Home / Browse projects / Vadodara, Gujarat / MANIWOOD RESIDENCY PHASE-1

Valid until 30 Apr 2029 Residential/Group Housing project

MANIWOOD RESIDENCY PHASE-1

By OM SAI DEVELOPERS

RG-GJ-70658 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA07942/A1R/220222 · Last updated on GujRERA portal: 8 Oct 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2029Possession promisedno revision filed
8 of 36Construction stages doneacross 4 buildings; furthest along: Excavation, 80%
239 of 317Units unsoldnot recorded sold or booked
Jump to the 38 documents Report an error

MANIWOOD RESIDENCY PHASE-1 is a Residential/Group Housing project by OM SAI DEVELOPERS in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA07942/A1R/220222 on 22 Jan 2021. Possession is promised by 30 Apr 2029. 78 of the 317 units on this registration are recorded sold or booked, and 8 of 36 construction stages are filed complete.

At a glance

Project

  • NameMANIWOOD RESIDENCY PHASE-1
  • TypeResidential/Group Housing
  • Location
    • MANIWOOD RESIDENCY
    • BESIDE ORIAN COMPLEX
    • OPP.NILESH PARK SOCIETY
    • UNDERA-KOYALI
    • ROAD
    • UNDERA
    • Vadodara
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA07942/A1R/220222
  • ReraGenie IDRG-GJ-70658

Builder

  • NameOM SAI DEVELOPERS
  • Entity typePARTNERSHIP FIRM
  • Other registrations2 more →

Key dates

this monthRegisteredJan 2021PromisedApr 2029

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2029
  • Registered on22 Jan 2021
  • Promised completion30 Apr 2029
  • Revised completionNone
  • Buildings4 building records
  • Documents filed38 files

Current status

25%78 of 317 units booked
23.5%Of the estimated cost spent so far

Figures as on 8 Oct 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block-A---1350135
Block-B---1750175
Block-C---606
Block-D---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 8 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 80%.

Block-A65%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor53%
Slabs of Super Structure58%
Internal walls, internal plaster, floorings, doors and windows within flats67%
Sanitary fittings within the flats53%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks67%
External plumbing and external plaster, elevation, completion of terraces with waterproofing35%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing53%
Block-B49%
ActivityProgress
Excavation80%
Podiums (if any)Not applicable
Plinth80%
Stilt Floor40%
Slabs of Super Structure43%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats40%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing20%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing40%
Block-C61%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor50%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing50%
Block-D22%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities23

As on 8 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes10%
Sewerage (chamber, lines, septic tank, STP)NoNot applicable
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable
Compound wallYes50%
Plinth protectionYes0%
Water tankYes0%
Other requirementsNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area60,400 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 84.56 cr
Cost incurredRs 19.87 cr
Spent of the estimate23.5%
BuildingWingEstimatedIncurred
Block-ANARs 42.02 crRs 8.16 cr
Block-BNARs 39.53 crRs 11.06 cr
Block-CNARs 2.70 crRs 55.00 lakh
Block-DNARs 30.00 lakhRs 10.00 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR.JATIN PATEL
EngineerZARANA ASSOCIATE

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA07942/A1R/220222 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)8 Oct 2024
Engineer's certificate annexure8 Oct 2024
RERA registration certificate22 Jan 2021
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

25%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep MANIWOOD RESIDENCY PHASE-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadodara2,900+ in Vadodara

2 kmMANIWOOD RESIDENCY PHASEOther 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: OM SAI DEVELOPERS

OM SAI DEVELOPERS has 3 registrations on GujRERA, including MANIWOOD RESIDENCY PHASE-1 and OM SAI APARTMENTS. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if MANIWOOD RESIDENCY PHASE-1 is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of MANIWOOD RESIDENCY PHASE-1?

The registered promoter entity is OM SAI DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in MANIWOOD RESIDENCY PHASE-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MANIWOOD RESIDENCY PHASE-1?

The professionals named in the filing: Architect: MR.JATIN PATEL; Engineer: ZARANA ASSOCIATE. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANIWOOD RESIDENCY PHASE-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANIWOOD RESIDENCY PHASE-1. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANIWOOD RESIDENCY PHASE-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.