ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Jeevans Octave

Registration approved No litigation declared Residential/Group Housing project

Jeevans Octave

By Jeevan Developers

RG-KA-67570 · RERA PRM/KA/RERA/1251/446/PR/120922/005233 · Last updated on RERA Karnataka portal: 24 Jun 2026

Source: official RERA Karnataka filing

Red flags

  • 3 complaints at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
Jun 2026Possession promisedmoved 12 months from the original
18 of 18Construction stages doneevery applicable stage filed complete
41 of 274Units unsoldnot recorded sold or booked
3Complaints at RERA Karnatakaon this registration
Jump to the 249 documents Report an error

Jeevans Octave is a Residential/Group Housing project by Jeevan Developers in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/120922/005233 on 12 Sep 2022. Possession is promised by 30 Jun 2026. The completion date has moved by 12 months from the original filing. 233 of the 274 units on this registration are recorded sold or booked, and 18 of 18 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameJeevans Octave
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560067
  • Pincode560067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/120922/005233
  • ReraGenie IDRG-KA-67570

Builder

  • NameJeevan Developers
  • Entity typePartnership Firm
  • GSTIN29AANFK6615K1ZS
  • Authorized SignatoryRepala Srinivas
  • Other registrations1 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredSep 2022First promiseJun 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on12 Sep 2022
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed249 files

Current status

85%233 of 274 units booked
151.2%Of the estimated cost spent so far

Figures as on 24 Jun 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JEEVANS OCTAVE---3360336

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 18 construction stages are filed complete.

Building: 100% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Retaining wall (All types)100%
Plinth level Beam100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
RCC or MS Framed structure100%
Masonry construction: Bricks, Concrete blocks etc100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing100%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network100%
Weather Proof work(tile,concrete)100%
Painting100%
Elevation work100%
Internal and External work including landscapes as per santioned drawings100%

Progress on shared amenities41

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes100%
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes100%
Water conservationNoNot applicable
Energy managementYes100%
Fire protection and fire safety requirementsYes100%
Education/Health/Other public amenitiesYes100%
Electricity supply transformer and substationYes100%
Emergency Evacuation servicesYes100%
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes100%
ElectricityYes100%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes100%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes100%
GymNoNot applicable
ParksNoNot applicable
Power BackupYes100%
GasNoNot applicable
Water and SanitationYes100%
Air Conditioning And incerntionNoNot applicable
StaircasesYes100%
LiftsYes100%
Staircases and Lift lobbies, corridor,lobbies, corridorYes100%
Fire escapesYes100%
Common entrance and exit for the building / common portico/foyer/verandahNoNot applicable
BasementYes100%
TerraceYes100%
Outer WallYes100%
Open parking areas and common storage spacesYes100%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes100%

Land and ownership6

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,509 sq m
Named landowners6
LandownerVillageDistrict
H S Shantha Kumar--
H S Shantha Kumar--
H S Shantha Kumar--
Erugadindla Bhaskar--
H S Shantha Kumar--
H S Shantha Kumar--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 145.08 cr
Cost incurredRs 219.40 cr
Spent of the estimate151.23%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 129.44 crRs 130.74 cr
Payment of taxesRs 7.02 crRs 7.86 cr
On-site expenditure-Site OverheadRs 5.46 crRs 75.19 cr
Interest PaidRs 3.15 crRs 5.62 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBommu Veera Narendranath Reddy
EngineerBoda Venkateshwar Rao
Chartered AccountantNirmala Sreenivasulu

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/446/PR/250625/005233Jun 2025 → Jun 2026

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka3

Case no.ComplainantRespondentFiled
00091/2023-Jeevan Developers18/01/2023
01350/2023-Jeevan Developers05/09/2023
01351/2023-Jeevan Developers05/09/2023

Documents filed249

As listed on the registration, under the names the promoter filed them with; the newest 80 of 249 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/120922/005233 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Jeevan Developers_.pdf24 Jun 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5.pdf24 Jun 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf24 Jun 2026
Q1 2026-27 Water supply and sewage board24 Jun 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)24 Jun 2026
Q1 2026-27 KPTCL- BESCOM24 Jun 2026
Q1 2026-27 Fire and Safety24 Jun 2026
Q1 2026-27 Airport Authority of India24 Jun 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Jeevan Developers_compressed.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4_compressed (1).pdf21 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5.pdf21 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf21 Jan 2026
Q3 2025-26 Water supply and sewage board21 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)21 Jan 2026
Q3 2025-26 KPTCL- BESCOM21 Jan 2026
Q3 2025-26 Fire and Safety21 Jan 2026
Q3 2025-26 Airport Authority of India21 Jan 2026
1. the promoter need to clarify , weather they are bringing additional land into the project afreFile: Clarification for additional land.pdf5 Aug 2024
1)Upload TDR certificate and utilization certificate for the increased FAR and built up areaFile: Agreement of Sale.pdf5 Aug 2024
1)Upload TDR certificate and utilization certificate for the increased FAR and built up areaFile: BDA DRC BACK.pdf5 Aug 2024
1)Upload TDR certificate and utilization certificate for the increased FAR and built up areaFile: BDA DRC FRONT.pdf5 Aug 2024
1)Upload TDR certificate and utilization certificate for the increased FAR and built up areaFile: Receipt sale deed.pdf5 Aug 2024
1)Upload TDR certificate and utilization certificate for the increased FAR and built up areaFile: Receipt.pdf5 Aug 2024
1)Upload TDR certificate and utilization certificate for the increased FAR and built up areaFile: Relinquishment Deed.pdf5 Aug 2024
1)Upload TDR certificate and utilization certificate for the increased FAR and built up areaFile: Request for TDR.pdf5 Aug 2024
1)Upload TDR certificate and utilization certificate for the increased FAR and built up areaFile: Sale Deed_11zon.pdf5 Aug 2024
2) Upload modified sanction and elevation drawing.File: Jeevans Octave Revised Plan 2_compressed.pdf5 Aug 2024
2) Upload modified sanction and elevation drawing.File: Jeevans Octave Revised Plan 3_compressed.pdf5 Aug 2024
2) Upload modified sanction and elevation drawing.File: Jeevans Octave Revised Plan_compressed.pdf5 Aug 2024
1) Please update the brief BHK wise details as per the As Per Modified Plan.File: Brify Flat Details.pdf5 Aug 2024
2) Please upload the Structural Engineer Certificate for stability of structure for the modified plaFile: structural Stability Report.pdf5 Aug 2024
3) Please upload the notarized affidavit for the modified plan.File: Affidavit for Modified Plan.pdf5 Aug 2024
4) Please upload the self attested copy of sold and unsold details along with the abstract details sFile: Sold and Unsold.pdf5 Aug 2024
5) Please upload the all required NOC's pertains to themodification plan.File: AIRPORT NOC.pdf5 Aug 2024
5) Please upload the all required NOC's pertains to themodification plan.File: BESCOM NOC.pdf5 Aug 2024
5) Please upload the all required NOC's pertains to themodification plan.File: BSNL NOC.pdf5 Aug 2024
5) Please upload the all required NOC's pertains to themodification plan.File: Fire NOC 2.pdf5 Aug 2024
5) Please upload the all required NOC's pertains to themodification plan.File: Fire NOC.pdf5 Aug 2024
5) Please upload the all required NOC's pertains to themodification plan.File: NOC_SEIAA.pdf5 Aug 2024
5) Please upload the all required NOC's pertains to themodification plan.File: PCB NOC.pdf5 Aug 2024
5) Please upload the all required NOC's pertains to themodification plan.File: ROAD NOC.pdf5 Aug 2024
5) Please upload the all required NOC's pertains to themodification plan.File: WATER NOC.pdf5 Aug 2024
QRs of their earlier projectFile: Quarterly Returns clarification.pdf8 Sep 2022
Amended partnership deedFile: AMENDEMENT TO RECONSTITUTION DEED.pdf8 Sep 2022
Proforma of Agreement of SaleFile: Proforma for Agreement of Sale.pdf8 Sep 2022
promoter not mentioned all project syno in project detail pageFile: Clarification for Project Sy Nos.pdf23 Aug 2022
need RTC obtained by revenue department office for all synosFile: RTCS Final.pdf23 Aug 2022
regarding syno 95/12 need registered GPA from anjanappa to n krishnadasFile: Confirmation Deed Sy No 95-12 final.pdf23 Aug 2022
need family tree of anjanappaFile: Family Tree.pdf23 Aug 2022
need local authorithy khata for full project extentFile: Katha 95 3, 4, 5, 12 & 13.pdf23 Aug 2022
notarized Non- litigation affidavit with respect the property regarding land acquisition, court caseFile: Non Litigation Affidavit.pdf23 Aug 2022
MR for syno 95/5 and 95/13File: MR 95_5_MR 95_13_merged.pdf23 Aug 2022
Upload building license.File: Building Licence.pdf23 Aug 2022
Clear and Legible sanction drawingsFile: Clear and Legible Sanction Drawing 1_compressed.pdf23 Aug 2022
Clear and Legible sanction drawingsFile: Clear and Legible Sanction Drawing 2_compressed.pdf23 Aug 2022
Clear and Legible sanction drawingsFile: Clear and Legible Sanction Drawing 3_compressed.pdf23 Aug 2022
Upload single plot layoutFile: Single Plot Layout Plan.pdf23 Aug 2022
Upload single plot layout PlanFile: Single Plot Layout Plan.pdf23 Aug 2022
Upload Commencement CertificateFile: COMMENCEMENT CERTIFICATE.pdf23 Aug 2022
Upload the section 3(1) notarized affidavit comprising with project name and addressFile: AFFIDAVIT 3(1).pdf23 Aug 2022
Upload Agreement for sale is in conformity with the GOK notified agreement for saleFile: Proforma of Agreement of Sale.pdf23 Aug 2022
upload the Proforma of Allotment LetterFile: Proforma of Allotment Letter.pdf23 Aug 2022
Balance Sheet 2018-19File: Balance Sheet 2018-19.pdf12 Jul 2022
Profit & Loss 2018-19File: Profit & Loss 2018-19.pdf12 Jul 2022
Balance Sheet 2019-20File: Balance Sheet 2019-20.pdf12 Jul 2022
Profit & Loss 2019-20File: Profit & Loss 2019-20.pdf12 Jul 2022
Balance Sheet 2021-22File: Balance Sheet 2021-22.pdf12 Jul 2022
Profit & Loss 2021-22File: Profit & Loss 2021-22.pdf12 Jul 2022
Mutation Registar 95/3File: MR 95 3.pdf12 Jul 2022
RTC 95/3File: RTC 95_3.pdf12 Jul 2022
Akharbandh_Sy No 95/3File: Akharbandh_Sy No 95_3.pdf12 Jul 2022
Conversion Order Sy No 95/3File: Conversion Order Sy No 95_3.pdf12 Jul 2022
Sale Agreement Sy No 95/3File: Sale Agreement Sy No 95-3 .pdf12 Jul 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Jeevan PristineSurvey No 79, 2, Laxminarayana Temple Rd, Sapthagiri Layout, Thubarahalli, MunnekollalCompleted-No date filed

How this compares with Bengaluru Urban

85%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Jeevans Octave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmJeevans OctaveOther 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 29 registered projects within 2 km.

Builder: Jeevan Developers

JEEVAN DEVELOPERS has 2 registrations on RERA Karnataka, including JEEVAN'S ALLURE and Jeevans Octave. Its filings declare 3 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Jeevans Octave is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Jeevans Octave?

The registered promoter entity is Jeevan Developers, a partnership firm as per the filing. Its GSTIN 29AANFK6615K1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Jeevans Octave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Jeevans Octave?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Jeevans Octave?

The professionals named in the filing: Architect: Bommu Veera Narendranath Reddy; Engineer: Boda Venkateshwar Rao; Chartered Accountant: Nirmala Sreenivasulu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jeevans Octave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jeevans Octave. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jeevans Octave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.