BANDHAN ARCADE

By BANDHAN DEVELOPERS

RG-GJ-12889 · RERA PR/GJ/ARAVALLI/MODASA/Others/CAA04031/151118 · Last updated on GujRERA portal: 24 Feb 2021

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Apr 2021Possession promisedno revision filed
659 of 990Construction stages doneacross 110 buildings; furthest along: Stilt Floor, 0%
66 of 110Units unsoldnot recorded sold or booked
Jump to the 147 documents Report an error

BANDHAN ARCADE is a Commercial project by BANDHAN DEVELOPERS in Aravalli, Gujarat, registered with GujRERA as PR/GJ/ARAVALLI/MODASA/Others/CAA04031/151118 on 15 Nov 2018. Possession is promised by 15 Apr 2021. 44 of the 110 units on this registration are recorded sold or booked, and 659 of 990 construction stages are filed complete.

At a glance

Project

  • NameBANDHAN ARCADE
  • TypeCommercial
  • Location
    • BANDHAN ARCADE
    • MEGHRAJ ROAD
    • MODASA
    • Modasa
    • Aravalli
    • 383315
  • Pincode383315
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/ARAVALLI/MODASA/Others/CAA04031/151118
  • ReraGenie IDRG-GJ-12889

Builder

  • NameBANDHAN DEVELOPERS
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredNov 2018PromisedApr 2021

Key facts

Registration and timeline

  • StatusValid until 15 Apr 2021
  • Registered on15 Nov 2018
  • Promised completion15 Apr 2021
  • Revised completionNone
  • Buildings110 building records
  • Documents filed147 files

Current status

40%44 of 110 units booked
90.1%Of the estimated cost spent so far

Figures as on 24 Feb 2021, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
F79---011
F80---011
F81---011
F82---011
S1---011
S2---011
S3---011
S4---011
S5---011
S6---011
S7---011
S8---011
S9---011
S10---011
S11---011
S12---011
T1---011
T2---011
T3---011
T4---011
T5---011
T6---011
T7---011
T8---011
B1---011
B2---011
B3---011
B4---011
B5---011
B6---011
B7---011
B8---011
G1---011
G2---011
G3---011
G4---011
G5---011
G6---011
G7---011
G8---011
G9---011
G10---011
G11---011
G12---011
G12A---011
G14---011
G15---011
G16---011
G17---011
G18---011
G19---011
G20---011
G21---011
G22---011
G23---011
G24---011
G25---011
G26---011
G27---011
G28---011
G29---011
G30---011
G31---011
G32---011
G33---011
G34---011
G35---011
G36---011
G37---011
G38---011
G39---011
G40---011
G41---011
F42---011
F43---011
F44---011
F45---011
F46---011
F47---011
F48---011
F49---011
F50---011
F51---011
F52---011
F53---011
F54---011
F55---011
F56---011
F57---011
F58---011
F59---011
F60---011
F61---011
F62---011
F63---011
F64---011
F65---011
F66---011
F67---011
F68---011
F69---011
F70---011
F71---011
F72---011
F73---011
F74---011
F75---011
F76---011
F77---011
F78---011

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 24 Feb 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 110 buildings; the table lists the first 20.

659 of 990 construction stages are filed complete across 110 buildings. The stage furthest along is Stilt Floor, at 0%.

F7967%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
F8067%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
F8167%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
F8267%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
S167%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
S267%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
S367%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
S467%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
S567%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
S667%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
S756%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
S867%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
S967%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
S1067%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
S1167%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
S1267%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
T167%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
T267%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
T367%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
T467%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 24 Feb 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsNoNot applicable
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesYes0%
Emergency evacuationYes0%
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,136 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.49 cr
Cost incurredRs 4.05 cr
Spent of the estimate90.1%
BuildingWingEstimatedIncurred
G1NARs 4.08 lakhRs 3.68 lakh
G2NARs 4.08 lakhRs 3.68 lakh
G3NARs 4.08 lakhRs 3.68 lakh
G4NARs 4.08 lakhRs 3.68 lakh
G5NARs 4.08 lakhRs 3.68 lakh
G6NARs 4.08 lakhRs 3.68 lakh
G7NARs 4.08 lakhRs 3.68 lakh
G8NARs 4.08 lakhRs 3.68 lakh
G9NARs 4.08 lakhRs 3.68 lakh
G10NARs 4.08 lakhRs 3.68 lakh
G11NARs 4.08 lakhRs 3.68 lakh
G12NARs 4.08 lakhRs 3.68 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAGHAV ARVINDBHAI PATEL
EngineerPATEL DIVYAKANT AMBALAL

Documents filed147

As listed on the registration, under the names the promoter filed them with; the newest 80 of 147 are shown. The files themselves are available at source: search the registration number PR/GJ/ARAVALLI/MODASA/Others/CAA04031/151118 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)24 Feb 2021
Architect's certificate (Form 1)18 Feb 2021
Engineer's certificate (Form 2)18 Feb 2021
Engineer's certificate annexure18 Feb 2021
Site photograph, F7911 Feb 2021
Site photograph, F8011 Feb 2021
Site photograph, F8111 Feb 2021
Site photograph, F8211 Feb 2021
Site photograph, S111 Feb 2021
Site photograph, S211 Feb 2021
Site photograph, S311 Feb 2021
Site photograph, S411 Feb 2021
Site photograph, S511 Feb 2021
Site photograph, S611 Feb 2021
Site photograph, S711 Feb 2021
Site photograph, S811 Feb 2021
Site photograph, S911 Feb 2021
Site photograph, S1011 Feb 2021
Site photograph, S1111 Feb 2021
Site photograph, S1211 Feb 2021
Site photograph, T111 Feb 2021
Site photograph, T211 Feb 2021
Site photograph, T311 Feb 2021
Site photograph, T411 Feb 2021
Site photograph, T511 Feb 2021
Site photograph, T611 Feb 2021
Site photograph, T711 Feb 2021
Site photograph, T811 Feb 2021
Site photograph, B111 Feb 2021
Site photograph, B211 Feb 2021
Site photograph, B311 Feb 2021
Site photograph, B411 Feb 2021
Site photograph, B511 Feb 2021
Site photograph, B611 Feb 2021
Site photograph, B711 Feb 2021
Site photograph, B811 Feb 2021
Site photograph, G111 Feb 2021
Site photograph, G211 Feb 2021
Site photograph, G311 Feb 2021
Site photograph, G411 Feb 2021
Site photograph, G511 Feb 2021
Site photograph, G611 Feb 2021
Site photograph, G711 Feb 2021
Site photograph, G811 Feb 2021
Site photograph, G911 Feb 2021
Site photograph, G1011 Feb 2021
Site photograph, G1111 Feb 2021
Site photograph, G1211 Feb 2021
Site photograph, G12A11 Feb 2021
Site photograph, G1411 Feb 2021
Site photograph, G1511 Feb 2021
Site photograph, G1611 Feb 2021
Site photograph, G1711 Feb 2021
Site photograph, G1811 Feb 2021
Site photograph, G1911 Feb 2021
Site photograph, G2011 Feb 2021
Site photograph, G2111 Feb 2021
Site photograph, G2211 Feb 2021
Site photograph, G2311 Feb 2021
Site photograph, G2411 Feb 2021
Site photograph, G2511 Feb 2021
Site photograph, G2611 Feb 2021
Site photograph, G2711 Feb 2021
Site photograph, G2811 Feb 2021
Site photograph, G2911 Feb 2021
Site photograph, G3011 Feb 2021
Site photograph, G3111 Feb 2021
Site photograph, G3211 Feb 2021
Site photograph, G3311 Feb 2021
Site photograph, G3411 Feb 2021
Site photograph, G3511 Feb 2021
Site photograph, G3611 Feb 2021
Site photograph, G3711 Feb 2021
Site photograph, G3811 Feb 2021
Site photograph, G3911 Feb 2021
Site photograph, G4011 Feb 2021
Site photograph, G4111 Feb 2021
Site photograph, F4211 Feb 2021
Site photograph, F4311 Feb 2021
Site photograph, F4411 Feb 2021

Keep BANDHAN ARCADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Modasa17 in Aravalli

2 kmBANDHAN ARCADEOther 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 13 registered projects within 2 km.

Builder: BANDHAN DEVELOPERS

BANDHAN DEVELOPERS has 1 registration on GujRERA, including BANDHAN ARCADE. Read the full track record. See more projects on the Aravalli district page.

Frequently asked questions

What are my rights if BANDHAN ARCADE is delayed beyond 15 Apr 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of BANDHAN ARCADE?

The registered promoter entity is BANDHAN DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in BANDHAN ARCADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at BANDHAN ARCADE?

The professionals named in the filing: Architect: RAGHAV ARVINDBHAI PATEL; Engineer: PATEL DIVYAKANT AMBALAL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BANDHAN ARCADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BANDHAN ARCADE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BANDHAN ARCADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.