Registration approved Residential/Group Housing project

Midmac Orchid

By Midmac Infrastructure Pvt Ltd

RG-KA-44377 · RERA PRM/KA/RERA/1274/351/PR/171026/000360 · Last updated on RERA Karnataka portal: 13 Apr 2022

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Jul 2019Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 70 documents Report an error

Midmac Orchid is a Residential/Group Housing project by Midmac Infrastructure Pvt Ltd in Uttara Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1274/351/PR/171026/000360 on 26 Oct 2017. Possession is promised by 30 Jul 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameMidmac Orchid
  • TypeResidential/Group Housing
  • Location
    • Karwar
    • Uttara Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1274/351/PR/171026/000360
  • ReraGenie IDRG-KA-44377

Builder

  • NameMidmac Infrastructure Pvt Ltd
  • Entity typeCompany
  • Authorized SignatoryHAROON SHAIKH
  • OthersHAROON.SHAIKH, Fatima Shaikh, Abdul Shukar Shaikh, Ayeeshabi Shaikh, Abdul Sattar Shaikh, Hasina Fairoze Shaikh
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2017First promiseJul 2018Revised toJul 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on26 Oct 2017
  • Promised completion30 Jul 2019
  • Revised completionRevised to 30 Jul 2019 (originally 30 Jul 2018)
  • Buildings2 building records
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MIDMAC ORCHID---21021
MIDMAC ORCHID 2---202

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on 13 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,004 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.20 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKVVSV Prasad
EngineerSatish Hiregoudar

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1274/351/PR/220711/000360Jul 2018 → Jul 2019

Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed70

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1274/351/PR/171026/000360 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect CertificateFile: Orchid Architect Certificate.pdf13 Apr 2022
Consent NOC Letters 2/3rd CustomersFile: Orchid-2-3rd Consent or NOC letter_compressed.pdf13 Apr 2022
Quarterly Update Payment ReceiptFile: Orchid QTLY Payment Receipt.pdf13 Apr 2022
Revised Permission Plan ApprovedFile: Revised Permission Plan Approved.pdf13 Apr 2022
Orchid Approved Plan NewFile: Orchid Approved Plan New.pdf13 Apr 2022
Orchid Occupancy CertificateFile: Midmac Orchid-3rd Floor Approval Acknowledgement.pdf13 Apr 2022
Midmac Orchid-3rd Floor Approval AcknowledgementFile: Midmac Orchid-3rd Floor Approval Acknowledgement.pdf13 Apr 2022
Orchid Revised Building PermissionFile: Orchid Revised Building Permission.pdf13 Apr 2022
Revised Drawing with 3rd FloorFile: DWG Layout Inward For CC.pdf12 Jan 2022
Application for AlterationFile: Documents Inwards For CC Acknowledgement.pdf12 Jan 2022
Updated PlanFile: Updated Plan-Midmac Orchid-3rd Floor Approval.pdf12 Jan 2022
orchid Extension Sold & UnsoldFile: Orchid Extension Sold & Unsold.pdf18 Oct 2021
Orchid Renewed building drawingsFile: Orchid Renewd sanctioned building drawings.pdf18 Oct 2021
Form Ex-7File: form Ex-7.pdf18 Oct 2021
ocFile: oc.pdf18 Oct 2021
Form B Affidavit orchid 21-8-2021File: Form B Affidavit Orchid 21-8-2021.pdf18 Oct 2021
orchid certificate structural safetyFile: Orchid Certificate of Structural Safety.pdf18 Oct 2021
Form B affidavit OrchidFile: Form B Affidavit Orchid.pdf24 Aug 2021
Renewed planFile: Renewed Plan.pdf24 Aug 2021
plan Renewed letterFile: Plan Renewed Letter.pdf24 Aug 2021
Form Ex-7File: form Ex-7.pdf24 Aug 2021
CertificateFile: MIPL Certificate (1).pdf-
Architect Certificate for Work Completion Schedule till DateFile: ARCHITECT CERTIFICATE WORK COMPLETED.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer`s Certificate Work Completion.pdf-
CA Certificate for Funds UtilizationFile: CA Fund utilisation certificate-ORCHID.pdf-
Architect Certificate for Pending Work Completion Schedule.File: ARCHITECT CERTIFICATE WORK PENDING.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer`s Certificate Work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Cert for fund required-ORCHID.pdf-
AffidavitFile: Orchid Form B Affidavit.pdf-
Latest Encumbrance CertificateFile: EC For 35 Years.JPG-
Consent letter from 2/3rd of AllotteesFile: Orchid-2-3rd Consent or NOC letter_compressed.pdf-
Details Of Sold/ Un-sold UnitsFile: Orchid-SoldUnsoldDetails.xlsx-
Document 1File: Final CC Orchid.jpeg-
Commencement Certificate-
Approved Building- Plotting Plan-
Approved Layout Plan-
Proforma For Sale Deed-
Proforma For Sale Of Agreement-
Land Documents and Location-
Approved Section Of Building- Infrastructure Plan Of Plotting-
Area Development Plan Of Project Area-
Proforma Of Allotment Letter-
Brochure Of Current Project-
All NOCs From Authority-
Project Specification-
Encumbrance Certificate-
Conversion Order-
Balance Sheet 2015 - 2016File: Balance Sheet.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet.pdf-
Balance Sheet 2013 - 2014File: Balance Sheet.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P and L Account.pdf-
Audited Profit and Loss Statement 2014 - 2015File: P and L Account.pdf-
Audited Profit and Loss Statement 2013 - 2014File: P and L Account.pdf-
Director's Report 2015 - 2016File: Directors Report.pdf-
Director's Report 2014 - 2015File: Directors Report.PDF-
Director's Report 2013 - 2014File: Directors Report.PDF-
Cash Flow Statement 2015 - 2016File: Cash Flow Statement.pdf-
Cash Flow Statement 2014 - 2015File: CFS Declaration.PDF-
Auditor's Report 2015 - 2016File: Auditor Report.pdf-
Auditor's Report 2014 - 2015File: Audit Report Final.pdf-
Auditor's Report 2013 - 2014File: Auditor Report.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: F Y 2015-16 ITR.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: FY 2014- 15 ITR.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: FY 2013-14 ITR.pdf-
Declatation - Form B Affidavit-
Prospectus/BrochureFile: orchid-brochure.pdf-
Advertisement Copy 1File: orchid-brochure.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1274_351_PR_171026_000360 (2).xlsx-
Occupancy CertificateFile: Building CC.pdf-
Completion certificate issued by the competent authorityFile: Building CC.pdf-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
MIDMAC 'ESPANA'-CompletedJul 2017No date filed

How this compares with Uttara Kannada

22%of Uttara Kannada projects moved their completion datethis one moved by 12 months
0%of Uttara Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 100+ Uttara Kannada projects on ReraGenie, from their own filings.

Keep Midmac Orchid on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Uttara Kannada100+ in Uttara Kannada

Builder: Midmac Infrastructure Pvt Ltd

Midmac Infrastructure Pvt Ltd has 2 registrations on RERA Karnataka, including Midmac ' ELEGANT' and Midmac Orchid. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Uttara Kannada district page.

Frequently asked questions

What are my rights if Midmac Orchid is delayed beyond 30 Jul 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Midmac Orchid?

The registered promoter entity is Midmac Infrastructure Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Midmac Orchid?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Midmac Orchid?

The professionals named in the filing: Architect: KVVSV Prasad; Engineer: Satish Hiregoudar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Midmac Orchid?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Midmac Orchid. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Midmac Orchid to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.