MUKUNDA GOKULAM

By MUKUNDA BUILDERS

RG-KA-92615 · RERA PRM/KA/RERA/1251/446/PR/040524/006855 · Last updated on RERA Karnataka portal: 3 May 2024

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2027Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 85 documents Report an error

MUKUNDA GOKULAM is a Residential/Group Housing project by MUKUNDA BUILDERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/040524/006855 on 4 May 2024. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameMUKUNDA GOKULAM
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560067
  • Pincode560067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/040524/006855
  • ReraGenie IDRG-KA-92615

Builder

  • NameMUKUNDA BUILDERS
  • Entity typePartnership Firm
  • GSTIN29ABPFM0239H1Z0
  • Authorized SignatoryB CHANDRA SEKHAR REDDY

Key dates

this monthRegisteredMay 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on4 May 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings5 building records
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block-A---808
Block-B---36036
Block-C---56056
Block-D---48048
Block-E---48048

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 3 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities35

As on 3 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
corridor/LobbyYes-
Common Entrance/ExitYes-
Outer wallYes-
Provision of Staff and SecurityYes-
water consevationYes-

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,037 sq m
Named landowners3
LandownerVillageDistrict
JAYARAM--
Satyavathi--
B. Chandrasekhar Reddy--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 63.50 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 63.50 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBommu Veera Narendranath Reddy
EngineerINTURI VEERAIAH
Chartered AccountantRamesh Babu Lankipalli

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed85

As listed on the registration, under the names the promoter filed them with; the newest 80 of 85 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/040524/006855 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Financial statement for last 3 years with CA UDINFile: FY 2021-22.pdf3 May 2024
Financial statement for last 3 years with CA UDINFile: FY 2022-23.pdf3 May 2024
Financial statement for last 3 years with CA UDINFile: FY 2023-24.pdf3 May 2024
Upload CA certificate in prescribed format Form-01File: Mukunda Builders Accounts Form 1 CA Certificate.pdf22 Apr 2024
Sources of fund to complete the projectFile: BALANCE SHEET.pdf22 Apr 2024
Financial statement for last 3 years with CA UDINFile: BALANCE SHEET.pdf22 Apr 2024
bank affidavit in prescribed formatFile: Bank-Affidavit.pdf22 Apr 2024
mention 100 % collection account detailsFile: Bank Certificate.pdf22 Apr 2024
authenticated copy of EC obtained from sub register till date for sno 27/2, 27/5 & for For PID NumbeFile: 1 EC MUKUNDA BUILDERS 01-04-2004 to 27-02-2024.pdf22 Apr 2024
title deed of the land owner for sno 27/2, 27/5File: 2Partion deed 27.pdf22 Apr 2024
title deed of the land owner for sno 27/2, 27/5File: PARTITION DEED 1.pdf22 Apr 2024
conversion order For PID Number BBMP Katha SI No.71, Old No.27File: COVERSION ORDER.pdf22 Apr 2024
conversion order For PID Number BBMP Katha SI No.71, Old No.27File: BBMP KATHA katha Gramtana.pdf22 Apr 2024
notarized non-litigation affidavit,File: 4 notarized non-litigation affidavit.pdf22 Apr 2024
notarized form-B,File: 5 Form B.pdf22 Apr 2024
notaized JDcum affidavitFile: 6 JD Affidavit.pdf22 Apr 2024
advocate search report henceFile: 7 Mukunda Builders Advocate Search report.pdf22 Apr 2024
) Area details the project details page not matching with the Approved Plan (total area , covers areFile: UPLOAD.pdf22 Apr 2024
FAR As per the sanction Plan is Not Matching with the details Entered.File: FAR.pdf22 Apr 2024
Height of the building mentioned in the development details page is not matching with the sanction pFile: FAR.pdf22 Apr 2024
Upload Single plot layout. 5) Upload Single plot layout OrderFile: SINGLE PLOT.pdf22 Apr 2024
Upload certified Carpet area calculation.File: 6 TR HO 619 RERA CARPET AREAS_compressed.pdf22 Apr 2024
7) Upload CDP map showing the proposed site.File: 7 CDP.jpg22 Apr 2024
Upload village map showing the proposed siteFile: KUMBENA AGRAHARA VILLAGE MAP.pdf22 Apr 2024
Upload commencement certificate.File: MUKUNDA PLAN.pdf22 Apr 2024
Upload building licenseFile: BUILDING LICENCE.pdf22 Apr 2024
Built up area / Number of units in the KSPCB NOC is not matching with the sanction Plan.File: KSPCB.pdf22 Apr 2024
Built up area / Number of units in the SEIAA NOC is not matching with the sanction Plan.File: SEIAA.pdf22 Apr 2024
Upload all sanctioned drawings Floor plans, sectional drawings and elevations.File: PLAN 1.pdf22 Apr 2024
Upload all sanctioned drawings Floor plans, sectional drawings and elevations.File: PLAN 2.pdf22 Apr 2024
Upload all sanctioned drawings Floor plans, sectional drawings and elevations.File: PLAN 3.pdf22 Apr 2024
Upload all sanctioned drawings Floor plans, sectional drawings and elevations.File: PLAN 4.pdf22 Apr 2024
Upload all sanctioned drawings Floor plans, sectional drawings and elevations.File: PLAN 5.pdf22 Apr 2024
KALUDARI portion is passing in proposed site upload relevant documents/clarifyFile: Pathabadalavane Order and Sketch.pdf22 Apr 2024
KALUDARI portion is passing in proposed site upload relevant documents/clarifyFile: KALUDARI SHIFTING.pdf22 Apr 2024
upload ZR copy for nala buffer.File: NALA CLARIFICATION.pdf22 Apr 2024
) Please update the Construction Cost Details properly on the cost details properly.File: UPLOAD.pdf22 Apr 2024
Please update the Amenities and Common area details properly on the project detail page and upload tFile: UPLOAD.pdf22 Apr 2024
Please update the Project Engineer details along with the self-attested copy of the Engineer licenseFile: 3 Engineer BBMP - Certificate.pdf22 Apr 2024
Please upload the brief estimated cost of construction certified by the registered Civil EngineerFile: UPLOAD.pdf22 Apr 2024
Updated area details are incorrect, please update the area details properly on the project detail paFile: UPLOAD.pdf22 Apr 2024
Please mention the project name and project address and upload the project section 3(1) notarized afFile: Affidavit Sec-3.pdf22 Apr 2024
Please upload the proforma of the Allotment letter and proforma of agreement for sale.File: Allotment letter.pdf22 Apr 2024
Please upload the proforma of the Allotment letter and proforma of agreement for sale.File: 8 Proforma of agreement for sale.pdf22 Apr 2024
Please upload the STP design drawing certified by the Engineer as per the guidelines of KSPCB NOC.File: 9 STP Drawing.pdf22 Apr 2024
Please upload the Land cost calculation sheet as per the guidance value(Self-attested copy).File: 10 Guidance Value Builders.pdf22 Apr 2024
) Please clarify the source of water supply to the project along with the supporting documents and pFile: 11 BWSSB NOC BUILDERS.pdf22 Apr 2024
Upload Single plot layout OrderFile: SINGLE PLOT.pdf22 Apr 2024
FORM 2File: 4 Form -2, Architect.pdf22 Apr 2024
FORM 3File: 4 Form-3 Engineer FINAL.pdf22 Apr 2024
RTC, survey Sy No.27/2-
Mutation, survey Sy No.27/2-
Encumbrance Certificate, survey Sy No.27/2-
Conversion/Alienation Order, survey Sy No.27/2-
JDA, survey Sy No.27/2-
Khatha, survey Sy No.27/2-
RTC, survey Sy No.27/5-
Mutation, survey Sy No.27/5-
Encumbrance Certificate, survey Sy No.27/5-
Sale/Title/Gift Deed, survey Sy No.27/5-
Khatha, survey Sy No.27/5-
Registration CertificateFile: Form-C.pdf-
Partnership DeedFile: Reconstitution Deed BUILDERS.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Mukunda Builders Accounts Form 1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: 4 Form-3 Engineer FINAL.pdf-
Certificate issued by Engineer Form 3File: 4 Form -2, Architect.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
Certificate from Chartered AccountFile: Mukunda Builders Accounts Form 1 CA Certificate.pdf-
BESCOM NOC BUILDERS-
BWSSB NOC BUILDERS-
Builders Plan Copy New Plan_compressed-
Specification-
JDA 27-2_JDA 27-5_merged-
Convertion_merged-
BESCOM NOC BUILDERS-
BWSSB NOC BUILDERS-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep MUKUNDA GOKULAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmMUKUNDA GOKULAMOther 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: MUKUNDA BUILDERS

MUKUNDA BUILDERS has 1 registration on RERA Karnataka, including MUKUNDA GOKULAM. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if MUKUNDA GOKULAM is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MUKUNDA GOKULAM?

The registered promoter entity is MUKUNDA BUILDERS, a partnership firm as per the filing. Its GSTIN 29ABPFM0239H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MUKUNDA GOKULAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MUKUNDA GOKULAM?

The professionals named in the filing: Architect: Bommu Veera Narendranath Reddy; Engineer: INTURI VEERAIAH; Chartered Accountant: Ramesh Babu Lankipalli. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MUKUNDA GOKULAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MUKUNDA GOKULAM. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MUKUNDA GOKULAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.