ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / EARTH EUPHORIA

Valid until 30 Dec 2027 Mixed Development project

EARTH EUPHORIA

By EARTH EUPHORIA INFRA LLP

RG-GJ-66057 · RERA PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/MAA09402/A1M/080824/311226 · Last updated on GujRERA portal: 18 Jul 2024

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months

Clear

  • Nothing verified clear yet
Dec 2027Possession promisedmoved 12 months from the original
27 of 54Construction stages doneacross 6 buildings; furthest along: Stilt Floor, 42%
128 of 230Units unsoldnot recorded sold or booked
Jump to the 43 documents Report an error

EARTH EUPHORIA is a Mixed Development project by EARTH EUPHORIA INFRA LLP in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/MAA09402/A1M/080824/311226 on 1 Dec 2021. Possession is promised by 30 Dec 2027. The completion date has moved by 12 months from the original filing. 102 of the 230 units on this registration are recorded sold or booked, and 27 of 54 construction stages are filed complete.

At a glance

Project

  • NameEARTH EUPHORIA
  • TypeMixed Development
  • Location
    • Survey No. 108
    • Near VUDA Circle
    • VIP ROAD
    • Moje: Nagarwada
    • Karelibaug
    • NAGARWADA
    • Vadodara
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/MAA09402/A1M/080824/311226
  • ReraGenie IDRG-GJ-66057

Builder

  • NameEARTH EUPHORIA INFRA LLP
  • Entity typeLIMITED LIABILITY PARTNERSHIP FIRM

Key dates

this monthRegisteredDec 2021First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusValid until 30 Dec 2027
  • Registered on1 Dec 2021
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 31 Dec 2026)
  • Buildings6 building records
  • Documents filed43 files

Current status

44%102 of 230 units booked
38.9%Of the estimated cost spent so far

Figures as on 18 Jul 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AB---444286
C---24024
D---48048
E---24024
F---24024
G---24024

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building6

As on 18 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 54 construction stages are filed complete across 6 buildings. The stage furthest along is Stilt Floor, at 42%.

AB64%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor29%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats12%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing28%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing12%
C73%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor42%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats42%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing28%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing42%
D66%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor21%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats21%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing35%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing21%
E44%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
F44%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
G44%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities23

As on 18 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes50%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesYes0%
Emergency evacuationYes0%
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%
Compound wallYes65%
Plinth protectionYes100%
Water tankYes0%
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,845 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 100.00 cr
Cost incurredRs 38.90 cr
Spent of the estimate38.9%
BuildingWingEstimatedIncurred
ABNARs 36.00 crRs 18.00 cr
DNARs 20.00 crRs 9.10 cr
CNARs 12.00 crRs 6.45 cr
ENARs 11.00 crRs 1.85 cr
FNARs 10.50 crRs 1.75 cr
GNARs 10.50 crRs 1.75 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRuchir Manojbhai Sheth
EngineerNILESHKUMAR PIYUSHBHAI SUTHAR

Documents filed43

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/MAA09402/A1M/080824/311226 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)18 Jul 2024
Engineer's certificate annexure18 Jul 2024
RERA registration certificate1 Dec 2021
Alteration certificate-
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Drainage affidavit-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Approved building or plotting plan-
Title clearance certificate-
Title report-
Property card-
Property card 2-
Property card-
Project photograph-
Proforma sale deed-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

44%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 12 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep EARTH EUPHORIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near NAGARWADA2,900+ in Vadodara

2 kmEARTH EUPHORIAOther 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: EARTH EUPHORIA INFRA LLP

EARTH EUPHORIA INFRA LLP has 1 registration on GujRERA, including EARTH EUPHORIA. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if EARTH EUPHORIA is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of EARTH EUPHORIA?

The registered promoter entity is EARTH EUPHORIA INFRA LLP, a limited liability partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in EARTH EUPHORIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at EARTH EUPHORIA?

The professionals named in the filing: Architect: Ruchir Manojbhai Sheth; Engineer: NILESHKUMAR PIYUSHBHAI SUTHAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EARTH EUPHORIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EARTH EUPHORIA. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EARTH EUPHORIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.