf | 14 Jul 2022 |
| Need to upload the certified copy obtained by the concerned Sub-registrar regarding value of theFile: Infra valuation report.pdf | 14 Jul 2022 |
| Need notarized Non- litigation affidavit with respect the property regarding land acquisition, courFile: AFFiDAVIT litigation.pdf | 14 Jul 2022 |
| Upload single layout / Development Plan.File: single plot layout.pdf | 14 Jul 2022 |
| Upload single Layout sanction orderFile: judgement_merged.pdf | 14 Jul 2022 |
| Upload Location and Demarcation Drawing. (Village map demarcation)File: village map.pdf | 14 Jul 2022 |
| Upload Extract of Master Plan / Change of land useFile: cdp.pdf | 14 Jul 2022 |
| Upload Building LicenseFile: Mukund Licence (1).pdf | 14 Jul 2022 |
| Uploaded file could not able open, may due to special characters. Therefore please correct file ofFile: Form - 3, Engineer (PR) (1).pdf | 14 Jul 2022 |
| Please upload the signed copy of the project specification in the correct format/letter head if avaiFile: SPECIFICATION (2).pdf | 14 Jul 2022 |
| Please upload the section 3(1) notarized affidavit.File: affidavit -1 (1).pdf | 14 Jul 2022 |
| Please upload the proforma of Agreement of Sale notified by GOK, by incorporating the details of venFile: sale agreement-MUKUNDA NANDANAM final.pdf | 14 Jul 2022 |
| Please upload the Highlighted STP demarcation plan along with STP design drawingsFile: 165 kld-stp-Model.pdf | 14 Jul 2022 |
| Please upload the Advocate search reportFile: LEGAL OPINION-Sy No-1-1 & 1-9.pdf | 14 Jul 2022 |
| Please upload the NOC issued by BESCOMFile: Mukunda Infra BESCOM Noc.pdf | 14 Jul 2022 |
| Please upload the NOC issued by BWSSBFile: bwssb noc new.pdf | 14 Jul 2022 |
| RTC, survey 1/1 | - |
| Mutation, survey 1/1 | - |
| Encumbrance Certificate, survey 1/1 | - |
| Conversion/Alienation Order, survey 1/1 | - |
| Sale/Title/Gift Deed, survey 1/1 | - |
| JDA, survey 1/1 | - |
| Khatha, survey 1/1 | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep MUKUNDA NANDANAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 53 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
DS MAX SKY FIELDS
DS Max Properties Private Limited
Sowparnika Rhythm of Rain
SOWPARNIKA HOMES PRIVATE LIMITED
WORLD OF GARDENS
RLP TRENDSQUARES PROJECTS PRIVATE LIMITED
DS MAX SKYSAMPURN
DS MAX PROPERTIES PRIVATE LIMITED
Amrutha Lake Vista
Amrutha Shelters Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Mukunda Infra
Mukunda Infra has 1 registration on RERA Karnataka, including MUKUNDA NANDANAM. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if MUKUNDA NANDANAM is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of MUKUNDA NANDANAM?
The registered promoter entity is Mukunda Infra, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in MUKUNDA NANDANAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at MUKUNDA NANDANAM?
The professionals named in the filing: Architect: Bommu Veera Narendranath Reddy; Engineer: INTURI VEERAIAH; Chartered Accountant: Ramesh Babu Lankipalli. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MUKUNDA NANDANAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback