ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / EMINENCE

Valid until 30 Apr 2027 Residential/Group Housing project

EMINENCE

By NJP INFRA LLP

RG-GJ-79046 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA10198/160522 · Last updated on GujRERA portal: 24 Oct 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2027Possession promisedno revision filed
14 of 30Construction stages doneacross 3 buildings; furthest along: Internal walls, 92%
5 of 33Units unsoldnot recorded sold or booked
Jump to the 38 documents Report an error

EMINENCE is a Residential/Group Housing project by NJP INFRA LLP in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA10198/160522 on 16 May 2022. Possession is promised by 30 Apr 2027. 28 of the 33 units on this registration are recorded sold or booked, and 14 of 30 construction stages are filed complete.

At a glance

Project

  • NameEMINENCE
  • TypeResidential/Group Housing
  • Location
    • Block Survey No-68 plus 74/1
    • City Survey No-2488/B
    • T P Scheme No 60
    • Final Plot No-70
    • Gotri Sevasi Road
    • New Alkapuri
    • Vadodara
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA10198/160522
  • ReraGenie IDRG-GJ-79046

Builder

  • NameNJP INFRA LLP
  • Entity typeLIMITED LIABILITY PARTNERSHIP FIRM

Key dates

this monthRegisteredMay 2022PromisedApr 2027

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2027
  • Registered on16 May 2022
  • Promised completion30 Apr 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed38 files

Current status

85%28 of 33 units booked
67.5%Of the estimated cost spent so far

Figures as on 24 Oct 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---11011
B---11011
C---11011

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 24 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 30 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 92%.

A87%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor91%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats92%
Sanitary fittings within the flats64%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks83%
External plumbing and external plaster, elevation, completion of terraces with waterproofing45%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing91%
B78%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor82%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats55%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing30%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing18%
C55%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor18%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats17%
Sanitary fittings within the flats27%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks42%
External plumbing and external plaster, elevation, completion of terraces with waterproofing30%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing18%

Progress on shared amenities23

As on 24 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsNoNot applicable
Water supplyYes65%
Sewerage (chamber, lines, septic tank, STP)Yes60%
Storm water drainsYes35%
Landscaping and tree plantingYes0%
Street lightingYes15%
Community buildingsYes30%
Treatment and disposal of sewage and sullage waterYes30%
Solid waste management and disposalYes35%
Water conservation, rain water harvestingYes45%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes5%
Electrical meter room, sub-station, receiving stationYes5%
Fire fightingYes20%
Drinking water facilitiesYes35%
Emergency evacuationYes5%
Use of renewable energyNoNot applicable
SecurityYes15%
Letter boxYes0%
Compound wallYes15%
Plinth protectionYes0%
Water tankYes0%
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,750 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 45.00 cr
Cost incurredRs 30.36 cr
Spent of the estimate67.46%
BuildingWingEstimatedIncurred
ANARs 15.00 crRs 10.86 cr
BNARs 15.00 crRs 10.10 cr
CNARs 15.00 crRs 9.39 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhavika Patel
EngineerAASHUTOSH DESAI

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA10198/160522 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)24 Oct 2024
Engineer's certificate annexure24 Oct 2024
RERA registration certificate16 May 2022
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

85%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep EMINENCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadodara2,900+ in Vadodara

2 kmEMINENCEOther 258Dot size: filed unitsN

Filed coordinates, straight-line distance. 258 registered projects within 2 km.

Builder: NJP INFRA LLP

NJP INFRA LLP has 1 registration on GujRERA, including EMINENCE. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if EMINENCE is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of EMINENCE?

The registered promoter entity is NJP INFRA LLP, a limited liability partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in EMINENCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at EMINENCE?

The professionals named in the filing: Architect: Bhavika Patel; Engineer: AASHUTOSH DESAI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EMINENCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EMINENCE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EMINENCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.