ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / ELEGANT AURA

Registration approved No litigation declared Residential/Group Housing project

ELEGANT AURA

By ELEGANT BUILDERS AND DEVELOPERS

RG-KA-34196 · RERA PRM/KA/RERA/1251/309/PR/100125/007379 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2027Possession promisedno revision filed
5 of 17Construction stages donefurthest along: RCC or MS Framed structure, 75%
34 of 86Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 187 documents Report an error

ELEGANT AURA is a Residential/Group Housing project by ELEGANT BUILDERS AND DEVELOPERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/100125/007379 on 10 Jan 2025. Possession is promised by 30 Jun 2027. 52 of the 86 units on this registration are recorded sold or booked, and 5 of 17 construction stages are filed complete.

At a glance

Project

  • NameELEGANT AURA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
    • 560077
  • Pincode560077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/100125/007379
  • ReraGenie IDRG-KA-34196

Builder

  • NameELEGANT BUILDERS AND DEVELOPERS
  • Entity typePartnership Firm
  • GSTIN29AADFE0590L2Z6
  • Authorized SignatoryS JAYANTH
  • Other registrations7 more →
  • Declared earlier projects7 →

Key dates

this monthRegisteredJan 2025PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on10 Jan 2025
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed187 files

Current status

60%52 of 86 units booked
10.2%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK - A---41041
BLOCK - B---45045

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 17 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 75%.

Building: 49% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure75%
Masonry Construction75%
Plastering inside , outside & Ceiling55%
Joinery: Doors, Windows, Ventilators etc25%
Basic work of Water supply, Sanitary and Electrification30%
Dadoing, Skirting, Flooring, Tiles work (All types)30%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting15%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)25%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes30%
Sewage and Drainage SystemYes15%
Water conservation/rain water harvesting/recharge of ground waterYes30%
Energy managementYes30%
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes30%
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes15%
Storm water drainsNoNot applicable
Use of renewable energyYes15%
Sewage Treatment Plant (STP)Yes15%
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes30%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes30%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes30%
GymNoNot applicable
ParksNoNot applicable
Power BackupYes30%
Piped GasNoNot applicable
Water and SanitationYes30%
Air ConditioningNoNot applicable
StaircasesYes30%
LiftsYes30%
Corridor/LobbiesYes30%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes30%
BasementYes30%
TerraceYes30%
Outer WallYes30%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes30%
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,913 sq m
Named landowners1
LandownerVillageDistrict
RANJEET KANUNGA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 55.61 cr
Cost incurredRs 5.69 cr
Spent of the estimate10.23%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 44.66 crRs 4.70 cr
On-site expenditure-Consultants FeesRs 4.79 crRs 36.29 lakh
Payment of feesRs 2.98 cr-
On-site expenditure-Salaries of workersRs 2.08 crRs 37.49 lakh
On-site expenditure-Site OverheadRs 1.10 crRs 25.09 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSARAVANAN RAJENDRAN
EngineerCHETHAN KUMAR R
Chartered AccountantN K SATISH

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed187

As listed on the registration, under the names the promoter filed them with; the newest 80 of 187 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/100125/007379 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 7) Form -4, Chartered Accountant (QU) - July 2026 - Sep 2026.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: 7) Aura - Form-5, Architect (QU) - July 2026 - Sep 2026.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: 7) Aura- Form -6, Engineer (QU) - July 2026 to Sep 2026.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 6) Form -4, Chartered Accountant (QU) - Apr 2026 - June 2026.pdf14 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: 6) Aura - Form-5, Architect (QU) - Apr 2026 - June 2026.pdf14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: 6) Aura- Form -6, Engineer (QU) - Apr 2026 to June 2026.pdf14 Jul 2026
Q1 2026-27 Water supply and sewage board14 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 5) Aura- Form -4, Chartered Accountant (QU) - Jan 2026 - Mar 2026.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: 5) Aura - Form-5, Architect (QU) - Jan 2026 - Mar 2026.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: 5) Aura- Form -6, Engineer (QU) - Jan 2026 to Mar 2026.pdf14 Apr 2026
Q4 2025-26 Water supply and sewage board14 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 4) Form -4, Chartered Accountant (QU) - Oct 2025 - Dec 2025.pdf15 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: 4) Aura - Form-5, Architect (QU) -Oct 2025 - Dec 2025.pdf15 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 4) Aura- Form -6, Engineer (QU) - Oct 2025 to Dec 2025.pdf15 Jan 2026
Q3 2025-26 Water supply and sewage board15 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Jan 2026
FY 2021-22 - BS - Pramoters Signed with UDINFile: FY 2021-22 - BS - Pramoters Signed with UDIN.pdf7 Jan 2025
FY 2021-22 - ITR - Pramoters SignedFile: FY 2021-22 - ITR - Pramoters Signed.pdf7 Jan 2025
FY 2021-22 - P and L - Pramoters Signed - With UDINFile: FY 2021-22 - P L - Pramoters Signed - With UDIN.pdf7 Jan 2025
FY 2021-22 Full Working Pramoters Signed - With UDINFile: FY 2021-22 Full Working With Schedule1.pdf7 Jan 2025
FY 2022-23 - 3CB and 3CD - Pramoters SignedFile: FY 2022-23 - 3CB and 3CD - Pramoters Signed.pdf7 Jan 2025
FY 2022-23 - BS with UDIN - Pramoters SignedFile: FY 2022-23 - BS with UDIN - Pramoters Signed.pdf7 Jan 2025
FY 2022-23 - ITR - Pramoters SignedFile: FY 2022-23 - ITR - Pramoters Signed.pdf7 Jan 2025
FY 2022-23 - P and L with UDIN - Pramoters SignedFile: FY 2022-23 - P and L with UDIN - Pramoters Signed.pdf7 Jan 2025
FY 2022-23 Full Working With Schedule -Pramoters SignedFile: FY 2022-23 Full Working With Schedule -Pramoters Signed.pdf7 Jan 2025
FY 2023-24 - 3CB and 3CD - Pramoters SignedFile: FY 2023-24 - 3CB and 3CD - Pramoters Signed.pdf7 Jan 2025
FY 2023-24 - BS with UDIN - Pramoters SignedFile: FY 2023-24 - BS with UDIN - Pramoters Signed.pdf7 Jan 2025
FY 2023-24 - ITR - Pramoters SignedFile: FY 2023-24 - ITR - Pramoters Signed.pdf7 Jan 2025
FY 2023-24 - P and L with UDIN - Pramoters SignedFile: FY 2023-24 - P and L with UDIN - Pramoters Signed.pdf7 Jan 2025
FY 2023-24 Full Working With Schedule Pramoters SignedFile: FY 2023-24 Full Working With Schedule Pramoters Signed.pdf7 Jan 2025
sources of funds to complete the projectFile: Source of Fund.pdf7 Jan 2025
latest dated self-attested copy of the Engineer's license certificate.File: Engineer License - Mr Chethan Kumar Self Signed.pdf7 Jan 2025
STP design drawing Certified copyFile: STP design drawing Certified copy.pdf7 Jan 2025
BESCOM NOC Applied CopyFile: Letter for BESCOM NOC and Acknoledgement.pdf7 Jan 2025
profit and loss account 2021-22File: FY 2021-22 - PL.pdf2 Jan 2025
balance sheet 2021-22File: FY 2021-22 - BS.pdf2 Jan 2025
ITR 2021-22File: FY 2021-22 - ITR.pdf2 Jan 2025
schedule 2021-22File: FY 2021-22 - Full With Schedued.pdf2 Jan 2025
Working 2021-22File: FY 2021-22 - Working.pdf2 Jan 2025
profit and loss account 2022-23File: FY 2022-23 - PL.pdf2 Jan 2025
balance sheet with UDIN 2022-23File: FY 2022-23 - BS With UDIN.pdf2 Jan 2025
FY 2022-23 - Full With ScheduedFile: FY 2022-23 - Full With Schedued.pdf2 Jan 2025
FY 2022-23 - ITRFile: FY 2022-23 - ITR.pdf2 Jan 2025
FY 2023-24 - 3CD& 3CBFile: FY 2023-24 - 3CD& 3CB.pdf2 Jan 2025
FY 2023-24 - BS With UDINFile: FY 2023-24 - BS With UDIN.pdf2 Jan 2025
FY 2023-24 - Full With ScheduedFile: FY 2023-24 - Full With Schedued.pdf2 Jan 2025
FY 2023-24 - ITRFile: FY 2023-24 - ITR.pdf2 Jan 2025
FY 2023-24 - PLFile: FY 2023-24 - PL.pdf2 Jan 2025
CA Registration certificate- self attestedFile: CA Registration certificate-1.pdf2 Jan 2025
sources of funds to complete With supporting documentsFile: Sources of Fund With Supporting.pdf2 Jan 2025
GST certificate - FirmFile: Elegant Builders & Developers - GST.pdf2 Jan 2025
Clarification regarding sales mentioned in financial statementsFile: Clarification regarding Sales.pdf2 Jan 2025
for this Project no unsecured loan or borrowing declarationFile: Clarification regaring Unsecured Loan.pdf2 Jan 2025
sale is NOt for this Project & sale clarificationFile: Clarification regarding Sales.pdf2 Jan 2025
Partner - Manjunath S N Self Attested KYCFile: Manjunath S N Self Attested KYC.pdf2 Jan 2025
Partner - Rajesh S Self Attested KYCFile: Rajesh S Self Attested KYC.pdf2 Jan 2025
Partner - S JAYANTH Self Attested KYCFile: S JAYANTH Self Attested KYC.pdf2 Jan 2025
Partner - Subramani M Self Attested KYCFile: Subramani M Self Attested KYC.pdf2 Jan 2025
Partner - Prabha V Self Attested KYCFile: Prabha V Self Attested KYC.pdf2 Jan 2025
JDA between land owner and promoter - Registered docFile: Authenticated Registered JDA Copy.pdf2 Jan 2025
notarized affidavit cleared litigations /non-litigationFile: Notarized Affidavit for 3(1) Voliation & No Litigation.pdf2 Jan 2025
Self-attested copy - Engineer's license certificateFile: Self Attested Engineer License Chethan Kumar.pdf2 Jan 2025
STP design drawing certified by the concerned EngineerFile: Elegant AURA STP Layout.pdf2 Jan 2025
BWSSB NOC fee receipt.File: BWSSB and Receipt & NOC.pdf2 Jan 2025
BESCOM NOC DeclarationFile: BESCOM NOC Declaration.pdf2 Jan 2025
FY 2021-22 - BSFile: FY 2021-22 - BS.pdf17 Dec 2024
FY 2021-22 - ITRFile: FY 2021-22 - ITR.pdf17 Dec 2024
FY 2021-22 - PLFile: FY 2021-22 - PL.pdf17 Dec 2024
FY 2021-22 - Full With ScheduedFile: FY 2021-22 - Full With Schedued.pdf17 Dec 2024
3CB & 3CD 2021-22File: 3CB & 3CD 2021-22.pdf17 Dec 2024
FY 2022-23 - BS With UDINFile: FY 2022-23 - BS With UDIN.pdf17 Dec 2024
FY 2022-23 - ITRFile: FY 2022-23 - ITR.pdf17 Dec 2024
FY 2022-23 - PL with UDINFile: FY 2022-23 - PL with UDIN.pdf17 Dec 2024
FY 2022-23 - Full With ScheduedFile: FY 2022-23 - Full With Schedued.pdf17 Dec 2024
3CB & 3CD 2022-23File: 3CB & 3CD 2022-23.pdf17 Dec 2024
FY 2023-24 - BS With UDINFile: FY 2023-24 - BS With UDIN.pdf17 Dec 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 not delivered by the promised date1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
ELEGANT HERMITAGEKHATHA NO : 368, SY NO 3/2C, 17/2B, 17/1I2,3/3A2 & 3/3C2, GANAKALLU VILLAGE KENGERI HOBLI, BANGALORE SOUTH TALUK , WARD NO - 198OngoingMar 2026Not delivered
ELEGANT TERRACESV Legacy Rd., Banashankari 3rd Stage, HosakerehalliOngoingSep 2024Not delivered
ELEGANT EXQUISITESY NO 13/1 AND SY NO 12/1/A, SITUATED AT PATTANAGERE VILLAGECompleted-No date filed

How this compares with Bengaluru Urban

60%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep ELEGANT AURA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmELEGANT AURAOther 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: ELEGANT BUILDERS AND DEVELOPERS

ELEGANT BUILDERS AND DEVELOPERS has 8 registrations on RERA Karnataka, including ELEGANT AURA and ELEGANT EXOTICA. Its filings declare 7 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if ELEGANT AURA is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ELEGANT AURA?

The registered promoter entity is ELEGANT BUILDERS AND DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AADFE0590L2Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ELEGANT AURA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ELEGANT AURA?

The professionals named in the filing: Architect: SARAVANAN RAJENDRAN; Engineer: CHETHAN KUMAR R; Chartered Accountant: N K SATISH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ELEGANT AURA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ELEGANT AURA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ELEGANT AURA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.