Home / Browse projects / Bengaluru Urban, Karnataka / ELEGANT AURA
ELEGANT AURA
By ELEGANT BUILDERS AND DEVELOPERS
RG-KA-34196 · RERA PRM/KA/RERA/1251/309/PR/100125/007379 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
ELEGANT AURA is a Residential/Group Housing project by ELEGANT BUILDERS AND DEVELOPERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/100125/007379 on 10 Jan 2025. Possession is promised by 30 Jun 2027. 52 of the 86 units on this registration are recorded sold or booked, and 5 of 17 construction stages are filed complete.
At a glance
Project
- NameELEGANT AURA
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 560077
- Pincode560077
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/100125/007379
- ReraGenie IDRG-KA-34196
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on10 Jan 2025
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings2 building records
- Documents filed187 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLOCK - A | - | - | - | 41 | 0 | 41 |
| BLOCK - B | - | - | - | 45 | 0 | 45 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 17 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 75%.
Building: 49% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 75% |
| Masonry Construction | 75% |
| Plastering inside , outside & Ceiling | 55% |
| Joinery: Doors, Windows, Ventilators etc | 25% |
| Basic work of Water supply, Sanitary and Electrification | 30% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 30% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 15% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 25% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 30% |
| Sewage and Drainage System | Yes | 15% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 30% |
| Energy management | Yes | 30% |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 30% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 15% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | Yes | 15% |
| Sewage Treatment Plant (STP) | Yes | 15% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 30% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 30% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 30% |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 30% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 30% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 30% |
| Lifts | Yes | 30% |
| Corridor/Lobbies | Yes | 30% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 30% |
| Basement | Yes | 30% |
| Terrace | Yes | 30% |
| Outer Wall | Yes | 30% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 30% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RANJEET KANUNGA | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 44.66 cr | Rs 4.70 cr |
| On-site expenditure-Consultants Fees | Rs 4.79 cr | Rs 36.29 lakh |
| Payment of fees | Rs 2.98 cr | - |
| On-site expenditure-Salaries of workers | Rs 2.08 cr | Rs 37.49 lakh |
| On-site expenditure-Site Overhead | Rs 1.10 cr | Rs 25.09 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SARAVANAN RAJENDRAN |
| Engineer | CHETHAN KUMAR R |
| Chartered Accountant | N K SATISH |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed187
As listed on the registration, under the names the promoter filed them with; the newest 80 of 187 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/100125/007379 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 7) Form -4, Chartered Accountant (QU) - July 2026 - Sep 2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: 7) Aura - Form-5, Architect (QU) - July 2026 - Sep 2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: 7) Aura- Form -6, Engineer (QU) - July 2026 to Sep 2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 6) Form -4, Chartered Accountant (QU) - Apr 2026 - June 2026.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: 6) Aura - Form-5, Architect (QU) - Apr 2026 - June 2026.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: 6) Aura- Form -6, Engineer (QU) - Apr 2026 to June 2026.pdf | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 5) Aura- Form -4, Chartered Accountant (QU) - Jan 2026 - Mar 2026.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: 5) Aura - Form-5, Architect (QU) - Jan 2026 - Mar 2026.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: 5) Aura- Form -6, Engineer (QU) - Jan 2026 to Mar 2026.pdf | 14 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 14 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 4) Form -4, Chartered Accountant (QU) - Oct 2025 - Dec 2025.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: 4) Aura - Form-5, Architect (QU) -Oct 2025 - Dec 2025.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 4) Aura- Form -6, Engineer (QU) - Oct 2025 to Dec 2025.pdf | 15 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 15 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jan 2026 |
| FY 2021-22 - BS - Pramoters Signed with UDINFile: FY 2021-22 - BS - Pramoters Signed with UDIN.pdf | 7 Jan 2025 |
| FY 2021-22 - ITR - Pramoters SignedFile: FY 2021-22 - ITR - Pramoters Signed.pdf | 7 Jan 2025 |
| FY 2021-22 - P and L - Pramoters Signed - With UDINFile: FY 2021-22 - P L - Pramoters Signed - With UDIN.pdf | 7 Jan 2025 |
| FY 2021-22 Full Working Pramoters Signed - With UDINFile: FY 2021-22 Full Working With Schedule1.pdf | 7 Jan 2025 |
| FY 2022-23 - 3CB and 3CD - Pramoters SignedFile: FY 2022-23 - 3CB and 3CD - Pramoters Signed.pdf | 7 Jan 2025 |
| FY 2022-23 - BS with UDIN - Pramoters SignedFile: FY 2022-23 - BS with UDIN - Pramoters Signed.pdf | 7 Jan 2025 |
| FY 2022-23 - ITR - Pramoters SignedFile: FY 2022-23 - ITR - Pramoters Signed.pdf | 7 Jan 2025 |
| FY 2022-23 - P and L with UDIN - Pramoters SignedFile: FY 2022-23 - P and L with UDIN - Pramoters Signed.pdf | 7 Jan 2025 |
| FY 2022-23 Full Working With Schedule -Pramoters SignedFile: FY 2022-23 Full Working With Schedule -Pramoters Signed.pdf | 7 Jan 2025 |
| FY 2023-24 - 3CB and 3CD - Pramoters SignedFile: FY 2023-24 - 3CB and 3CD - Pramoters Signed.pdf | 7 Jan 2025 |
| FY 2023-24 - BS with UDIN - Pramoters SignedFile: FY 2023-24 - BS with UDIN - Pramoters Signed.pdf | 7 Jan 2025 |
| FY 2023-24 - ITR - Pramoters SignedFile: FY 2023-24 - ITR - Pramoters Signed.pdf | 7 Jan 2025 |
| FY 2023-24 - P and L with UDIN - Pramoters SignedFile: FY 2023-24 - P and L with UDIN - Pramoters Signed.pdf | 7 Jan 2025 |
| FY 2023-24 Full Working With Schedule Pramoters SignedFile: FY 2023-24 Full Working With Schedule Pramoters Signed.pdf | 7 Jan 2025 |
| sources of funds to complete the projectFile: Source of Fund.pdf | 7 Jan 2025 |
| latest dated self-attested copy of the Engineer's license certificate.File: Engineer License - Mr Chethan Kumar Self Signed.pdf | 7 Jan 2025 |
| STP design drawing Certified copyFile: STP design drawing Certified copy.pdf | 7 Jan 2025 |
| BESCOM NOC Applied CopyFile: Letter for BESCOM NOC and Acknoledgement.pdf | 7 Jan 2025 |
| profit and loss account 2021-22File: FY 2021-22 - PL.pdf | 2 Jan 2025 |
| balance sheet 2021-22File: FY 2021-22 - BS.pdf | 2 Jan 2025 |
| ITR 2021-22File: FY 2021-22 - ITR.pdf | 2 Jan 2025 |
| schedule 2021-22File: FY 2021-22 - Full With Schedued.pdf | 2 Jan 2025 |
| Working 2021-22File: FY 2021-22 - Working.pdf | 2 Jan 2025 |
| profit and loss account 2022-23File: FY 2022-23 - PL.pdf | 2 Jan 2025 |
| balance sheet with UDIN 2022-23File: FY 2022-23 - BS With UDIN.pdf | 2 Jan 2025 |
| FY 2022-23 - Full With ScheduedFile: FY 2022-23 - Full With Schedued.pdf | 2 Jan 2025 |
| FY 2022-23 - ITRFile: FY 2022-23 - ITR.pdf | 2 Jan 2025 |
| FY 2023-24 - 3CD& 3CBFile: FY 2023-24 - 3CD& 3CB.pdf | 2 Jan 2025 |
| FY 2023-24 - BS With UDINFile: FY 2023-24 - BS With UDIN.pdf | 2 Jan 2025 |
| FY 2023-24 - Full With ScheduedFile: FY 2023-24 - Full With Schedued.pdf | 2 Jan 2025 |
| FY 2023-24 - ITRFile: FY 2023-24 - ITR.pdf | 2 Jan 2025 |
| FY 2023-24 - PLFile: FY 2023-24 - PL.pdf | 2 Jan 2025 |
| CA Registration certificate- self attestedFile: CA Registration certificate-1.pdf | 2 Jan 2025 |
| sources of funds to complete With supporting documentsFile: Sources of Fund With Supporting.pdf | 2 Jan 2025 |
| GST certificate - FirmFile: Elegant Builders & Developers - GST.pdf | 2 Jan 2025 |
| Clarification regarding sales mentioned in financial statementsFile: Clarification regarding Sales.pdf | 2 Jan 2025 |
| for this Project no unsecured loan or borrowing declarationFile: Clarification regaring Unsecured Loan.pdf | 2 Jan 2025 |
| sale is NOt for this Project & sale clarificationFile: Clarification regarding Sales.pdf | 2 Jan 2025 |
| Partner - Manjunath S N Self Attested KYCFile: Manjunath S N Self Attested KYC.pdf | 2 Jan 2025 |
| Partner - Rajesh S Self Attested KYCFile: Rajesh S Self Attested KYC.pdf | 2 Jan 2025 |
| Partner - S JAYANTH Self Attested KYCFile: S JAYANTH Self Attested KYC.pdf | 2 Jan 2025 |
| Partner - Subramani M Self Attested KYCFile: Subramani M Self Attested KYC.pdf | 2 Jan 2025 |
| Partner - Prabha V Self Attested KYCFile: Prabha V Self Attested KYC.pdf | 2 Jan 2025 |
| JDA between land owner and promoter - Registered docFile: Authenticated Registered JDA Copy.pdf | 2 Jan 2025 |
| notarized affidavit cleared litigations /non-litigationFile: Notarized Affidavit for 3(1) Voliation & No Litigation.pdf | 2 Jan 2025 |
| Self-attested copy - Engineer's license certificateFile: Self Attested Engineer License Chethan Kumar.pdf | 2 Jan 2025 |
| STP design drawing certified by the concerned EngineerFile: Elegant AURA STP Layout.pdf | 2 Jan 2025 |
| BWSSB NOC fee receipt.File: BWSSB and Receipt & NOC.pdf | 2 Jan 2025 |
| BESCOM NOC DeclarationFile: BESCOM NOC Declaration.pdf | 2 Jan 2025 |
| FY 2021-22 - BSFile: FY 2021-22 - BS.pdf | 17 Dec 2024 |
| FY 2021-22 - ITRFile: FY 2021-22 - ITR.pdf | 17 Dec 2024 |
| FY 2021-22 - PLFile: FY 2021-22 - PL.pdf | 17 Dec 2024 |
| FY 2021-22 - Full With ScheduedFile: FY 2021-22 - Full With Schedued.pdf | 17 Dec 2024 |
| 3CB & 3CD 2021-22File: 3CB & 3CD 2021-22.pdf | 17 Dec 2024 |
| FY 2022-23 - BS With UDINFile: FY 2022-23 - BS With UDIN.pdf | 17 Dec 2024 |
| FY 2022-23 - ITRFile: FY 2022-23 - ITR.pdf | 17 Dec 2024 |
| FY 2022-23 - PL with UDINFile: FY 2022-23 - PL with UDIN.pdf | 17 Dec 2024 |
| FY 2022-23 - Full With ScheduedFile: FY 2022-23 - Full With Schedued.pdf | 17 Dec 2024 |
| 3CB & 3CD 2022-23File: 3CB & 3CD 2022-23.pdf | 17 Dec 2024 |
| FY 2023-24 - BS With UDINFile: FY 2023-24 - BS With UDIN.pdf | 17 Dec 2024 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| ELEGANT HERMITAGE | KHATHA NO : 368, SY NO 3/2C, 17/2B, 17/1I2,3/3A2 & 3/3C2, GANAKALLU VILLAGE KENGERI HOBLI, BANGALORE SOUTH TALUK , WARD NO - 198 | Ongoing | Mar 2026 | Not delivered |
| ELEGANT TERRACES | V Legacy Rd., Banashankari 3rd Stage, Hosakerehalli | Ongoing | Sep 2024 | Not delivered |
| ELEGANT EXQUISITE | SY NO 13/1 AND SY NO 12/1/A, SITUATED AT PATTANAGERE VILLAGE | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep ELEGANT AURA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 48 registered projects within 2 km.
NAVA VRUKSHA
NAVA JYOTHI SHELTERS PRIVATE LIMITED
POULOMI FLORIQUE
POULOMI FLORIQUE LLP
Mirabelle
G Corp Homes Private Limited
DNR PARKLINK PHASE 2
DNR CORPORATION PVT LTD
NAVA SKANDA BELLAVITA
NAVA SKANDA PROJECTS
DNR PARKLINK PHASE 1
DNR CORPORATION PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: ELEGANT BUILDERS AND DEVELOPERS
ELEGANT BUILDERS AND DEVELOPERS has 8 registrations on RERA Karnataka, including ELEGANT AURA and ELEGANT EXOTICA. Its filings declare 7 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if ELEGANT AURA is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of ELEGANT AURA?
The registered promoter entity is ELEGANT BUILDERS AND DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AADFE0590L2Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in ELEGANT AURA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at ELEGANT AURA?
The professionals named in the filing: Architect: SARAVANAN RAJENDRAN; Engineer: CHETHAN KUMAR R; Chartered Accountant: N K SATISH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ELEGANT AURA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback