Home / Browse projects / Bengaluru Rural, Karnataka / MIMS NORTHDALE

Registration approved No litigation declared Residential/Group Housing project

MIMS NORTHDALE

By MIMS BUILDERS PV LTD

RG-KA-28295 · RERA PRM/KA/RERA/1250/304/PR/170322/004768 · Last updated on RERA Karnataka portal: 25 Feb 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Oct 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 85 documents Report an error

MIMS NORTHDALE is a Residential/Group Housing project by MIMS BUILDERS PV LTD in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/170322/004768 on 17 Mar 2022. Possession is promised by 31 Oct 2024.

At a glance

Project

  • NameMIMS NORTHDALE
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
    • 560077
  • Pincode560077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/170322/004768
  • ReraGenie IDRG-KA-28295

Builder

  • NameMIMS BUILDERS PV LTD
  • Entity typeCompany
  • CINU70101KA2006PTC038887
  • GSTIN29AAECM6198E1Z3
  • Authorized SignatoryZakiulla Shariff
  • Managing DirectorZakiulla Shariff
  • DirectorsSyed Ayub Pasha, HA Abdul Sajid, Mujaid Z Mohamed, Zakiulla Shariff
  • Project HeadZakiulla Shariff
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2022PromisedOct 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Mar 2022
  • Promised completion31 Oct 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block A---12012
Block B---16016

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 25 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 25 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,049 sq m
Named landowners1
LandownerVillageDistrict
Col S K Murthy--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 34.26 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 25.00 cr-
On-site expenditure-Salaries of workersRs 2.50 cr-
Payment of taxesRs 2.45 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 1.51 cr-
Total Approval CostRs 99.01 lakh-
On-site expenditure-Site OverheadRs 78.00 lakh-
On-site expenditure-Consultants FeesRs 75.00 lakh-
Payment of cessRs 13.00 lakh-
Payment of feesRs 5.00 lakh-
Payment of chargesRs 5.00 lakh-
Payment of PremiumsRs 5.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAslam Architects &Interior Designers Pvt Ltd
EngineerRS Consultants
Chartered AccountantHaris Parmar & Associates

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed85

As listed on the registration, under the names the promoter filed them with; the newest 80 of 85 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/170322/004768 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
AOS DRAFTFile: AOS DRAFT.pdf25 Feb 2022
Reply letter with details of Cost of the ProjectFile: Reply to Letter_17-2-2022.pdf17 Feb 2022
Cost of Project DetailsFile: ReraCertificate - Form -1.pdf10 Jan 2022
CA Certificate for Estimated cost of Construction(includes the approval cost)File: ReraCertificate - Form -1.pdf3 Jan 2022
Cost Details of Land & ConstructionFile: ReraCertificate - Form -1.pdf21 Dec 2021
BWSSB NOCFile: BWSSB NOC Northdale.PDF21 Dec 2021
Mention CA UDIN for 2018-19 financialFile: UDIN for 2018-19 .pdf11 Dec 2021
2020-21-Audited profit and loss account and balance sheetFile: Extension request for Audited profit and loss account and balance sheet for 2020-21.pdf11 Dec 2021
Bank account name should be as per bank account direction circular , Upload bank account statementFile: MIMS Rera Acc.pdf11 Dec 2021
Need title deed in the name of S K Krishna murthyFile: Sale Deed Col Murthy.PDF11 Dec 2021
Need notarized Joint Affidavit cum declaration between land owner and promoterFile: Need notarized Joint Affidavit cum declaration between land owner and promoter.PDF11 Dec 2021
Need notarized form-B in RERA prescribed formatFile: Northdale Form-B.PDF11 Dec 2021
certified copy obtained by the concerned Sub-registrar regarding value of the property on the basFile: Northdale Guideline Valure.PDF11 Dec 2021
Need Non- litigation affidavit with respect the property regarding court cases Judicial tribunal aFile: Non- litigation affidavit with respects.PDF11 Dec 2021
Building License Plan sanction letterFile: Northdale Building License.PDF11 Dec 2021
NOC issued by KSPCBFile: Northdale NOC KSPCB.pdf11 Dec 2021
Ground floor approved drawingsFile: Northdale Basement Floor & Ground Floor Plan.pdf11 Dec 2021
second floor approved drawingsFile: Northdale Second Floor Plan And Elevation.pdf11 Dec 2021
Cost of Land + Estimated Cost of Construction is equals to Total Project costFile: Charted AccountantForm 1.pdf11 Dec 2021
BWSSB NOCFile: BWSSB NOC Application.pdf11 Dec 2021
Section 3(1) Notarized AffidavitFile: Section 3(1) Notarized Affidavi.PDF11 Dec 2021
STP in the project is to be clarified by the promoter along with drawings and documentsFile: Northdale STP Report.PDF11 Dec 2021
RTC, survey 56/2 CMC No.250, KTR-154/20-21-
Mutation, survey 56/2 CMC No.250, KTR-154/20-21-
Encumbrance Certificate, survey 56/2 CMC No.250, KTR-154/20-21-
Conversion/Alienation Order, survey 56/2 CMC No.250, KTR-154/20-21-
JDA, survey 56/2 CMC No.250, KTR-154/20-21-
Khatha, survey 56/2 CMC No.250, KTR-154/20-21-
Registration CertificateFile: COI-MIMS Builders.jpg-
Organization StructureFile: MIMS BUILDER PVT LTD Organization .pdf-
Certificate issued by CA Form 1File: ReraCertificate - Form -1.pdf-
Certificate issued by Architect Form 2File: Rera.pdf-
Certificate issued by Engineer Form 3File: Engineer Certificate PR.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non- litigation affidavit with respects.PDF-
Certificate from Chartered AccountFile: Charted AccountantForm 1.pdf-
Balance Sheet 2020 - 2021File: MIMS Balance Sheet 2019-20.pdf-
Balance Sheet 2019 - 2020File: MIMS Balance Sheet 2018-19.pdf-
Balance Sheet 2018 - 2019File: MIMS Balance Sheet 2017-18.pdf-
Audited Profit and Loss Statement 2020 - 2021File: MIMS P&L 2019-20.pdf-
Audited Profit and Loss Statement 2019 - 2020File: MIMS P&L 2018-19.pdf-
Audited Profit and Loss Statement 2018 - 2019File: MIMS P&L 2017-18.pdf-
Director's Report 2020 - 2021File: MIMS Director Report_compressed-1-6.pdf-
Director's Report 2019 - 2020File: MIMS Director Report_compressed-7-12.pdf-
Director's Report 2018 - 2019File: MIMS Director Report_compressed-13-17.pdf-
Cash Flow Statement 2020 - 2021File: MIMS Cash Flow Statement 2017-20.pdf-
Cash Flow Statement 2019 - 2020File: MIMS Cash Flow Statement 2018-19.pdf-
Auditor's Report 2020 - 2021File: Auditors Report-2019-20.pdf-
Auditor's Report 2019 - 2020File: Auditors Report-2018-19.pdf-
Auditor's Report 2018 - 2019File: Auditors Report-2017-18.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: MIMS IT 2019-20.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: MIMS IT 2018-19.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: MIMS IT 2017-18.pdf-
Northdale Site Plan-
Northdale First Floor Plan and Section-
Structureal Engineer certificate-
Leagal Optiion -Northdale-
JD NORTHDALE-
Change of land use-
Conversion certificate Northdale-
Agreement of sale MIMS NorthDALE-
Sale Deed MIMS Colonel Sab-
Form B RERA-
BESCOM NOC-
BWSSB NOC-
CFE-1-1-2-1-
Unnamed document-
Unnamed document-
Unnamed document-
Prospectus/BrochureFile: Rera letter for brochure.pdf-
Advertisement Copy 1File: Rera letter for brochure.pdf-
Stability CertificateFile: Stability Certificate ND.pdf-
Occupancy CertificateFile: Northdale OC copy.pdf-
Consent for operation issued by KSPCBFile: operation issued by KSPCB CFO.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Lift IOperation certificate ND.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM Sanction Letter Northdale.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB NOC NORTHDALE.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: Details of external infrastructure work.jpeg-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
MIMS ResidencySurvey No. 36/1, 48/2, Thanisandra Main Road Agrahara Sampigehalli, YelahankaCompleted-No date filed
MIMS NORTH BROOKMIMS North Brook, Sy.no.109/1A1 doddgubbi Road, Hennur Main RoadCompleted-No date filed

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep MIMS NORTHDALE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmMIMS NORTHDALEOther 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 17 registered projects within 2 km.

Builder: MIMS BUILDERS PV LTD

MIMS BUILDERS PV LTD has 1 registration on RERA Karnataka, including MIMS NORTHDALE. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if MIMS NORTHDALE is delayed beyond 31 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MIMS NORTHDALE?

The registered promoter entity is MIMS BUILDERS PV LTD, a company as per the filing. Its CIN U70101KA2006PTC038887 and GSTIN 29AAECM6198E1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MIMS NORTHDALE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MIMS NORTHDALE?

The professionals named in the filing: Architect: Aslam Architects &Interior Designers Pvt Ltd; Engineer: RS Consultants; Chartered Accountant: Haris Parmar & Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MIMS NORTHDALE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MIMS NORTHDALE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MIMS NORTHDALE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.