Home / Browse projects / Bengaluru Urban, Karnataka / MUKUNDA GOKULAM
MUKUNDA GOKULAM
RG-KA-92615 · RERA PRM/KA/RERA/1251/446/PR/040524/006855 · Last updated on RERA Karnataka portal: 3 May 2024
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
MUKUNDA GOKULAM is a Residential/Group Housing project by MUKUNDA BUILDERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/040524/006855 on 4 May 2024. Possession is promised by 31 Dec 2027.
At a glance
Project
- NameMUKUNDA GOKULAM
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560067
- Pincode560067
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/040524/006855
- ReraGenie IDRG-KA-92615
Builder
- NameMUKUNDA BUILDERS
- Entity typePartnership Firm
- GSTIN29ABPFM0239H1Z0
- Authorized SignatoryB CHANDRA SEKHAR REDDY
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on4 May 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings5 building records
- Documents filed85 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block-A | - | - | - | 8 | 0 | 8 |
| Block-B | - | - | - | 36 | 0 | 36 |
| Block-C | - | - | - | 56 | 0 | 56 |
| Block-D | - | - | - | 48 | 0 | 48 |
| Block-E | - | - | - | 48 | 0 | 48 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 3 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities35
As on 3 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| corridor/Lobby | Yes | - |
| Common Entrance/Exit | Yes | - |
| Outer wall | Yes | - |
| Provision of Staff and Security | Yes | - |
| water consevation | Yes | - |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| JAYARAM | - | - |
| Satyavathi | - | - |
| B. Chandrasekhar Reddy | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 63.50 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Bommu Veera Narendranath Reddy |
| Engineer | INTURI VEERAIAH |
| Chartered Accountant | Ramesh Babu Lankipalli |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed85
As listed on the registration, under the names the promoter filed them with; the newest 80 of 85 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/040524/006855 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Financial statement for last 3 years with CA UDINFile: FY 2021-22.pdf | 3 May 2024 |
| Financial statement for last 3 years with CA UDINFile: FY 2022-23.pdf | 3 May 2024 |
| Financial statement for last 3 years with CA UDINFile: FY 2023-24.pdf | 3 May 2024 |
| Upload CA certificate in prescribed format Form-01File: Mukunda Builders Accounts Form 1 CA Certificate.pdf | 22 Apr 2024 |
| Sources of fund to complete the projectFile: BALANCE SHEET.pdf | 22 Apr 2024 |
| Financial statement for last 3 years with CA UDINFile: BALANCE SHEET.pdf | 22 Apr 2024 |
| bank affidavit in prescribed formatFile: Bank-Affidavit.pdf | 22 Apr 2024 |
| mention 100 % collection account detailsFile: Bank Certificate.pdf | 22 Apr 2024 |
| authenticated copy of EC obtained from sub register till date for sno 27/2, 27/5 & for For PID NumbeFile: 1 EC MUKUNDA BUILDERS 01-04-2004 to 27-02-2024.pdf | 22 Apr 2024 |
| title deed of the land owner for sno 27/2, 27/5File: 2Partion deed 27.pdf | 22 Apr 2024 |
| title deed of the land owner for sno 27/2, 27/5File: PARTITION DEED 1.pdf | 22 Apr 2024 |
| conversion order For PID Number BBMP Katha SI No.71, Old No.27File: COVERSION ORDER.pdf | 22 Apr 2024 |
| conversion order For PID Number BBMP Katha SI No.71, Old No.27File: BBMP KATHA katha Gramtana.pdf | 22 Apr 2024 |
| notarized non-litigation affidavit,File: 4 notarized non-litigation affidavit.pdf | 22 Apr 2024 |
| notarized form-B,File: 5 Form B.pdf | 22 Apr 2024 |
| notaized JDcum affidavitFile: 6 JD Affidavit.pdf | 22 Apr 2024 |
| advocate search report henceFile: 7 Mukunda Builders Advocate Search report.pdf | 22 Apr 2024 |
| ) Area details the project details page not matching with the Approved Plan (total area , covers areFile: UPLOAD.pdf | 22 Apr 2024 |
| FAR As per the sanction Plan is Not Matching with the details Entered.File: FAR.pdf | 22 Apr 2024 |
| Height of the building mentioned in the development details page is not matching with the sanction pFile: FAR.pdf | 22 Apr 2024 |
| Upload Single plot layout. 5) Upload Single plot layout OrderFile: SINGLE PLOT.pdf | 22 Apr 2024 |
| Upload certified Carpet area calculation.File: 6 TR HO 619 RERA CARPET AREAS_compressed.pdf | 22 Apr 2024 |
| 7) Upload CDP map showing the proposed site.File: 7 CDP.jpg | 22 Apr 2024 |
| Upload village map showing the proposed siteFile: KUMBENA AGRAHARA VILLAGE MAP.pdf | 22 Apr 2024 |
| Upload commencement certificate.File: MUKUNDA PLAN.pdf | 22 Apr 2024 |
| Upload building licenseFile: BUILDING LICENCE.pdf | 22 Apr 2024 |
| Built up area / Number of units in the KSPCB NOC is not matching with the sanction Plan.File: KSPCB.pdf | 22 Apr 2024 |
| Built up area / Number of units in the SEIAA NOC is not matching with the sanction Plan.File: SEIAA.pdf | 22 Apr 2024 |
| Upload all sanctioned drawings Floor plans, sectional drawings and elevations.File: PLAN 1.pdf | 22 Apr 2024 |
| Upload all sanctioned drawings Floor plans, sectional drawings and elevations.File: PLAN 2.pdf | 22 Apr 2024 |
| Upload all sanctioned drawings Floor plans, sectional drawings and elevations.File: PLAN 3.pdf | 22 Apr 2024 |
| Upload all sanctioned drawings Floor plans, sectional drawings and elevations.File: PLAN 4.pdf | 22 Apr 2024 |
| Upload all sanctioned drawings Floor plans, sectional drawings and elevations.File: PLAN 5.pdf | 22 Apr 2024 |
| KALUDARI portion is passing in proposed site upload relevant documents/clarifyFile: Pathabadalavane Order and Sketch.pdf | 22 Apr 2024 |
| KALUDARI portion is passing in proposed site upload relevant documents/clarifyFile: KALUDARI SHIFTING.pdf | 22 Apr 2024 |
| upload ZR copy for nala buffer.File: NALA CLARIFICATION.pdf | 22 Apr 2024 |
| ) Please update the Construction Cost Details properly on the cost details properly.File: UPLOAD.pdf | 22 Apr 2024 |
| Please update the Amenities and Common area details properly on the project detail page and upload tFile: UPLOAD.pdf | 22 Apr 2024 |
| Please update the Project Engineer details along with the self-attested copy of the Engineer licenseFile: 3 Engineer BBMP - Certificate.pdf | 22 Apr 2024 |
| Please upload the brief estimated cost of construction certified by the registered Civil EngineerFile: UPLOAD.pdf | 22 Apr 2024 |
| Updated area details are incorrect, please update the area details properly on the project detail paFile: UPLOAD.pdf | 22 Apr 2024 |
| Please mention the project name and project address and upload the project section 3(1) notarized afFile: Affidavit Sec-3.pdf | 22 Apr 2024 |
| Please upload the proforma of the Allotment letter and proforma of agreement for sale.File: Allotment letter.pdf | 22 Apr 2024 |
| Please upload the proforma of the Allotment letter and proforma of agreement for sale.File: 8 Proforma of agreement for sale.pdf | 22 Apr 2024 |
| Please upload the STP design drawing certified by the Engineer as per the guidelines of KSPCB NOC.File: 9 STP Drawing.pdf | 22 Apr 2024 |
| Please upload the Land cost calculation sheet as per the guidance value(Self-attested copy).File: 10 Guidance Value Builders.pdf | 22 Apr 2024 |
| ) Please clarify the source of water supply to the project along with the supporting documents and pFile: 11 BWSSB NOC BUILDERS.pdf | 22 Apr 2024 |
| Upload Single plot layout OrderFile: SINGLE PLOT.pdf | 22 Apr 2024 |
| FORM 2File: 4 Form -2, Architect.pdf | 22 Apr 2024 |
| FORM 3File: 4 Form-3 Engineer FINAL.pdf | 22 Apr 2024 |
| RTC, survey Sy No.27/2 | - |
| Mutation, survey Sy No.27/2 | - |
| Encumbrance Certificate, survey Sy No.27/2 | - |
| Conversion/Alienation Order, survey Sy No.27/2 | - |
| JDA, survey Sy No.27/2 | - |
| Khatha, survey Sy No.27/2 | - |
| RTC, survey Sy No.27/5 | - |
| Mutation, survey Sy No.27/5 | - |
| Encumbrance Certificate, survey Sy No.27/5 | - |
| Sale/Title/Gift Deed, survey Sy No.27/5 | - |
| Khatha, survey Sy No.27/5 | - |
| Registration CertificateFile: Form-C.pdf | - |
| Partnership DeedFile: Reconstitution Deed BUILDERS.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Mukunda Builders Accounts Form 1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: 4 Form-3 Engineer FINAL.pdf | - |
| Certificate issued by Engineer Form 3File: 4 Form -2, Architect.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| Certificate from Chartered AccountFile: Mukunda Builders Accounts Form 1 CA Certificate.pdf | - |
| BESCOM NOC BUILDERS | - |
| BWSSB NOC BUILDERS | - |
| Builders Plan Copy New Plan_compressed | - |
| Specification | - |
| JDA 27-2_JDA 27-5_merged | - |
| Convertion_merged | - |
| BESCOM NOC BUILDERS | - |
| BWSSB NOC BUILDERS | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep MUKUNDA GOKULAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 41 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
DS MAX SKY FIELDS
DS Max Properties Private Limited
Sowparnika Rhythm of Rain
SOWPARNIKA HOMES PRIVATE LIMITED
WORLD OF GARDENS
RLP TRENDSQUARES PROJECTS PRIVATE LIMITED
DS MAX SKYSAMPURN
DS MAX PROPERTIES PRIVATE LIMITED
Amrutha Lake Vista
Amrutha Shelters Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: MUKUNDA BUILDERS
MUKUNDA BUILDERS has 1 registration on RERA Karnataka, including MUKUNDA GOKULAM. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if MUKUNDA GOKULAM is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of MUKUNDA GOKULAM?
The registered promoter entity is MUKUNDA BUILDERS, a partnership firm as per the filing. Its GSTIN 29ABPFM0239H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in MUKUNDA GOKULAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at MUKUNDA GOKULAM?
The professionals named in the filing: Architect: Bommu Veera Narendranath Reddy; Engineer: INTURI VEERAIAH; Chartered Accountant: Ramesh Babu Lankipalli. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MUKUNDA GOKULAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback