Home / Browse projects / Chitradurga, Karnataka / Construction of 1001 DU’s (G+2) in Sy no.22 Mega

Registration approved No litigation declared Residential/Group Housing project

Construction of 1001 DU’s (G+2) in Sy no.22 Mega

By CMC Chitradurga

RG-KA-63680 · RERA PRM/KA/RERA/1256/327/PR/141223/006467 · Last updated on RERA Karnataka portal: 8 Dec 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jan 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 79 documents Report an error

Construction of 1001 DU’s (G+2) in Sy no.22 Mega is a Residential/Group Housing project by CMC Chitradurga in Chitradurga, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1256/327/PR/141223/006467 on 14 Dec 2023. Possession is promised by 11 Jan 2025.

At a glance

Project

  • NameConstruction of 1001 DU’s (G+2) in Sy no.22 Mega
  • TypeResidential/Group Housing
  • Location
    • Chitradurga
    • 577501
  • Pincode577501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1256/327/PR/141223/006467
  • ReraGenie IDRG-KA-63680

Builder

  • NameCMC Chitradurga
  • Entity typeRajiv Gandhi Housing Corporation Limited
  • Authorized SignatoryMunicipal Commissioner CMC Chitradurga

Key dates

this monthRegisteredDec 2023PromisedJan 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Dec 2023
  • Promised completion11 Jan 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block 1---12012

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 8 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 8 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area54,213 sq m
Named landowners1
LandownerVillageDistrict
Municipal Commissioner CMC Chitradurga--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 72.91 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 72.91 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSathish D R
EngineerRavishankar C
Chartered AccountantRavishankar C

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed79

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1256/327/PR/141223/006467 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
BESCOM NOCFile: Bescom Ahp Noc Letter.pdf8 Dec 2023
Water Supply NOCFile: Bescom Ahp Noc Letter.pdf8 Dec 2023
BSNL NOCFile: BSNL NOC CTA.pdf8 Dec 2023
RTC, survey 22-
Mutation, survey 22-
Encumbrance Certificate, survey 22-
Conversion/Alienation Order, survey 22-
Khatha, survey 22-
Registration CertificateFile: CTA PAN.jpg-
GST Certificate-
Certificate issued by CA Form 1File: Chitradurga AHP DPR cost details.pdf-
Certificate issued by Architect Form 2File: Chitradurga AHP DPR cost details.pdf-
Certificate issued by Engineer Form 3File: Chitradurga AHP DPR cost details.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Sy No 22.pdf-
Certificate from Chartered AccountFile: Chitradurga AHP DPR cost details.pdf-
Balance Sheet 2021 - 2022File: CTA PAN.jpg-
Balance Sheet 2020 - 2021File: CTA PAN.jpg-
Balance Sheet 2019 - 2020File: CTA PAN.jpg-
Audited Profit and Loss Statement 2021 - 2022File: CTA PAN.jpg-
Audited Profit and Loss Statement 2020 - 2021File: CTA PAN.jpg-
Audited Profit and Loss Statement 2019 - 2020File: CTA PAN.jpg-
Director's Report 2021 - 2022File: CTA PAN.jpg-
Director's Report 2020 - 2021File: CTA PAN.jpg-
Director's Report 2019 - 2020File: CTA PAN.jpg-
Cash Flow Statement 2021 - 2022File: CTA PAN.jpg-
Cash Flow Statement 2020 - 2021File: CTA PAN.jpg-
Auditor's Report 2021 - 2022File: CTA PAN.jpg-
Auditor's Report 2020 - 2021File: CTA PAN.jpg-
Auditor's Report 2019 - 2020File: CTA PAN.jpg-
Income Tax Return Acknowledgement 2021 - 2022File: CTA PAN.jpg-
Income Tax Return Acknowledgement 2020 - 2021File: CTA PAN.jpg-
Income Tax Return Acknowledgement 2019 - 2020File: CTA PAN.jpg-
Sy No Grant order_compressed-
CMC adress-
CTA AHP Drawings building-
CTA AHP Drawings_compressed-
CTA AHP Drawings building-
CTA AHP Drawings_compressed-
CTA AHP Drawings building-
CTA AHP Drawings_compressed-
CTA AHP Drawings building-
CTA AHP Drawings_compressed-
CTA AHP Drawings_compressed-
CTA AHP Drawings building-
Sy No Grant order_compressed-
Sy No Grant order_compressed-
Sy No Grant order_compressed-
Sy No Grant order_compressed-
Sy No Grant order_compressed-
Sy No Grant order_compressed-
Sy No Grant order_compressed-
Sy No Grant order_compressed-
Sy No Grant order_compressed-
CTA AHP Drawings_compressed-
Sy No Grant order_compressed-
CTA AHP Drawings_compressed-
Sy No Grant order_compressed-
CTA AHP Drawings building-
CTA AHP Drawings building-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
CTA AHP Drawings_compressed-

How this compares with Chitradurga

5%of Chitradurga projects moved their completion datethis one has not
0%of Chitradurga registrations are shown as withdrawn or revokedthis one is not

Computed across the 34 Chitradurga projects on ReraGenie, from their own filings.

Keep Construction of 1001 DU’s (G+2) in Sy no.22 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Chitradurga34 in Chitradurga

Builder: CMC Chitradurga

CMC Chitradurga has 1 registration on RERA Karnataka, including Construction of 1001 DU’s (G+2) in Sy no.22 Mega. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Chitradurga district page.

Frequently asked questions

What are my rights if Construction of 1001 DU’s (G+2) in Sy no.22 Mega is delayed beyond 11 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Construction of 1001 DU’s (G+2) in Sy no.22 Mega?

The registered promoter entity is CMC Chitradurga, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Construction of 1001 DU’s (G+2) in Sy no.22 Mega?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Construction of 1001 DU’s (G+2) in Sy no.22 Mega?

The professionals named in the filing: Architect: Sathish D R; Engineer: Ravishankar C; Chartered Accountant: Ravishankar C. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Construction of 1001 DU’s (G+2) in Sy no.22 Mega?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Construction of 1001 DU’s (G+2) in Sy no.22 Mega. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Construction of 1001 DU’s (G+2) in Sy no.22 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.