Home / Browse projects / Bengaluru Urban, Karnataka / ASSETZ REN & REI
ASSETZ REN & REI
By APG PREMIUM RESIDENTIAL PRIVATE LIMITED
RG-KA-16024 · RERA PRM/KA/RERA/1251/446/PR/130225/007501 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- 1 complaint at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
ASSETZ REN & REI is a Residential/Group Housing project by APG PREMIUM RESIDENTIAL PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/130225/007501 on 13 Feb 2025. Possession is promised by 31 Jan 2029. 159 of the 218 units on this registration are recorded sold or booked, and 2 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameASSETZ REN & REI
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560099
- Pincode560099
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/130225/007501
- ReraGenie IDRG-KA-16024
Builder
- NameAPG PREMIUM RESIDENTIAL PRIVATE LIMITED
- Entity typeCompany
- CINU45201KA2018PTC114159
- GSTIN29AARCA0497M1ZV
- Authorized SignatoryAkshay Kishore Dewani
- CeoAkshay Kishore Dewani
- DirectorsAkshay Kishore Dewani, Sunil Kumar Pareek, Ben Salmon, Jagannath Laxman Shetty
- Project HeadNandakumar P S
- Other registrations2 more →
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on13 Feb 2025
- Promised completion31 Jan 2029
- Revised completionNone
- Buildings2 building records
- Documents filed136 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower-A1 | - | - | - | 109 | 0 | 109 |
| Tower A2 | - | - | - | 109 | 0 | 109 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 18 construction stages are filed complete. The stage furthest along is Upto Plinth Level, at 85%.
Building: 27% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 85% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 70% |
| Retaining wall (All types) | 80% |
| RCC or MS Framed structure | 49% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 5% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 15% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 15% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 45% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 35% |
| Community Hall | Yes | 35% |
| Outdoor Sports facility | Yes | 35% |
| Indoor Sports facility | Yes | 35% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 35% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | Yes | 0% |
| Staircases | Yes | 45% |
| Lifts | Yes | 30% |
| Corridor/Lobbies | Yes | 45% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 45% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Rathnamma M | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 133.25 cr | Rs 43.23 cr |
| On-site expenditure-Site Overhead | Rs 11.70 cr | Rs 1.14 cr |
| Approval Cost | Rs 10.47 cr | Rs 2.72 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 10.00 cr | Rs 2.88 cr |
| On-site expenditure-Consultants Fees | Rs 2.36 cr | Rs 1.02 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VEDA T N |
| Engineer | B E Pruthviraja |
| Chartered Accountant | Y S Shetty & Company |
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00584/2025 | - | APG PREMIUM RESIDENTIAL PRIVATE LIMITED | 03/04/2025 |
Documents filed136
As listed on the registration, under the names the promoter filed them with; the newest 80 of 136 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/130225/007501 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - Ren & Rei.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) Ren & Rei.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU) Ren & Rei.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - Ren & Rei.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) Ren Rei.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU) Ren & Rei.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - Ren & Rei.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) Ren & Rei.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU) Ren & Rei.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - Ren & Rei.pdf | 16 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) Ren & Rei.pdf | 16 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer Certificate - REN & REI.pdf | 16 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 16 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 16 Feb 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 16 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 16 Feb 2026 |
| Q3 2025-26 Fire and Safety | 16 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 16 Feb 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 16 Feb 2026 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: Annexure 1-ADLR Sketch.pdf | 13 Feb 2025 |
| Approved Original Single Plot layout planFile: Annexure 2-Single Plot plan.pdf | 13 Feb 2025 |
| Approved Original Single Plot layout plan work orderFile: Annexure 3-Single Plot order.pdf | 13 Feb 2025 |
| Building License from Local Authority Original Copy.File: Annexure 4-Building License.pdf | 13 Feb 2025 |
| Approved building planFile: Annexure 5-Approved Building Plan.pdf | 13 Feb 2025 |
| commencement certificate.File: Annexure 6-Commencement Letter.pdf | 13 Feb 2025 |
| the latest dated self-attested copy of the Engineer license certificate.File: Annexure 7-Self Attested engineer licence.pdf | 13 Feb 2025 |
| Engineer CertificateFile: Annexure 8-Engineer Certificate.pdf | 13 Feb 2025 |
| Water NOCFile: Annexure 9-Water NOC.pdf | 13 Feb 2025 |
| Clarification reagrding land costFile: Land Cost calarification.pdf | 13 Feb 2025 |
| Site PlanFile: Site Plan.pdf | 13 Feb 2025 |
| Basement FloorFile: Basement Floor Plan.pdf | 13 Feb 2025 |
| Ground FloorFile: Ground floor plan.pdf | 13 Feb 2025 |
| 1st Floor PlanFile: 1st Floor Plan.pdf | 13 Feb 2025 |
| 2nd Floor PlanFile: 2nd Floor Plan.pdf | 13 Feb 2025 |
| 3rd to 13th floor Typical Floor PlanFile: 3rd to 13th floor Typical Floor Plan.pdf | 13 Feb 2025 |
| Section & ElevationFile: Section and Elevation.pdf | 13 Feb 2025 |
| Terrace Floor PlanFile: Terrace Floor Plan.pdf | 13 Feb 2025 |
| Form 1 CA CertificateFile: Annexure 1-Form 1 CA Certificate.pdf | 28 Jan 2025 |
| Sources of fundsFile: Annexure 2-Sources of funds.pdf | 28 Jan 2025 |
| E-KhataFile: Annexure 3-Khata.pdf | 28 Jan 2025 |
| ADLR SketchFile: Annexure 4-ADLR Sketch.pdf | 28 Jan 2025 |
| Demarcation of proposed LandFile: Annexure 5-Demarcation of proposed Land.pdf | 28 Jan 2025 |
| Village MapFile: Annexure 6-Village Map.pdf | 28 Jan 2025 |
| KSPCB NOCFile: Annexure 7-KSPCB NOC.pdf | 28 Jan 2025 |
| Self Attested engineer licenceFile: Annexure 8-Self Attested engineer licence.pdf | 28 Jan 2025 |
| Certified cost of constructionFile: Annexure 9-Certified cost of construction.pdf | 28 Jan 2025 |
| Signed SpecificationFile: Annexure 10-Signed Specification.pdf | 28 Jan 2025 |
| Water NOC KGWA NOCFile: Annexure 12-Water KGWA NOC.pdf | 28 Jan 2025 |
| STP DetailsFile: Annexure 13-STP Details.pdf | 28 Jan 2025 |
| HAL NOCFile: Annexure 14-HAL NOC.pdf | 28 Jan 2025 |
| Allotment Letter with annexure AFile: Annexure 15-Allotement Letter with annexure A.pdf | 28 Jan 2025 |
| RTC, survey 170/2 | - |
| Mutation, survey 170/2 | - |
| Encumbrance Certificate, survey 170/2 | - |
| Conversion/Alienation Order, survey 170/2 | - |
| Sale/Title/Gift Deed, survey 170/2 | - |
| JDA, survey 170/2 | - |
| Khatha, survey 170/2 | - |
| Registration CertificateFile: Annexure 1-COI.pdf | - |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| ASSETZ BLOOM & DELL Phase 2 | Survey no 109/1, 109/2,109/10 & 110 DODDABANAHALLI VILLAGE, BIDARAHALLI HOBLI, BENGALURU EAST TALUK, , BENGALURU EAST | Ongoing | Oct 2027 | Not due yet |
| ASSETZ BLOOM & DELL | Survey no 109/1, 109/2,109/10 & 110 DODDABANAHALLI VILLAGE, BIDARAHALLI HOBLI, BENGALURU EAST TALUK, , BENGALURU EAST | Ongoing | Jun 2027 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep ASSETZ REN & REI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 41 registered projects within 2 km.
Adarsh Welkin Park Phase 2
Akarshak Realty Private Limited
Adarsh Welkin Park Phase 1
Akarshak Realty Private Limited
Nambiar District 25 Phase 1
Nambiar EnsembleResidential Projects LLP
CASAGRAND VIVACITY
CASA GRANDE GARDEN CITY BUILDERS PVT LTD
Mahendra Solterra Aarya Phase-2
Mahendra Homes Private Limited
SIGNATURE SPLENDOR
SIGNATURE DWELLINGS PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: APG PREMIUM RESIDENTIAL PRIVATE LIMITED
APG PREMIUM RESIDENTIAL PRIVATE LIMITED has 3 registrations on RERA Karnataka, including Assetz Bloom & Dell - Phase 2 and ASSETZ REN & REI. Its filings declare 2 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if ASSETZ REN & REI is delayed beyond 31 Jan 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of ASSETZ REN & REI?
The registered promoter entity is APG PREMIUM RESIDENTIAL PRIVATE LIMITED, a company as per the filing. Its CIN U45201KA2018PTC114159 and GSTIN 29AARCA0497M1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in ASSETZ REN & REI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ASSETZ REN & REI?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at ASSETZ REN & REI?
The professionals named in the filing: Architect: VEDA T N; Engineer: B E Pruthviraja; Chartered Accountant: Y S Shetty & Company. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ASSETZ REN & REI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.