Home / Browse projects / Bengaluru Urban, Karnataka / In That Quiet Earth Phase 2B

Registration approved Litigation declared Residential/Group Housing project

In That Quiet Earth Phase 2B

By Total Environment Constructions Private Limited

RG-KA-42046 · RERA PRM/KA/RERA/1251/446/PR/060722/005044 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared, 8 cases
  • 1 complaint at RERA Karnataka

Clear

  • Completion date never moved
  • Separate project account declared
May 2028Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 80%
5 of 324Units unsoldnot recorded sold or booked
1Complaints at RERA Karnatakaon this registration
Jump to the 191 documents Report an error

In That Quiet Earth Phase 2B is a Residential/Group Housing project by Total Environment Constructions Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/060722/005044 on 6 Jul 2022. Possession is promised by 1 May 2028. 319 of the 324 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameIn That Quiet Earth Phase 2B
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560077
  • Pincode560077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/060722/005044
  • ReraGenie IDRG-KA-42046

Builder

  • NameTotal Environment Constructions Private Limited
  • Entity typeCompany
  • GSTIN29AACCT0477D1ZE
  • Authorized SignatorySuresh Chandra Bhandari
  • MdMr. Kamal Sagar
  • DirectorsMr. Veeresh Hiremath, ABRAAR AHMED
  • Project HeadMr. Gaurav Balkrishna Kamat Sambari
  • Other registrations5 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredJul 2022PromisedMay 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Jul 2022
  • Promised completion1 May 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed191 files

Current status

98%319 of 324 units booked
37.8%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 5---1080108
Tower 6---1080108
Tower 7---1080108

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 80%.

Building: 10% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work80%
Foundation footing work60%
Upto Plinth Level0%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)0%
RCC or MS Framed structure31%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja work0%
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffYes0%
Water conservation and renewable energyYes0%
Common storage spacesYes0%

Land and ownership22

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,527 sq m
Named landowners22
LandownerVillageDistrict
Total Environment Constructions Private Limited--
Total Environment Constructions Privatea Limited--
Total Environment Constructions Private Limited--
Total Environment Constructions Private Limited--
Total Environment Constructions Privatea Limited--
Total Environment Constructions Private Limited--
Total Environment Constructions Privatea Limited--
Total Environment Constructions Private Limited--
Total Environment Constructions Private Limited--
Total Environment Constructions Private Limited--
Total Environment Constructions Private Limited--
Total Environment Constructions Private Limited--
Total Environment Constructions Private Limited--
Chikka Anjinappa--
Total Environment Constructions Privatea Limited--
Total Environment Constructions Privatea Limited--
Total Environment Constructions Privatea Limited--
Total Environment Constructions Private Limited--
Total Environment Constructions Private Limited--
Total Environment Constructions Private Limited--
Total Environment Constructions Private Limited--
Total Environment Constructions Private Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 728.97 cr
Cost incurredRs 275.69 cr
Spent of the estimate37.82%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 491.84 crRs 58.19 cr
Interest on BorrowingsRs 108.00 cr-
Administrative CostsRs 96.85 cr-
On-site expenditure-Consultants FeesRs 32.28 crRs 56.02 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVarun Biltoria
EngineerVishnu Kumar

Litigation declared8

CaseCourtStatus
OS No 443/2022/2022III Additional Senior Civil Judge, Bangalore Rural-
OS No 1085/2022/2022IV Additional Senior Civil Judge, Bangalore Rural-
WP No 4484/2021 and 10542/2020/2020High Court of Karnataka-
WP 2333/2021/2021High Court of Karnataka-
OS 1253/2015/2015City Civil court, Bangalore Rural-
TMP/230917/4235RERA Court-
01467/2023/2023RERA Court-
00027/2024/2024RERA Court-

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01467/2023-Total Environment Constructions Private Limited21/09/2023

Documents filed191

As listed on the registration, under the names the promoter filed them with; the newest 80 of 191 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/060722/005044 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 IN THAT QUIET EARTH PHASE 2B Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM-5 IN THAT QUIET EARTH PHASE 2B Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM-6 IN THAT QUIET EARTH PHASE 2B Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 ITQE 2B Q1 26-27.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 ITQE 2B Q1 26-27.PDF15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 ITQE 2B Q1 26-27.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Q4 25-26 ITQE phase 2B.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Q4 25-26 ITQE phase 2B.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Q4 25-26 ITQE phase 2B.pdf15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q3-25-26.pdf27 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5.pdf27 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Q3.pdf27 Jan 2026
JDA - Executed - 68 and 69-1File: JDA - Executed 68 and 69-1.pdf1 Jul 2022
JDA - Executed - 69-2File: JDA - Executed - 69-2.pdf1 Jul 2022
JDA - Munirajappa - 75-1File: JDA - Munirajappa - 75-1.pdf1 Jul 2022
JDA - Kempamma - 75-3File: JDA - Kempamma - 75-3.pdf1 Jul 2022
Khatha certificate and Amalgamation deed Tower 5File: Khatha certificate and Amalgamation deed Tower 5.pdf1 Jul 2022
JDA Affidavit ITQE - Affidavit to RERAFile: JDA Affidavit ITQE - Affidavit to RERA.pdf1 Jul 2022
RERA Proforma Agreement for SaleFile: RERA Proforma Agreement for Sale.pdf1 Jul 2022
Form 1 Chartered Accountant CertificateFile: Form 1.pdf6 May 2022
Financial statement for 2020-21 with UDINFile: TEC Final Accounts 31-03-2021 Signed.pdf6 May 2022
Bank Account Confirmation LetterFile: Bank Account Confirmation Letter.pdf6 May 2022
AOA & MOA and Court Order for Sy No 69-2File: AOA & MOA and Court Order.pdf6 May 2022
Conversion Order Sy No 69-2File: Conversion Order Sy No 69-2.PDF6 May 2022
Conversion Order 69-2(p)File: Conversion Order 69-2(p).pdf6 May 2022
Demarcation of sy no 62/2 62/2P on BBMP Plan with project area 1File: Demarcation of sy no 62:2 62:2P on BBMP Plan with project area 1.pdf6 May 2022
MR - T2-2016-17 - Sy No 69-2File: MR - T2-2016-17 - Sy No 69-2.pdf6 May 2022
MR - T9-2015-16 - Sy No 69-2(p)File: MR - T9-2015-16 - Sy No 69-2(p).pdf6 May 2022
EC 2004-2022 Sy No 69/1File: EC 2004-2022 Sy No 69:1.pdf6 May 2022
EC Sy No 69-2 2004-2021File: EC Sy No 69-2 2004-2021.pdf6 May 2022
S 69-2_EC_01 09 2018_12 03 2019 [pilamma]File: S 69-2_EC_01 09 2018_12 03 2019 [pilamma].pdf6 May 2022
Sy No 68 EC 2004 2022File: Sy No 68 EC 2004 2022.pdf6 May 2022
EC Sy No 75-1 2004-2022File: EC Sy No 75-1 2004-2022.pdf6 May 2022
Sy No 75-2 1957 - 2022File: Sy No 75-2 1957 - 2022.pdf6 May 2022
EC Sy No 75-3 1960 - 2022File: EC Sy No 75-3 1960 - 2022.pdf6 May 2022
EC Sy No 75-10 1960-2022File: EC Sy No 75-10 1960-2022.pdf6 May 2022
BDA Development Work orderFile: BDA Development Work order.pdf6 May 2022
Certified Extract of Master PlanFile: Land use MAP CDP.pdf6 May 2022
Form 3 Engineer CertificateFile: Form 3.pdf6 May 2022
Current BrochureFile: Project Brochure.pdf6 May 2022
NOC BWSSB and additional NOC ApplicationFile: NOC BWSSB and Renewed NOC Application.pdf6 May 2022
Proforma AOSFile: Proforma AOS.pdf6 May 2022
Highlighted STP demarcationFile: 20220429_STP Demarcation on BBMP Plan.pdf6 May 2022
STP design drawingFile: 260 KLD STP Drawing.pdf6 May 2022
RERA Demarcation on BBMP Plan with project areaFile: 20220429_RERA Demarcation on BBMP Plan with project area.pdf6 May 2022
NOC AirportFile: NOC HAL.pdf6 May 2022
Title Deed 68 and 69-1File: Title Deed 68_69-1.pdf6 May 2022
MR 27 68 and 69-1File: MR 27 68_69-1.pdf6 May 2022
Release Deed 75-3File: Release Deed 75-3.pdf6 May 2022
Title Deed 75-3File: Title Deed 75-3.pdf6 May 2022
Partition Deed 75-10File: Partition Deed 75-10.pdf6 May 2022
75-2 Sale DeedFile: 75-2 Sale Deed.PDF6 May 2022
Partition Deed 75-2File: Partition Deed 75-2.pdf6 May 2022
Title deed 75-1File: Title deed 75-1.pdf6 May 2022
MR_18 75-1File: MR_18 75-1.pdf6 May 2022
AOA & MOA 69-2File: AOA & MOA 69-2.pdf6 May 2022
AOA & GPA Sy No 68File: AOA & GPA Sy No 68.pdf6 May 2022
AOA & GPA Sy No 69-1File: AOA & GPA Sy No 69-1.pdf6 May 2022
Sale Deed 75-2File: Sale Deed 75-2.pdf6 May 2022
Sale Deed Sy No 69-2(p)File: Sale Deed Sy No 69-2(p).pdf6 May 2022
Sale Deed 75-10File: Sale Deed 75-10.pdf6 May 2022
NOC BESCOMFile: NOC BESCOM.pdf6 May 2022
RTC, survey 68-
Mutation, survey 68-
Encumbrance Certificate, survey 68-
Conversion/Alienation Order, survey 68-
Sale/Title/Gift Deed, survey 68-
Khatha, survey 68-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
In that Quiet Earth - Phase 1Katha no 28 & 46, Bileshivale Village, , Bidarhalli Hobli, Ward no 54, , Bengaluru East , Bengaluru UrbanOngoingJun 2026Not delivered
A Few Honest WordsVanivilas Road, Vishweshwarapura, Shankarapura, Bengaluru.Completed-No date filed

How this compares with Bengaluru Urban

98%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep In That Quiet Earth Phase 2B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmIn That Quiet Earth PhasOther 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: Total Environment Constructions Private Limited

Total Environment Constructions Private Limited has 6 registrations on RERA Karnataka, including A Few Honest Words and IN THAT QUIET EARTH PHASE 2C. Its filings declare 5 earlier projects, 1 of them declared completed. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if In That Quiet Earth Phase 2B is delayed beyond 1 May 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of In That Quiet Earth Phase 2B?

The registered promoter entity is Total Environment Constructions Private Limited, a company as per the filing. Its GSTIN 29AACCT0477D1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in In That Quiet Earth Phase 2B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against In That Quiet Earth Phase 2B?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at In That Quiet Earth Phase 2B?

The professionals named in the filing: Architect: Varun Biltoria; Engineer: Vishnu Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in In That Quiet Earth Phase 2B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About In That Quiet Earth Phase 2B. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save In That Quiet Earth Phase 2B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.