EMPIRE-PRIDE

By M/S MANUR REALTORS

RG-KA-57992 · RERA PRM/KA/RERA/1263/419/PR/220923/006292 · Last updated on RERA Karnataka portal: 11 Sep 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jul 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 111 documents Report an error

EMPIRE-PRIDE is a Residential/Group Housing project by M/S MANUR REALTORS in Kalaburagi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1263/419/PR/220923/006292 on 22 Sep 2023. Possession is promised by 30 Jul 2024.

At a glance

Project

  • NameEMPIRE-PRIDE
  • TypeResidential/Group Housing
  • Location
    • Kalaburagi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1263/419/PR/220923/006292
  • ReraGenie IDRG-KA-57992

Builder

  • NameM/S MANUR REALTORS
  • Entity typePartnership Firm
  • GSTIN29ABTFM0544P1ZF
  • Authorized SignatoryFAROOQ AHMED S/O BABUMIYAN MANUR IMAMSAB

Key dates

this monthRegisteredSep 2023PromisedJul 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on22 Sep 2023
  • Promised completion30 Jul 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed111 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EMPIRE PRIDE---20020

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 11 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 11 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
SYED MASTAN S/O SYED ABDUL GAFOOR--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.75 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 2.75 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR MD ASIM ALI
EngineerER MD WAJEED ALI
Chartered AccountantMOHAMMED KHAJA MOINUDDIN

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed111

As listed on the registration, under the names the promoter filed them with; the newest 80 of 111 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1263/419/PR/220923/006292 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Uploaded Single plot layoutFile: Single plot layout.pdf11 Sep 2023
Uploaded Single plot layout OrderFile: Single plot layout Order.pdf11 Sep 2023
Uploaded Sectional drawings and elevations signed copy from Zonal Authority KalaburagiFile: Sectional drawings and elevations signed copy from Zonal Authority Kalaburagi.pdf11 Sep 2023
Uploaded profit and loss account and balance sheet 2020-21 2021-22 & 2022-23 with CA UDINFile: Profit and loss account and balance sheet 2020-21 2021-22 & 2022-23 with CA UDIN.pdf28 Aug 2023
Declaration regarding sources of funds to complete the projectFile: Declaration Regarding sources of funds to complete the project.pdf28 Aug 2023
Uploaded EC with all transactionsFile: EC with all transactions.pdf28 Aug 2023
Uploaded approved plan of the projectFile: Approved Building Plan.pdf28 Aug 2023
Uploaded Single plot layoutFile: SINGLE LAYOUT plan.pdf28 Aug 2023
Uploaded Single plot layout OrderFile: Single plot layout Order.pdf28 Aug 2023
Uploaded village map showing the proposed siteFile: Village Map.jpg28 Aug 2023
Uploaded sanctioned drawings Floor plans sectional drawings and elevations. clear copyFile: Sanctioned drawings Floor plans sectional drawings and elevations.pdf28 Aug 2023
Declaration profit and loss account and balance sheet 2020-21 , 2021-22 & 2022-23 with CA UDINFile: Declaration profit and loss account and balance sheet 2020-21 , 2021-22 & 2022-23 with CA 3 Aug 2023
Declaration profit and loss account and balance sheet 2020-21 , 2021-22 & 2022-23 with CA UDINFile: Declaration profit and loss account and balance sheet 2020-21 , 2021-22 & 2022-23 with CA 3 Aug 2023
Declaration Regarding sources of funds to complete the projectFile: Declaration Regarding sources of funds to complete the project.pdf3 Aug 2023
Authorization certificate of mannur realtorsFile: Authorization certificate of mannur realtors.pdf3 Aug 2023
GST CertificateFile: GST Registration Certificate.pdf3 Aug 2023
ECFile: EC.pdf3 Aug 2023
Latest KhataFile: Latest Khata.pdf3 Aug 2023
Advocate search report neededFile: Advocate search report.pdf3 Aug 2023
village map showing the proposed siteFile: village map showing the proposed site.pdf3 Aug 2023
sanctioned drawings Floor plans, sectional drawings and elevationsFile: sanctioned drawings Floor plans, sectional drawings and elevations.pdf3 Aug 2023
Amenities details properly as per the sanctioned drawingFile: Amenities details properly as per the sanctioned drawing.pdf3 Aug 2023
Form-6, Engineering certificate in the prescribed formatFile: Form-6, Engineering certificate in the prescribed format.pdf3 Aug 2023
Land cost as per guidance value calculation sheetFile: Land Guidance Value.pdf3 Aug 2023
Declaration regarding fee receipt paid towards water supply and power supplyFile: Declaration Regarding Water Board NOC & GESCOM (POWER SUPPLY) NOC's.pdf3 Aug 2023
source of water supply to the project along with the supporting documentsFile: source of water supply to the project along with the supporting documents.pdf3 Aug 2023
STP, Septic Tank, Soak pit and sewer line drawingFile: STP, Septic Tank, Soak pit and sewer line drawing.pdf3 Aug 2023
section 3 of 1 notarized affidavitFile: section 3 of 1 notarized affidavit.pdf3 Aug 2023
Declaration regarding Certificate by structural design consultantFile: Declaration regarding Certificate by structural design consultant.pdf3 Aug 2023
brief estimated cost of construction for civil works certified by the registered Civil EngineerFile: brief estimated cost of construction for civil works certified by the registered Civil Eng3 Aug 2023
Registration CertificateFile: Firm Registration Certificate.pdf-
Partnership DeedFile: Partnership Deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Certificate issued by CA Form 1.pdf-
Certificate issued by Architect Form 2File: Certificate issued by Architect Form 2.pdf-
Certificate issued by Engineer Form 3File: Certificate issued by Engineer Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation affidavit.pdf-
Certificate from Chartered AccountFile: Certificate from CA.pdf-
Balance Sheet 2021 - 2022File: Balance Sheet 2021-22.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet 2021-22.pdf-
Balance Sheet 2019 - 2020File: Balance Sheet 2020-21.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Profit & Loss 2021-22.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Profit & Loss 2021-22.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profit & Loss 2020-21.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ACK 2022-23.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ACK 2021-22.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ACK 2020-21.pdf-
Approved City coorporation permission renewed-
Gescom NOC-
Water Board NOC-
Approved Building Plan-
Approved Building Plan-
Project Specification-
Approved Building Plan-
CDP Map-
JDA-
GPA-
Proforma of Agreement for Sale-
Proforma Allotment Letter-
Declaration Regarding Brochure-
Declaration Form B Notirized Affidavit-
JD AFFIDAVIT CUM DECLARATION-
Gescom NOC-
Water Board NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

How this compares with Kalaburagi

32%of Kalaburagi projects moved their completion datethis one has not
0%of Kalaburagi registrations are shown as withdrawn or revokedthis one is not

Computed across the 210+ Kalaburagi projects on ReraGenie, from their own filings.

Keep EMPIRE-PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Kalaburagi210+ in Kalaburagi

Builder: M/S MANUR REALTORS

M/S MANUR REALTORS has 1 registration on RERA Karnataka, including EMPIRE-PRIDE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Kalaburagi district page.

Frequently asked questions

What are my rights if EMPIRE-PRIDE is delayed beyond 30 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of EMPIRE-PRIDE?

The registered promoter entity is M/S MANUR REALTORS, a partnership firm as per the filing. Its GSTIN 29ABTFM0544P1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in EMPIRE-PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at EMPIRE-PRIDE?

The professionals named in the filing: Architect: MR MD ASIM ALI; Engineer: ER MD WAJEED ALI; Chartered Accountant: MOHAMMED KHAJA MOINUDDIN. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EMPIRE-PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EMPIRE-PRIDE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EMPIRE-PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.