Valid until 30 Sep 2020 Residential/Group Housing project

FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51

By SWARNIM CORPORATION

RG-GJ-93073 · RERA PR/GJ/ARAVALLI/MODASA/Others/RAA02526/260418 · Last updated on GujRERA portal: 5 Sep 2020

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Sep 2020Possession promisedno revision filed
96 of 96Construction stages doneacross 16 buildings; every applicable stage filed complete
14 of 30Units unsoldnot recorded sold or booked
Jump to the 53 documents Report an error

FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51 is a Residential/Group Housing project by SWARNIM CORPORATION in Aravalli, Gujarat, registered with GujRERA as PR/GJ/ARAVALLI/MODASA/Others/RAA02526/260418 on 26 Apr 2018. Possession is promised by 30 Sep 2020. 16 of the 30 units on this registration are recorded sold or booked, and 96 of 96 construction stages are filed complete.

At a glance

Project

  • NameFORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51
  • TypeResidential/Group Housing
  • Location
    • FORAM SWARNIM RESIDENCY
    • MALPUR ROAD
    • MODASA
    • Modasa
    • Aravalli
    • 383315
  • Pincode383315
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/ARAVALLI/MODASA/Others/RAA02526/260418
  • ReraGenie IDRG-GJ-93073

Builder

  • NameSWARNIM CORPORATION
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredApr 2018PromisedSep 2020

Key facts

Registration and timeline

  • StatusValid until 30 Sep 2020
  • Registered on26 Apr 2018
  • Promised completion30 Sep 2020
  • Revised completionNone
  • Buildings16 building records
  • Documents filed53 files

Current status

53%16 of 30 units booked
76.2%Of the estimated cost spent so far

Figures as on 5 Sep 2020, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B8+B9---202
B10B+B11---202
B14+B15---202
B21---101
B22+B23---202
B24+B25---202
B26+B27---202
B28+B29---202
B30+B31---202
B32+B33---202
B34+B35---202
B36+B37---202
B43---101
B44+B45---202
B48+B49---202
B50+B51---202

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building16

As on 5 Sep 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

96 of 96 construction stages are filed complete across 16 buildings.

B8+B9100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B10B+B11100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B14+B15100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B21100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B22+B23100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B24+B25100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B26+B27100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B28+B29100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B30+B31100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B32+B33100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B34+B35100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B36+B37100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B43100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B44+B45100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B48+B49100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B50+B51100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable

Progress on shared amenities19

As on 5 Sep 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesYes100%
Emergency evacuationYes100%
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,101 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.59 cr
Cost incurredRs 1.97 cr
Spent of the estimate76.22%
BuildingWingEstimatedIncurred
B8+B9NARs 16.19 lakhRs 12.34 lakh
B10B+B11NARs 16.19 lakhRs 12.34 lakh
B14+B15NARs 16.19 lakhRs 12.34 lakh
B21NARs 16.19 lakhRs 12.34 lakh
B22+B23NARs 16.19 lakhRs 12.34 lakh
B24+B25NARs 16.19 lakhRs 12.34 lakh
B26+B27NARs 16.19 lakhRs 12.34 lakh
B28+B29NARs 16.19 lakhRs 12.34 lakh
B30+B31NARs 16.19 lakhRs 12.34 lakh
B32+B33NARs 16.19 lakhRs 12.34 lakh
B34+B35NARs 16.19 lakhRs 12.34 lakh
B36+B37NARs 16.19 lakhRs 12.34 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHINTANKUMAR CHIMANLAL PATEL
EngineerRAJENDRAKUMAR PRAVINCHANDRA SONI

Documents filed53

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/ARAVALLI/MODASA/Others/RAA02526/260418 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)5 Sep 2020
Engineer's certificate (Form 2)5 Sep 2020
Engineer's certificate annexure5 Sep 2020
Accountant's certificate (Form 3)5 Sep 2020
Site photograph, B8+B95 Sep 2020
Site photograph, B10B+B115 Sep 2020
Site photograph, B14+B155 Sep 2020
Site photograph, B215 Sep 2020
Site photograph, B22+B235 Sep 2020
Site photograph, B24+B255 Sep 2020
Site photograph, B26+B275 Sep 2020
Site photograph, B28+B295 Sep 2020
Site photograph, B30+B315 Sep 2020
Site photograph, B32+B335 Sep 2020
Site photograph, B34+B355 Sep 2020
Site photograph, B36+B375 Sep 2020
Site photograph, B435 Sep 2020
Site photograph, B44+B455 Sep 2020
Site photograph, B48+B495 Sep 2020
Site photograph, B50+B515 Sep 2020
RERA registration certificate26 Apr 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

Keep FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Modasa17 in Aravalli

2 kmFORAM SWARNIM RESIDENCY(Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: SWARNIM CORPORATION

SWARNIM CORPORATION has 1 registration on GujRERA, including FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51. Read the full track record. See more projects on the Aravalli district page.

Frequently asked questions

What are my rights if FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51 is delayed beyond 30 Sep 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51?

The registered promoter entity is SWARNIM CORPORATION, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51?

The professionals named in the filing: Architect: CHINTANKUMAR CHIMANLAL PATEL; Engineer: RAJENDRAKUMAR PRAVINCHANDRA SONI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 TO B11,B14,B15,B21 TO B37,B43 TO B45,B48 TO B51. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FORAM SWARNIM RESIDENCY(PHASE 1) PLOT NO -B8 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.