Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Aug 2027Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 92 documents Report an error

Construction of 2419 houses for urban poor’s at R is a Residential/Group Housing project by CMC Raichuru in Raichur, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1269/385/PR/171023/006338 on 17 Oct 2023. Possession is promised by 27 Aug 2027.

At a glance

Project

  • NameConstruction of 2419 houses for urban poor’s at R
  • TypeResidential/Group Housing
  • Location
    • Raichur
    • 584101
  • Pincode584101
  • RERA no.PRM/KA/RERA/1269/385/PR/171023/006338
  • ReraGenie IDRG-KA-41579

Builder

  • NameCMC Raichuru
  • Entity typeRajiv Gandhi Housing Corporation Limited
  • Authorized SignatoryMunicipal Commissioner

Key dates

this monthRegisteredOct 2023PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Oct 2023
  • Promised completion27 Aug 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A block---241902419

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 10 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 10 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area178,871 sq m
Named landowners1
LandownerVillageDistrict
DC--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 203.80 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 203.00 cr-
On-site expenditure-Site OverheadRs 35.00 lakh-
On-site expenditure-Consultants FeesRs 30.00 lakh-
On-site expenditure-Salaries of workersRs 15.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectACS consultants
EngineerACS consultants
Chartered AccountantAccount suprintendenr

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed92

As listed on the registration, under the names the promoter filed them with; the newest 80 of 92 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1269/385/PR/171023/006338 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Construction of 2419 houses at RaichurFile: form B.pdf10 Oct 2023
MR copy Sy no 201 202 203File: sy no201,202&203 mutation and RTC.pdf5 Oct 2023
Notarized no litigation affidavitFile: Signature.jpg5 Oct 2023
Notarized form -B with date of completion in DDMMYYYY formatFile: Signature.jpg5 Oct 2023
MR CopyFile: RTC.pdf16 Sep 2023
Notarized no litigation affidavitFile: Signature.jpg16 Sep 2023
Notarized form -B with date of completion in DDMMYYYY formatFile: Signature.jpg16 Sep 2023
Karnataka State Pollution Control Board CertificateFile: Industry_Profile_Report_Param.pdf31 Aug 2023
Layout PlanFile: Layout Plan.pdf31 Aug 2023
Self Attested PANFile: self attested PAN.pdf31 Aug 2023
Order of the deputy commissioner reserving the land to housing purposeFile: Land order copy.pdf31 Aug 2023
NOC Copy of Karnataka Urban Water Supply & Drainage Board.File: NOC copy water supply.pdf31 Aug 2023
Ministry of Environment and Forests (MoEF) applicationFile: MOEF application.pdf31 Aug 2023
sanctioned drawings Floor plans, sectional drawings and elevations.File: Plans.pdf31 Aug 2023
profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22File: 3 YEARS Balance Sheet merged.pdf31 Aug 2023
RTC, survey 201/ 202/203-
Mutation, survey 201/ 202/203-
Encumbrance Certificate, survey 201/ 202/203-
Conversion/Alienation Order, survey 201/ 202/203-
Khatha, survey 201/ 202/203-
Registration CertificateFile: GST num.pdf-
Certificate issued by CA Form 1-
Certificate issued by Architect Form 2-
Certificate issued by Engineer Form 3-
TDR Purchase Deed / Sale DeedFile: GAzzette.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Land order copy.pdf-
Certificate from Chartered AccountFile: Account statement.pdf-
Certificate from Chartered AccountFile: Account statement.pdf-
Balance Sheet 2021 - 2022File: Account statement compressed.pdf-
Balance Sheet 2020 - 2021File: Account statement compressed.pdf-
Balance Sheet 2019 - 2020File: Account statement compressed.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Account statement compressed.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Account statement compressed.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Account statement compressed.pdf-
Director's Report 2021 - 2022File: Account statement compressed.pdf-
Director's Report 2020 - 2021File: Account statement compressed.pdf-
Director's Report 2019 - 2020File: Account statement compressed.pdf-
Cash Flow Statement 2021 - 2022File: Account statement compressed.pdf-
Cash Flow Statement 2020 - 2021File: Account statement compressed.pdf-
Auditor's Report 2021 - 2022File: Account statement compressed.pdf-
Auditor's Report 2020 - 2021File: Account statement compressed.pdf-
Auditor's Report 2019 - 2020File: Account statement compressed.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Account statement compressed.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: Account statement compressed.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: Account statement compressed.pdf-
GAzzette-
Signature-
Signature-
Layout-
Typical section & Elevation-
Layout-
Typical section & Elevation-
Footing-
Layout-
Layout-
Layout-
Signature-
Signature-
Signature-
Signature-
Signature-
Signature-
Signature-
Signature-
Signature-
Signature-
Elevation-
Signature-
Signature-
Signature-
Signature-
Signature-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

Keep Construction of 2419 houses for urban poor’s on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Raichur18 in Raichur

Builder: CMC Raichuru

CMC Raichuru has 1 registration on RERA Karnataka, including Construction of 2419 houses for urban poor’s at R. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Raichur district page.

Frequently asked questions

What are my rights if Construction of 2419 houses for urban poor’s at R is delayed beyond 27 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Construction of 2419 houses for urban poor’s at R?

The registered promoter entity is CMC Raichuru, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Construction of 2419 houses for urban poor’s at R?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Construction of 2419 houses for urban poor’s at R?

The professionals named in the filing: Architect: ACS consultants; Engineer: ACS consultants; Chartered Accountant: Account suprintendenr. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Construction of 2419 houses for urban poor’s at R?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Construction of 2419 houses for urban poor’s at R. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Construction of 2419 houses for urban poor’s to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.