Home / Browse projects / Kalaburagi, Karnataka / B L RESIDENCY

Registration approved No litigation declared Residential/Group Housing project

B L RESIDENCY

By M/S ISHANYA BUILDERS AND DEVELOPERS

RG-KA-23210 · RERA PRM/KA/RERA/1263/419/PR/180424/006790 · Last updated on RERA Karnataka portal: 13 Nov 2024

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
Sep 2025Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 129 documents Report an error

B L RESIDENCY is a Residential/Group Housing project by M/S ISHANYA BUILDERS AND DEVELOPERS in Kalaburagi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1263/419/PR/180424/006790 on 18 Apr 2024. Possession is promised by 29 Sep 2025. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameB L RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • Kalaburagi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1263/419/PR/180424/006790
  • ReraGenie IDRG-KA-23210

Builder

  • NameM/S ISHANYA BUILDERS AND DEVELOPERS
  • Entity typePartnership Firm
  • GSTIN29AAGFI8057B1ZB
  • Authorized SignatoryMR AKHILESH B KALASHETTY S/O BASAVARAJ KALSHETTY
  • Other registrations3 more →

Key dates

this monthRegisteredApr 2024First promiseSep 2024Revised toSep 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Apr 2024
  • Promised completion29 Sep 2025
  • Revised completionRevised to 29 Sep 2025 (originally 30 Sep 2024)
  • Buildings1 building record
  • Documents filed129 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B L RESIDENCY---19019

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 13 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership6

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners6
LandownerVillageDistrict
KULKARNI GURURAJ LAXMAN RAO S/O LAXMAN RAO KULKARNI--
JAGANATHRAO KULKARNI S/O LAXMANRAO KULKARNI--
VIJAYA L KULKARNI S/O LAXMAN RAO KULKARNI--
SUDHIR LAXMAN RAO BILWAR S/O LAXMAN RAO BILWAR--
D L KULKARNI S/O LAXMANRAO--
SHAILAJA R BILWARKAR W/O RAVINDRA BILWARKAR--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.24 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.24 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFIRDOUS KHANAM
EngineerER. MOHAMMED WAJEED ALI
Chartered AccountantMOHAMMED KHAJA MOINUDDIN

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1263/419/PR/250201/006790Sep 2024 → Sep 2025

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed129

As listed on the registration, under the names the promoter filed them with; the newest 80 of 129 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1263/419/PR/180424/006790 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Uploaded Regarding Renewed Plan Blue Print with Declaration letterFile: Renewed Plan Blue Print.pdf13 Nov 2024
Uploaded Regarding Renewed Order Copy with Declaration letterFile: Renewed Order Copy.pdf13 Nov 2024
Uploaded Declaration letter regarding Single plot layout Order with marked copyFile: Declaration letter regarding Single plot layout Order with marked copy.pdf8 Apr 2024
Uploaded the self-attested copy of the Water supply NOCFile: Self-attested copy of the Water supply NOC.pdf8 Apr 2024
Uploaded EC from 23-3-2023 to till dateFile: ECC-27032024.pdf8 Apr 2024
Uploaded EC from 23-3-2023 to till dateFile: Land Guidance Value Calculation Sheet as per Land Guidance Value.pdf8 Apr 2024
Uploaded Latest Land Guidance ValueFile: Land Guidance Value.pdf8 Apr 2024
Uploaded permission letter issued by the Karnataka Ground Water AuthorityFile: Permission letter issued by the Karnataka Ground Water Authority.pdf8 Apr 2024
Uploaded 100% & 30% account number details mentioned in form-1 chartered accountant certificateFile: 100% & 30% account number details mentioned in form-1 chartered accountant certificate Mar13 Mar 2024
Uploaded Sources of funds to complete the projectFile: Sources of funds to complete the project.pdf13 Mar 2024
Uploaded Certificate of AuthorizationFile: Cetificate of Authorization.pdf13 Mar 2024
Uploaded EC from 23-3-2023 to till dateFile: EC from 23 3 2023 to till date.pdf13 Mar 2024
Uploaded Conversion order issued by the deputy commissionerFile: Conversion Certificate.pdf13 Mar 2024
Uploaded Title deed of the land ownerFile: Title deed of the land owner.pdf13 Mar 2024
Uploaded latest katha certificateFile: Khata form 2.pdf13 Mar 2024
Uploaded Advocate search reportFile: Advocate Search Report.pdf13 Mar 2024
Uploaded Single plot layout Order.File: Single layout order Marked Copy.pdf13 Mar 2024
Uploaded complete Building License.File: Complete Building License Approved City Coorporation.pdf13 Mar 2024
Uploaded Brief estimated cost of construction certified by the registered Civil EngineerFile: Brief estimated cost of construction certified by the registered Civil Engineer.pdf13 Mar 2024
Upload the STP/Septic Tank, Soak pit, and sewer line drawing certified by the Engineer.File: Septic Tank Soak pit and sewer line drawing certified by the Engineer.pdf13 Mar 2024
Uploaded Income Tax Returns of 2021-22File: Income Tax Returns 2021-22.pdf13 Mar 2024
Uploaded profit and loss account and Balance Sheet with CA UDIN along with schedule of 2021-22File: Profit & Loss and Balance 2021-22.pdf13 Mar 2024
Uploaded Income Tax Returns 2022-23File: Income Tax Returns 2022-23.pdf13 Mar 2024
Uploaded Profit & Loss and Balance 2022-23File: Profit & Loss and Balance 2022-23.pdf13 Mar 2024
Uploaded Income Tax Returns 2023-24File: Income Tax Returns 2023-24.pdf13 Mar 2024
Uploaded Profit & Loss and Balance 2023-24File: Profit & Loss and Balance 2023-24.pdf13 Mar 2024
Uploaded GESCOM NOCFile: Gescom NOC.pdf13 Mar 2024
Uploaded Land Guidance ValueFile: Land cost detail as per the guidance value issued by Sub Registered Kalaburagi.pdf13 Mar 2024
Uploaded permission letter issued by the Karnataka Ground Water Authority.File: Declaration Regarding Water Board NOC.pdf13 Mar 2024
Uploaded valid partnership deedFile: Valid Partnership Deed.pdf14 Feb 2024
Uploaded GST certificate self attastedFile: GST Registration Certificate.pdf14 Feb 2024
Total estimated cost mentioned in bank affidavitFile: Bank Affidavit.pdf14 Feb 2024
Uploaded Profit and Loss and balance sheet & ITR 2020-21File: Profit and Loss and balance sheet & ITR 2022-23.pdf14 Feb 2024
Uploaded Profit and Loss and balance sheet & ITR 2021-22 ShantveerFile: Profit and Loss and balance sheet & ITR 2022-23 Shantveer B.pdf14 Feb 2024
Uploaded Profit and Loss and balance sheet & ITR 2022-23 Akhilesh BFile: Profit and Loss and balance sheet & ITR 2022-23.pdf14 Feb 2024
Uploaded 100% & 30% account number in form-1 chartered accountant certificateFile: 100% & 30% account number details mentioned in form-1 chartered accountant certificate.pdf14 Feb 2024
Uploaded Certificate of AuthorizationFile: Authorization Letter of Partnership Deed.pdf14 Feb 2024
Uploaded Connected MRFile: Mutation copy.pdf14 Feb 2024
Encumbrance CertificateFile: Encumbrance Certificate.pdf14 Feb 2024
Uploaded Conversion order issued by the deputy commissionerFile: Single plot layout Order.pdf14 Feb 2024
Uploaded Single plot layoutFile: Single plot layout.jpeg14 Feb 2024
Uploaded Single plot layout OrderFile: Single plot layout Order.pdf14 Feb 2024
Uploaded certified Carpet area calculationFile: Certified Carpet area calculation.pdf14 Feb 2024
Uploaded CDP map showing the proposed siteFile: CDP PLAN SHOWING SITE copy.pdf14 Feb 2024
Uploaded village map showing the proposed siteFile: Village Map.pdf14 Feb 2024
Uploaded complete Building LicenseFile: Approved Building License.pdf14 Feb 2024
Uploaded the Engineer certificate in the prescribed formatFile: Engineer certificate in the prescribed format.pdf14 Feb 2024
Uploaded calculation sheet certified by the EngineerFile: Calculation sheet certified by the Engineer.pdf14 Feb 2024
Uploaded latest self attested Engineer license certificateFile: Latest dated self attested copy of the Engineer license certificate.pdf14 Feb 2024
Uploaded brief estimated cost of construction certified by the registered Civil EngineerFile: Certificate issued by Engineer.pdf14 Feb 2024
Uploaded STP Septic Tank Soak pit and sewer line drawing certified by the EngineerFile: STP Design.pdf14 Feb 2024
Uploaded sold and unsold detailsFile: Sold and Unsold Declaration.pdf14 Feb 2024
Uploaded GESCOM NOCFile: Gescom NOC.pdf14 Feb 2024
Uploaded Land cost calculation sheet as per the guidance valueFile: Land Guidance Value.pdf14 Feb 2024
Uploaded Ongoind Project Certified by Engineer Form 6File: Ongoind Project Certified by Engineer Form 6.pdf14 Feb 2024
RTC, survey 69-
Mutation, survey 69-
Encumbrance Certificate, survey 69-
JDA, survey 69-
Khatha, survey 69-
Registration CertificateFile: Firm Registration Certificate.pdf-
Partnership DeedFile: Partnership Deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Certificate issued by Chartered Accountant Form 01.pdf-
Certificate issued by Architect Form 2File: Certificate issued by Architect.pdf-
Certificate issued by Engineer Form 3File: Certificate issued by Engineer.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation Affidavit.pdf-
Certificate from Chartered AccountFile: Certificate issued by Chartered Accountant Form 01.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: Latest Income Tax Return Acknowledgement.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Latest Income Tax Return Acknowledgement.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: Latest Income Tax Return Acknowledgement.pdf-
Approved City Coorporation Letter-
Declaration Regarding Water Board & GESCOM-
Declaration Regarding Water Board & GESCOM-
Approved Building Map-
Sectional Drawing of the apartments-

How this compares with Kalaburagi

32%of Kalaburagi projects moved their completion datethis one moved by 12 months
0%of Kalaburagi registrations are shown as withdrawn or revokedthis one is not

Computed across the 210+ Kalaburagi projects on ReraGenie, from their own filings.

Keep B L RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Kalaburagi210+ in Kalaburagi

Builder: M/S ISHANYA BUILDERS AND DEVELOPERS

M/S ISHANYA BUILDERS AND DEVELOPERS has 4 registrations on RERA Karnataka, including B L RESIDENCY and THAAI-NERALU RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Kalaburagi district page.

Frequently asked questions

What are my rights if B L RESIDENCY is delayed beyond 29 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of B L RESIDENCY?

The registered promoter entity is M/S ISHANYA BUILDERS AND DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AAGFI8057B1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in B L RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at B L RESIDENCY?

The professionals named in the filing: Architect: FIRDOUS KHANAM; Engineer: ER. MOHAMMED WAJEED ALI; Chartered Accountant: MOHAMMED KHAJA MOINUDDIN. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in B L RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About B L RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save B L RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.