Home / Browse projects / Aravalli, Gujarat / FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51
FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51
RG-GJ-93073 · RERA PR/GJ/ARAVALLI/MODASA/Others/RAA02526/260418 · Last updated on GujRERA portal: 5 Sep 2020
Source: official GujRERA filing
Red flags
- No red flags in this filing
Clear
- Completion date never moved
- Separate project account declared
Saved.
FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51 is a Residential/Group Housing project by SWARNIM CORPORATION in Aravalli, Gujarat, registered with GujRERA as PR/GJ/ARAVALLI/MODASA/Others/RAA02526/260418 on 26 Apr 2018. Possession is promised by 30 Sep 2020. 16 of the 30 units on this registration are recorded sold or booked, and 96 of 96 construction stages are filed complete.
At a glance
Project
- NameFORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51
- TypeResidential/Group Housing
- Location
- FORAM SWARNIM RESIDENCY
- MALPUR ROAD
- MODASA
- Modasa
- Aravalli
- 383315
- Pincode383315
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR/GJ/ARAVALLI/MODASA/Others/RAA02526/260418
- ReraGenie IDRG-GJ-93073
Builder
- NameSWARNIM CORPORATION
- Entity typePARTNERSHIP FIRM
Key dates
Key facts
Registration and timeline
- StatusValid until 30 Sep 2020
- Registered on26 Apr 2018
- Promised completion30 Sep 2020
- Revised completionNone
- Buildings16 building records
- Documents filed53 files
Current status
Figures as on 5 Sep 2020, this project's latest GujRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B8+B9 | - | - | - | 2 | 0 | 2 |
| B10B+B11 | - | - | - | 2 | 0 | 2 |
| B14+B15 | - | - | - | 2 | 0 | 2 |
| B21 | - | - | - | 1 | 0 | 1 |
| B22+B23 | - | - | - | 2 | 0 | 2 |
| B24+B25 | - | - | - | 2 | 0 | 2 |
| B26+B27 | - | - | - | 2 | 0 | 2 |
| B28+B29 | - | - | - | 2 | 0 | 2 |
| B30+B31 | - | - | - | 2 | 0 | 2 |
| B32+B33 | - | - | - | 2 | 0 | 2 |
| B34+B35 | - | - | - | 2 | 0 | 2 |
| B36+B37 | - | - | - | 2 | 0 | 2 |
| B43 | - | - | - | 1 | 0 | 1 |
| B44+B45 | - | - | - | 2 | 0 | 2 |
| B48+B49 | - | - | - | 2 | 0 | 2 |
| B50+B51 | - | - | - | 2 | 0 | 2 |
The full filing
Everything below is from the project's own GujRERA filing, free to read.
Construction progress by building16
As on 5 Sep 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
96 of 96 construction stages are filed complete across 16 buildings.
B8+B9100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B10B+B11100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B14+B15100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B21100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B22+B23100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B24+B25100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B26+B27100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B28+B29100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B30+B31100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B32+B33100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B34+B35100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B36+B37100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B43100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B44+B45100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B48+B49100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
B50+B51100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
Progress on shared amenities19
As on 5 Sep 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal roads and footpaths | Yes | 100% |
| Water supply | Yes | 100% |
| Sewerage (chamber, lines, septic tank, STP) | Yes | 100% |
| Storm water drains | No | Not applicable |
| Landscaping and tree planting | Yes | 100% |
| Street lighting | Yes | 100% |
| Community buildings | No | Not applicable |
| Treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | 100% |
| Water conservation, rain water harvesting | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Fire fighting | No | Not applicable |
| Drinking water facilities | Yes | 100% |
| Emergency evacuation | Yes | 100% |
| Use of renewable energy | No | Not applicable |
| Security | Yes | 100% |
| Letter box | Yes | 100% |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B8+B9 | NA | Rs 16.19 lakh | Rs 12.34 lakh |
| B10B+B11 | NA | Rs 16.19 lakh | Rs 12.34 lakh |
| B14+B15 | NA | Rs 16.19 lakh | Rs 12.34 lakh |
| B21 | NA | Rs 16.19 lakh | Rs 12.34 lakh |
| B22+B23 | NA | Rs 16.19 lakh | Rs 12.34 lakh |
| B24+B25 | NA | Rs 16.19 lakh | Rs 12.34 lakh |
| B26+B27 | NA | Rs 16.19 lakh | Rs 12.34 lakh |
| B28+B29 | NA | Rs 16.19 lakh | Rs 12.34 lakh |
| B30+B31 | NA | Rs 16.19 lakh | Rs 12.34 lakh |
| B32+B33 | NA | Rs 16.19 lakh | Rs 12.34 lakh |
| B34+B35 | NA | Rs 16.19 lakh | Rs 12.34 lakh |
| B36+B37 | NA | Rs 16.19 lakh | Rs 12.34 lakh |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CHINTANKUMAR CHIMANLAL PATEL |
| Engineer | RAJENDRAKUMAR PRAVINCHANDRA SONI |
Documents filed53
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/ARAVALLI/MODASA/Others/RAA02526/260418 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect's certificate (Form 1) | 5 Sep 2020 |
| Engineer's certificate (Form 2) | 5 Sep 2020 |
| Engineer's certificate annexure | 5 Sep 2020 |
| Accountant's certificate (Form 3) | 5 Sep 2020 |
| Site photograph, B8+B9 | 5 Sep 2020 |
| Site photograph, B10B+B11 | 5 Sep 2020 |
| Site photograph, B14+B15 | 5 Sep 2020 |
| Site photograph, B21 | 5 Sep 2020 |
| Site photograph, B22+B23 | 5 Sep 2020 |
| Site photograph, B24+B25 | 5 Sep 2020 |
| Site photograph, B26+B27 | 5 Sep 2020 |
| Site photograph, B28+B29 | 5 Sep 2020 |
| Site photograph, B30+B31 | 5 Sep 2020 |
| Site photograph, B32+B33 | 5 Sep 2020 |
| Site photograph, B34+B35 | 5 Sep 2020 |
| Site photograph, B36+B37 | 5 Sep 2020 |
| Site photograph, B43 | 5 Sep 2020 |
| Site photograph, B44+B45 | 5 Sep 2020 |
| Site photograph, B48+B49 | 5 Sep 2020 |
| Site photograph, B50+B51 | 5 Sep 2020 |
| RERA registration certificate | 26 Apr 2018 |
| Proforma agreement for sale | - |
| Auditor's report (1 of 3) | - |
| Auditor's report (2 of 3) | - |
| Auditor's report (3 of 3) | - |
| Income tax return (1 of 3) | - |
| Income tax return (2 of 3) | - |
| Income tax return (3 of 3) | - |
| Project specific document | - |
| Directors' report (1 of 3) | - |
| Directors' report (2 of 3) | - |
| Directors' report (3 of 3) | - |
| Commencement certificate | - |
| Approved sanctioned plan | - |
| Approved layout plan | - |
| Agreement | - |
| Land location | - |
| Encumbrance certificate | - |
| Area development document | - |
| Proforma allotment letter | - |
| Brochure | - |
| Project related document | - |
| Declaration in Form B | - |
| Project photograph | - |
| Audited balance sheet (1 of 3) | - |
| Audited balance sheet (2 of 3) | - |
| Audited balance sheet (3 of 3) | - |
| Audited profit and loss statement (1 of 3) | - |
| Audited profit and loss statement (2 of 3) | - |
| Audited profit and loss statement (3 of 3) | - |
| Cash flow statement (1 of 3) | - |
| Cash flow statement (2 of 3) | - |
| Cash flow statement (3 of 3) | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Keep FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Modasa17 in Aravalli
Filed coordinates, straight-line distance. 14 registered projects within 2 km.
VANDEMATARAM CITY CENTER
VYAPNILA TERMINALS (MODASA) PRIVATE LIMITE
APSARA BUSINESS CENTRE
C K PROPERTY
paavancity phase 3
SHREE RAJ GROUP
SIDDHI VINAYAK BUNGLOWS & ARCADE
BROOKLAND SIDDHIVINAYAK PROJECTS
BANDHAN ARCADE
BANDHAN DEVELOPERS
PAAVANCITY PHASE 2
SHREE RAJ GROUP
See every Aravalli project, with the district possession charts
Builder: SWARNIM CORPORATION
SWARNIM CORPORATION has 1 registration on GujRERA, including FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51. Read the full track record. See more projects on the Aravalli district page.
Frequently asked questions
What are my rights if FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51 is delayed beyond 30 Sep 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.
How do I verify and contact the developer of FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51?
The registered promoter entity is SWARNIM CORPORATION, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.
Is my payment protected in FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51?
The professionals named in the filing: Architect: CHINTANKUMAR CHIMANLAL PATEL; Engineer: RAJENDRAKUMAR PRAVINCHANDRA SONI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.
Report an error Share feedback