Home / Browse projects / Raichur, Karnataka / Construction of 2419 houses for urban poor’s at R
Construction of 2419 houses for urban poor’s at R
By CMC Raichuru
RG-KA-41579 · RERA PRM/KA/RERA/1269/385/PR/171023/006338 · Last updated on RERA Karnataka portal: 10 Oct 2023
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Construction of 2419 houses for urban poor’s at R is a Residential/Group Housing project by CMC Raichuru in Raichur, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1269/385/PR/171023/006338 on 17 Oct 2023. Possession is promised by 27 Aug 2027.
At a glance
Project
- NameConstruction of 2419 houses for urban poor’s at R
- TypeResidential/Group Housing
- Location
- Raichur
- 584101
- Pincode584101
- RERA no.PRM/KA/RERA/1269/385/PR/171023/006338
- ReraGenie IDRG-KA-41579
Builder
- NameCMC Raichuru
- Entity typeRajiv Gandhi Housing Corporation Limited
- Authorized SignatoryMunicipal Commissioner
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on17 Oct 2023
- Promised completion27 Aug 2027
- Revised completionNone
- Buildings1 building record
- Documents filed92 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A block | - | - | - | 2419 | 0 | 2419 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 10 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 10 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | No | Not applicable |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| DC | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 203.00 cr | - |
| On-site expenditure-Site Overhead | Rs 35.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 30.00 lakh | - |
| On-site expenditure-Salaries of workers | Rs 15.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ACS consultants |
| Engineer | ACS consultants |
| Chartered Accountant | Account suprintendenr |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed92
As listed on the registration, under the names the promoter filed them with; the newest 80 of 92 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1269/385/PR/171023/006338 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Construction of 2419 houses at RaichurFile: form B.pdf | 10 Oct 2023 |
| MR copy Sy no 201 202 203File: sy no201,202&203 mutation and RTC.pdf | 5 Oct 2023 |
| Notarized no litigation affidavitFile: Signature.jpg | 5 Oct 2023 |
| Notarized form -B with date of completion in DDMMYYYY formatFile: Signature.jpg | 5 Oct 2023 |
| MR CopyFile: RTC.pdf | 16 Sep 2023 |
| Notarized no litigation affidavitFile: Signature.jpg | 16 Sep 2023 |
| Notarized form -B with date of completion in DDMMYYYY formatFile: Signature.jpg | 16 Sep 2023 |
| Karnataka State Pollution Control Board CertificateFile: Industry_Profile_Report_Param.pdf | 31 Aug 2023 |
| Layout PlanFile: Layout Plan.pdf | 31 Aug 2023 |
| Self Attested PANFile: self attested PAN.pdf | 31 Aug 2023 |
| Order of the deputy commissioner reserving the land to housing purposeFile: Land order copy.pdf | 31 Aug 2023 |
| NOC Copy of Karnataka Urban Water Supply & Drainage Board.File: NOC copy water supply.pdf | 31 Aug 2023 |
| Ministry of Environment and Forests (MoEF) applicationFile: MOEF application.pdf | 31 Aug 2023 |
| sanctioned drawings Floor plans, sectional drawings and elevations.File: Plans.pdf | 31 Aug 2023 |
| profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22File: 3 YEARS Balance Sheet merged.pdf | 31 Aug 2023 |
| RTC, survey 201/ 202/203 | - |
| Mutation, survey 201/ 202/203 | - |
| Encumbrance Certificate, survey 201/ 202/203 | - |
| Conversion/Alienation Order, survey 201/ 202/203 | - |
| Khatha, survey 201/ 202/203 | - |
| Registration CertificateFile: GST num.pdf | - |
| Certificate issued by CA Form 1 | - |
| Certificate issued by Architect Form 2 | - |
| Certificate issued by Engineer Form 3 | - |
| TDR Purchase Deed / Sale DeedFile: GAzzette.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Land order copy.pdf | - |
| Certificate from Chartered AccountFile: Account statement.pdf | - |
| Certificate from Chartered AccountFile: Account statement.pdf | - |
| Balance Sheet 2021 - 2022File: Account statement compressed.pdf | - |
| Balance Sheet 2020 - 2021File: Account statement compressed.pdf | - |
| Balance Sheet 2019 - 2020File: Account statement compressed.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: Account statement compressed.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Account statement compressed.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: Account statement compressed.pdf | - |
| Director's Report 2021 - 2022File: Account statement compressed.pdf | - |
| Director's Report 2020 - 2021File: Account statement compressed.pdf | - |
| Director's Report 2019 - 2020File: Account statement compressed.pdf | - |
| Cash Flow Statement 2021 - 2022File: Account statement compressed.pdf | - |
| Cash Flow Statement 2020 - 2021File: Account statement compressed.pdf | - |
| Auditor's Report 2021 - 2022File: Account statement compressed.pdf | - |
| Auditor's Report 2020 - 2021File: Account statement compressed.pdf | - |
| Auditor's Report 2019 - 2020File: Account statement compressed.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: Account statement compressed.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: Account statement compressed.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: Account statement compressed.pdf | - |
| GAzzette | - |
| Signature | - |
| Signature | - |
| Layout | - |
| Typical section & Elevation | - |
| Layout | - |
| Typical section & Elevation | - |
| Footing | - |
| Layout | - |
| Layout | - |
| Layout | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Elevation | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Signature | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Keep Construction of 2419 houses for urban poor’s on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Raichur18 in Raichur
Akhil Pride
Akhil Infra
S S OAKS
SANJEEVA SAI PROJECTS
GDS HEMA PRIDE
MOHANA KRISHNA CONSTRUCT
AR ENCLAVE PHASE 2
A.R.BUILDERS
AR ENCLAVE PHASE 1
A.R.BUILDERS
225 Housing Scheme at Manvi
Karnataka Housing Board
See every Raichur project, with the district possession charts
Builder: CMC Raichuru
CMC Raichuru has 1 registration on RERA Karnataka, including Construction of 2419 houses for urban poor’s at R. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Raichur district page.
Frequently asked questions
What are my rights if Construction of 2419 houses for urban poor’s at R is delayed beyond 27 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Construction of 2419 houses for urban poor’s at R?
The registered promoter entity is CMC Raichuru, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Construction of 2419 houses for urban poor’s at R?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Construction of 2419 houses for urban poor’s at R?
The professionals named in the filing: Architect: ACS consultants; Engineer: ACS consultants; Chartered Accountant: Account suprintendenr. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Construction of 2419 houses for urban poor’s at R?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback