Home / Browse projects / Chitradurga, Karnataka / Hiriyur 624 dus

Registration approved No litigation declared Residential/Group Housing project

Hiriyur 624 dus

By Hiriyur CMC

RG-KA-04619 · RERA PRM/KA/RERA/1256/329/PR/101122/005437 · Last updated on RERA Karnataka portal: 8 Nov 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jan 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 78 documents Report an error

Hiriyur 624 dus is a Residential/Group Housing project by Hiriyur CMC in Chitradurga, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1256/329/PR/101122/005437 on 10 Nov 2022. Possession is promised by 29 Jan 2024.

At a glance

Project

  • NameHiriyur 624 dus
  • TypeResidential/Group Housing
  • Location
    • Hiriyur
    • Chitradurga
    • 577598
  • Pincode577598
  • RERA no.PRM/KA/RERA/1256/329/PR/101122/005437
  • ReraGenie IDRG-KA-04619

Builder

  • NameHiriyur CMC
  • Entity typeRajiv Gandhi Housing Corporation Limited
  • Authorized SignatoryCommissioner

Key dates

this monthRegisteredNov 2022PromisedJan 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on10 Nov 2022
  • Promised completion29 Jan 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Hiriyur AHP---6240624

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 8 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 8 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area27,396 sq m
Named landowners1
LandownerVillageDistrict
CMC Commissioner--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 43.95 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 40.82 cr-
On-site expenditure-Salaries of workersRs 2.20 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 68.29 lakh-
On-site expenditure-Site OverheadRs 20.00 lakh-
On-site expenditure-Consultants FeesRs 4.50 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectImprints consultancy service
EngineerChandrashekar
Chartered AccountantAccount superintendent

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed78

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1256/329/PR/101122/005437 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Work orderFile: Rajiv Gandhi Hiriyur Aggrement.pdf8 Nov 2022
DPR plan, site plan etcFile: RGHCL HIRIYUR APPROVED DRGS_compressed.pdf8 Nov 2022
RTC, survey 531-
Mutation, survey 531-
Encumbrance Certificate, survey 531-
Khatha, survey 531-
Registration CertificateFile: CMC Notification Kannada.pdf-
GST Certificate-
Certificate issued by CA Form 1File: EC.jpg-
Certificate issued by Architect Form 2File: Sign.jpg-
Certificate issued by Engineer Form 3File: GSt.jpg-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: JD Affidavit cum declaration.pdf-
Certificate from Chartered AccountFile: GSt.jpg-
Balance Sheet 2020 - 2021File: Pan.jpg-
Balance Sheet 2019 - 2020File: EC.jpg-
Balance Sheet 2018 - 2019File: Passbook.jpg-
Audited Profit and Loss Statement 2020 - 2021File: Passbook.jpg-
Audited Profit and Loss Statement 2019 - 2020File: GSt.jpg-
Audited Profit and Loss Statement 2018 - 2019File: EC.jpg-
Director's Report 2020 - 2021File: Pan.jpg-
Director's Report 2019 - 2020File: GSt.jpg-
Director's Report 2018 - 2019File: Passbook.jpg-
Cash Flow Statement 2020 - 2021File: GSt.jpg-
Cash Flow Statement 2019 - 2020File: EC.jpg-
Auditor's Report 2020 - 2021File: Cons certificate.jpg-
Auditor's Report 2019 - 2020File: Cons adhaar.jpg-
Auditor's Report 2018 - 2019File: Passbook.jpg-
Income Tax Return Acknowledgement 2020 - 2021File: Pan.jpg-
Income Tax Return Acknowledgement 2019 - 2020File: EC.jpg-
Income Tax Return Acknowledgement 2018 - 2019File: GSt.jpg-
AHP BLC Approved Yearwise-
Sign-
Sign-
8 Acre Land Order 624 DUs-
Khatha-
8 Acre Land Order 624 DUs-
AHP BLC Approved Yearwise-
Plan-
Plan-
Plan-
8 Acre Land Order 624 DU's-
Khatha-
Adhar-
Sign-
8 Acre Land Order 624 DUs-
CMC Notification Kannada-
Khatha-
EC-
Sign-
EC-
GSt-
Khatha-
8 Acre Land Order 624 DUs-
Sign-
JD Affidavit cum declaration-
JD Affidavit cum declaration-
Sign-
office image-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Pan-
Unnamed document-
Unnamed document-
Sign-

How this compares with Chitradurga

5%of Chitradurga projects moved their completion datethis one has not
0%of Chitradurga registrations are shown as withdrawn or revokedthis one is not

Computed across the 34 Chitradurga projects on ReraGenie, from their own filings.

Keep Hiriyur 624 dus on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Chitradurga34 in Chitradurga

Builder: Hiriyur CMC

Hiriyur CMC has 1 registration on RERA Karnataka, including Hiriyur 624 dus. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Chitradurga district page.

Frequently asked questions

What are my rights if Hiriyur 624 dus is delayed beyond 29 Jan 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Hiriyur 624 dus?

The registered promoter entity is Hiriyur CMC, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Hiriyur 624 dus?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Hiriyur 624 dus?

The professionals named in the filing: Architect: Imprints consultancy service; Engineer: Chandrashekar; Chartered Accountant: Account superintendent. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hiriyur 624 dus?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hiriyur 624 dus. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hiriyur 624 dus to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.