Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No complaints on record
- Separate project account declared
Saved.
Midmac Orchid is a Residential/Group Housing project by Midmac Infrastructure Pvt Ltd in Uttara Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1274/351/PR/171026/000360 on 26 Oct 2017. Possession is promised by 30 Jul 2019. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameMidmac Orchid
- TypeResidential/Group Housing
- Location
- Karwar
- Uttara Kannada
- PincodeNot stated
- RERA no.PRM/KA/RERA/1274/351/PR/171026/000360
- ReraGenie IDRG-KA-44377
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on26 Oct 2017
- Promised completion30 Jul 2019
- Revised completionRevised to 30 Jul 2019 (originally 30 Jul 2018)
- Buildings2 building records
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MIDMAC ORCHID | - | - | - | 21 | 0 | 21 |
| MIDMAC ORCHID 2 | - | - | - | 2 | 0 | 2 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | Not applicable |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | Not applicable |
Progress on shared amenities41
As on 13 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Water conservation | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building / common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KVVSV Prasad |
| Engineer | Satish Hiregoudar |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed70
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1274/351/PR/171026/000360 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect CertificateFile: Orchid Architect Certificate.pdf | 13 Apr 2022 |
| Consent NOC Letters 2/3rd CustomersFile: Orchid-2-3rd Consent or NOC letter_compressed.pdf | 13 Apr 2022 |
| Quarterly Update Payment ReceiptFile: Orchid QTLY Payment Receipt.pdf | 13 Apr 2022 |
| Revised Permission Plan ApprovedFile: Revised Permission Plan Approved.pdf | 13 Apr 2022 |
| Orchid Approved Plan NewFile: Orchid Approved Plan New.pdf | 13 Apr 2022 |
| Orchid Occupancy CertificateFile: Midmac Orchid-3rd Floor Approval Acknowledgement.pdf | 13 Apr 2022 |
| Midmac Orchid-3rd Floor Approval AcknowledgementFile: Midmac Orchid-3rd Floor Approval Acknowledgement.pdf | 13 Apr 2022 |
| Orchid Revised Building PermissionFile: Orchid Revised Building Permission.pdf | 13 Apr 2022 |
| Revised Drawing with 3rd FloorFile: DWG Layout Inward For CC.pdf | 12 Jan 2022 |
| Application for AlterationFile: Documents Inwards For CC Acknowledgement.pdf | 12 Jan 2022 |
| Updated PlanFile: Updated Plan-Midmac Orchid-3rd Floor Approval.pdf | 12 Jan 2022 |
| orchid Extension Sold & UnsoldFile: Orchid Extension Sold & Unsold.pdf | 18 Oct 2021 |
| Orchid Renewed building drawingsFile: Orchid Renewd sanctioned building drawings.pdf | 18 Oct 2021 |
| Form Ex-7File: form Ex-7.pdf | 18 Oct 2021 |
| ocFile: oc.pdf | 18 Oct 2021 |
| Form B Affidavit orchid 21-8-2021File: Form B Affidavit Orchid 21-8-2021.pdf | 18 Oct 2021 |
| orchid certificate structural safetyFile: Orchid Certificate of Structural Safety.pdf | 18 Oct 2021 |
| Form B affidavit OrchidFile: Form B Affidavit Orchid.pdf | 24 Aug 2021 |
| Renewed planFile: Renewed Plan.pdf | 24 Aug 2021 |
| plan Renewed letterFile: Plan Renewed Letter.pdf | 24 Aug 2021 |
| Form Ex-7File: form Ex-7.pdf | 24 Aug 2021 |
| CertificateFile: MIPL Certificate (1).pdf | - |
| Architect Certificate for Work Completion Schedule till DateFile: ARCHITECT CERTIFICATE WORK COMPLETED.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Engineer`s Certificate Work Completion.pdf | - |
| CA Certificate for Funds UtilizationFile: CA Fund utilisation certificate-ORCHID.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: ARCHITECT CERTIFICATE WORK PENDING.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Engineer`s Certificate Work Pending.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: CA Cert for fund required-ORCHID.pdf | - |
| AffidavitFile: Orchid Form B Affidavit.pdf | - |
| Latest Encumbrance CertificateFile: EC For 35 Years.JPG | - |
| Consent letter from 2/3rd of AllotteesFile: Orchid-2-3rd Consent or NOC letter_compressed.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: Orchid-SoldUnsoldDetails.xlsx | - |
| Document 1File: Final CC Orchid.jpeg | - |
| Commencement Certificate | - |
| Approved Building- Plotting Plan | - |
| Approved Layout Plan | - |
| Proforma For Sale Deed | - |
| Proforma For Sale Of Agreement | - |
| Land Documents and Location | - |
| Approved Section Of Building- Infrastructure Plan Of Plotting | - |
| Area Development Plan Of Project Area | - |
| Proforma Of Allotment Letter | - |
| Brochure Of Current Project | - |
| All NOCs From Authority | - |
| Project Specification | - |
| Encumbrance Certificate | - |
| Conversion Order | - |
| Balance Sheet 2015 - 2016File: Balance Sheet.pdf | - |
| Balance Sheet 2014 - 2015File: Balance Sheet.pdf | - |
| Balance Sheet 2013 - 2014File: Balance Sheet.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: P and L Account.pdf | - |
| Audited Profit and Loss Statement 2014 - 2015File: P and L Account.pdf | - |
| Audited Profit and Loss Statement 2013 - 2014File: P and L Account.pdf | - |
| Director's Report 2015 - 2016File: Directors Report.pdf | - |
| Director's Report 2014 - 2015File: Directors Report.PDF | - |
| Director's Report 2013 - 2014File: Directors Report.PDF | - |
| Cash Flow Statement 2015 - 2016File: Cash Flow Statement.pdf | - |
| Cash Flow Statement 2014 - 2015File: CFS Declaration.PDF | - |
| Auditor's Report 2015 - 2016File: Auditor Report.pdf | - |
| Auditor's Report 2014 - 2015File: Audit Report Final.pdf | - |
| Auditor's Report 2013 - 2014File: Auditor Report.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: F Y 2015-16 ITR.pdf | - |
| Income Tax Return Acknowledgement 2014 - 2015File: FY 2014- 15 ITR.pdf | - |
| Income Tax Return Acknowledgement 2013 - 2014File: FY 2013-14 ITR.pdf | - |
| Declatation - Form B Affidavit | - |
| Prospectus/BrochureFile: orchid-brochure.pdf | - |
| Advertisement Copy 1File: orchid-brochure.pdf | - |
| Tower Excel SheetFile: PRM_KA_RERA_1274_351_PR_171026_000360 (2).xlsx | - |
| Occupancy CertificateFile: Building CC.pdf | - |
| Completion certificate issued by the competent authorityFile: Building CC.pdf | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| MIDMAC 'ESPANA' | - | Completed | Jul 2017 | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Uttara Kannada
Computed across the 100+ Uttara Kannada projects on ReraGenie, from their own filings.
Keep Midmac Orchid on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Uttara Kannada100+ in Uttara Kannada
Signature Apartment
VASANT CONSTRUCTIONS PRIVATE LIMITED
Nisarga Vastu City
MUNAF MOHAMMED SAB LANDAKANALLI
AL MARJAAN RESIDENCY
BRIGHT DEVELOPERS
Parijaat
Padmanabh Realtors
ASIYA BUSINESS PARK
ASIYA DEVELOPERS
ABHIMAN RESIDENCY AND COMMERCIAL COMPLEX
KALLUR DEVELOPERS
See every Uttara Kannada project, with the district possession charts
Builder: Midmac Infrastructure Pvt Ltd
Midmac Infrastructure Pvt Ltd has 2 registrations on RERA Karnataka, including Midmac ' ELEGANT' and Midmac Orchid. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Uttara Kannada district page.
Frequently asked questions
What are my rights if Midmac Orchid is delayed beyond 30 Jul 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Midmac Orchid?
The registered promoter entity is Midmac Infrastructure Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Midmac Orchid?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Midmac Orchid?
The professionals named in the filing: Architect: KVVSV Prasad; Engineer: Satish Hiregoudar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Midmac Orchid?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback