Mahidhara Harmony
By MAHIDHARA PROJECTS PRIVATE LIMITED
RG-KA-57821 · RERA PRM/KA/RERA/1251/308/PR/211122/005487 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- 1 complaint at RERA Karnataka
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
Saved.
Mahidhara Harmony is a Residential/Group Housing project by MAHIDHARA PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/211122/005487 on 21 Nov 2022. Possession is promised by 10 Sep 2026. The completion date has moved by 12 months from the original filing. 91 of the 146 units on this registration are recorded sold or booked, and 15 of 16 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameMahidhara Harmony
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 560099
- Pincode560099
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/211122/005487
- ReraGenie IDRG-KA-57821
Builder
- NameMAHIDHARA PROJECTS PRIVATE LIMITED
- Entity typeCompany
- CINU45400TS2007PTC054590
- GSTIN29AAFCM1152K1ZD
- Authorized SignatoryP Mohan Kumar
- Chairman And Managing DirectorTADISINA PRASHANTH REDDY
- DirectorsT.PRASHANTHREDDY, T.SARITHA
- Project HeadA. Sudhakar Reddy
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on21 Nov 2022
- Promised completion10 Sep 2026
- Revised completionRevised to 10 Sep 2026 (originally 10 Sep 2025)
- Buildings8 building records
- Documents filed231 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING-1 | - | - | - | 18 | 0 | 18 |
| BUILDING- 2 | - | - | - | 18 | 0 | 18 |
| BUILDING-3 | - | - | - | 18 | 0 | 18 |
| BUILDING-4 | - | - | - | 16 | 0 | 16 |
| BUILDING-5 | - | - | - | 16 | 0 | 16 |
| BUILDING-6 | - | - | - | 16 | 0 | 16 |
| BUILDING 7 | - | - | - | 22 | 0 | 22 |
| BUILDING-8 | - | - | - | 22 | 0 | 22 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 16 construction stages are filed complete. The stage furthest along is Electrification, at 99%.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 99% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 98% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | Yes | 100% |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Electricity | Yes | 98% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 100% |
| Club House | Yes | 100% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 100% |
| Indoor Sports facility | Yes | 100% |
| Swimming Pool | Yes | 100% |
| Gym | Yes | 100% |
| Parks | Yes | 100% |
| Power Backup | Yes | 100% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 100% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership6
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| T. Bhadra Reddy | - | - |
| T. Bhadra Reddy | - | - |
| G. Radhamma | - | - |
| K. Srinivasa Reddy | - | - |
| A. Venkataswamy Reddy | - | - |
| K Nagaraj Reddy | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 44.98 cr | Rs 3.89 cr |
| On-site expenditure-Salaries of workers | Rs 9.25 cr | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 5.40 cr | - |
| On-site expenditure-Consultants Fees | Rs 4.25 cr | - |
| On-site expenditure-Site Overhead | Rs 2.67 cr | Rs 19.52 lakh |
| Payment of fees | Rs 1.58 cr | - |
| Payment of cess | Rs 45.00 lakh | - |
| Payment of taxes | - | Rs 1.60 lakh |
| Payment of charges | - | Rs 2.85 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | POORNAKRITI |
| Engineer | M/s. Adharshila Structures |
| Chartered Accountant | NSVR&ASSOCIATESLLP |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterothers
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00385/2026 | - | MAHIDHARA PROJECTS PRIVATE LIMITED | 15/04/2026 |
Documents filed231
As listed on the registration, under the names the promoter filed them with; the newest 80 of 231 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/211122/005487 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - CA certificate June 26.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect certificate June 26 Mahidhara Harmony.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Harmony.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Mar 26.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 March 26.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 March 26.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - CA Certificate Dec 25.pdf | 5 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect certificate Dec 25.pdf | 5 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU Dec 25.pdf | 5 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 5 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 5 Feb 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 5 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 5 Feb 2026 |
| Mahidhara Harmony Sold Unsold signedFile: 1 Mahidhara Harmony Sold Unsold signed.pdf | 29 Sep 2025 |
| NOC Renewal AffidavitFile: 2 NOC Renewal Affidavit.pdf | 29 Sep 2025 |
| Fund Requirement Certificate Mahidhara HarmonyFile: 3 Fund Requirement Certificate Mahidhara Harmony.pdf | 29 Sep 2025 |
| Fund Utilisation Mahidhara HarmonyFile: 3 Fund Utilisation Mahidhara Harmony.pdf | 29 Sep 2025 |
| Extension Notice Reply Mahidhara HarmonyFile: Extension Notice Reply Mahidhara Harmony.pdf | 29 Sep 2025 |
| Form 1 CA certificateFile: 1 Form 1 CA cert.pdf | 17 Nov 2022 |
| AOSFile: AOS.pdf | 14 Nov 2022 |
| Approval Villa PlansFile: Approval Villa Plans.pdf | 14 Nov 2022 |
| BESCOM NOC with Fee reciFile: BESCOM NOC with Fee reci.pdf | 14 Nov 2022 |
| Carpet Area CertificateFile: Carpet Area Certificate.pdf | 14 Nov 2022 |
| engineers certificateFile: engineers certificate.pdf | 14 Nov 2022 |
| family tree of avalappaFile: family tree of avalappa.pdf | 14 Nov 2022 |
| Guidance valueFile: Guidance value.pdf | 14 Nov 2022 |
| Hakku bidugade patra sy no 126 2File: Hakku bidugade patra sy no 126 2.pdf | 14 Nov 2022 |
| Plan Approval letterFile: Plan Approval letter.pdf | 14 Nov 2022 |
| Release deed for sy no 125 1 2File: Release deed for sy no 125 1 2.pdf | 14 Nov 2022 |
| No Litigation AffidavitFile: No Litigation Affidavit.pdf | 14 Nov 2022 |
| Release deed of 126 3 4File: Release deed of 126 3 4.pdf | 14 Nov 2022 |
| Release deed of 136 6File: Release deed of 136 6.pdf | 14 Nov 2022 |
| release deed of sy no 126 3 4File: release deed of sy no 126 3 4.pdf | 14 Nov 2022 |
| Release deed of sy no 126 3File: Release deed of sy no 126 3.pdf | 14 Nov 2022 |
| Relinquishment DeedFile: Relinquishment Deed.pdf | 14 Nov 2022 |
| Rera accountFile: Rera account.pdf | 14 Nov 2022 |
| Title deed for old sy nosFile: Title deed for old sy nos.pdf | 14 Nov 2022 |
| Title deed for Sy No 125 1File: Title deed for Sy No 125 1.pdf | 14 Nov 2022 |
| Title deed fro Sy No 125 2File: Title deed fro Sy No 125 2.pdf | 14 Nov 2022 |
| Water NOC DeclarationFile: Water NOC Declaration.pdf | 14 Nov 2022 |
| Form 1 CA certFile: 1 Form 1 CA cert.pdf | 14 Nov 2022 |
| company incorporation certificateFile: Company incorporation certificate.pdf | 15 Sep 2022 |
| ALLOTMENT LETTERFile: Allotment letter.pdf | 15 Sep 2022 |
| AUDIT REPORT 2020File: Audit report 2020.pdf | 15 Sep 2022 |
| ITR 2020-2021File: ITR 2020-21.pdf | 15 Sep 2022 |
| BALANCE SHEET 2020File: Balancesheet 2020.pdf | 15 Sep 2022 |
| CASHFLOW 2020File: cash flow statement 2020.pdf | 15 Sep 2022 |
| PROFIT AND LOSS 2020File: Profit and loss 2020.pdf | 15 Sep 2022 |
| AUDIT REPORT 2021File: Auditors report 2021.pdf | 15 Sep 2022 |
| BALANCESHEET 2021File: Balance sheet 2021.pdf | 15 Sep 2022 |
| CASHFLOW 2021File: cash flow statement 2021.pdf | 15 Sep 2022 |
| PROFIT AND LOSS 2021File: Profit and loss 2021.pdf | 15 Sep 2022 |
| ITR 2021-22File: ITR 2021-22.pdf | 15 Sep 2022 |
| JDA 125-1File: JDA 125 1.pdf | 15 Sep 2022 |
| JDA 125-2File: JDA 125 2.pdf | 15 Sep 2022 |
| JDA 126-3File: JDA 126 3 4.pdf | 15 Sep 2022 |
| JDA 126-3File: JDA 126 3.pdf | 15 Sep 2022 |
| JDA 131-6File: JDA 131 6.pdf | 15 Sep 2022 |
| AKARBAND125-1File: AKARBAND 125-1(1).pdf | 15 Sep 2022 |
| AKARBAND125-1File: AKARBAND 125-1.pdf | 15 Sep 2022 |
| AKARBAND131-6File: AKARBAND 131-6.pdf | 15 Sep 2022 |
| AKARBAND AND HISSAPODY 125File: AKARBAND AND HISSAPODY 125.pdf | 15 Sep 2022 |
| AKARBAND125-2File: AKARBAND125-2.pdf | 15 Sep 2022 |
| HISSAPODY 131File: HISSA PODY -SY NO 131.pdf | 15 Sep 2022 |
| AKARBAND AND HISSAPODY 126File: Sy No 126 hissapody & Akarband.pdf | 15 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Mahidhara Harmony on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 11 registered projects within 2 km.
Adarsh Welkin Park Phase 2
Akarshak Realty Private Limited
Adarsh Welkin Park Phase 1
Akarshak Realty Private Limited
Nambiar District 25 Phase 1
Nambiar EnsembleResidential Projects LLP
CASAGRAND VIVACITY
CASA GRANDE GARDEN CITY BUILDERS PVT LTD
Mahendra Solterra Aarya Phase-2
Mahendra Homes Private Limited
SIGNATURE SPLENDOR
SIGNATURE DWELLINGS PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: MAHIDHARA PROJECTS PRIVATE LIMITED
MAHIDHARA PROJECTS PRIVATE LIMITED has 2 registrations on RERA Karnataka, including MAHIDHARA CMR PPR FORTUNE CITY and Mahidhara Harmony. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Mahidhara Harmony is delayed beyond 10 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Mahidhara Harmony?
The registered promoter entity is MAHIDHARA PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U45400TS2007PTC054590 and GSTIN 29AAFCM1152K1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Mahidhara Harmony?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Mahidhara Harmony?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Mahidhara Harmony?
The professionals named in the filing: Architect: POORNAKRITI; Engineer: M/s. Adharshila Structures; Chartered Accountant: NSVR&ASSOCIATESLLP. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mahidhara Harmony?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.