Assetz Marq Phase 3B
By Assetz Whitefield Homes Private Limited
RG-KA-77737 · RERA PRM/KA/RERA/1251/446/PR/091122/005433 · Last updated on RERA Karnataka portal: 15 Apr 2026
Source: official RERA Karnataka filing
Red flags
- 1 complaint at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
Assetz Marq Phase 3B is a Residential/Group Housing project by Assetz Whitefield Homes Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/091122/005433 on 9 Nov 2022. Possession is promised by 31 Jul 2027. 383 of the 384 units on this registration are recorded sold or booked, and 15 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameAssetz Marq Phase 3B
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560067
- Pincode560067
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/091122/005433
- ReraGenie IDRG-KA-77737
Builder
- NameAssetz Whitefield Homes Private Limited
- Entity typeCompany
- CINU70109KA2012PTC063873
- GSTIN29AAKCA7816P1ZV
- Authorized SignatoryAkshay Kishore Dewani
- CeoAkshay Kishore Dewani
- DirectorsAkshay Kishore Dewani, Sachin Vora, Ben Salmon
- Project HeadAkshay Kishore Dewani
- Other registrations3 more →
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on9 Nov 2022
- Promised completion31 Jul 2027
- Revised completionNone
- Buildings1 building record
- Documents filed121 files
Current status
Figures as on 15 Apr 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Marq Phase 3B | - | - | - | 384 | 0 | 384 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 18 construction stages are filed complete. The stage furthest along is Sub-structure flooring (Parking Floor, at 0%.
Building: 83% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | Yes | 100% |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | Yes | 95% |
| Street Lighting | Yes | 98% |
| Electricity | Yes | 85% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 100% |
| Club House | Yes | 100% |
| Community Hall | Yes | 100% |
| Outdoor Sports facility | Yes | 100% |
| Indoor Sports facility | Yes | 100% |
| Swimming Pool | Yes | 100% |
| Gym | Yes | 100% |
| Parks | Yes | 100% |
| Power Backup | Yes | 100% |
| Piped Gas | Yes | 100% |
| Water and Sanitation | Yes | 100% |
| Air Conditioning | Yes | 100% |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 100% |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas | Yes | 100% |
| Provision for lodging of management staff and security staff | Yes | 100% |
| Water conservation and renewable energy | Yes | 100% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sai Lakshmi Industries Pvt Ltd | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 180.64 cr | Rs 182.48 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 26.75 cr | Rs 27.51 cr |
| On-site expenditure-Site Overhead | Rs 8.63 cr | Rs 8.64 cr |
| Approval | Rs 8.63 cr | Rs 8.64 cr |
| On-site expenditure-Consultants Fees | Rs 2.88 cr | Rs 2.94 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Veda T N (Katerra Design Private Limited) |
| Engineer | B E Pruthviraja |
| Chartered Accountant | Y S Shetty & Co |
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00729/2023 | - | Assetz Whitefield Homes Private Limited | 09/05/2023 |
Documents filed121
As listed on the registration, under the names the promoter filed them with; the newest 80 of 121 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/091122/005433 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA - Marq 3B.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Marq 3B.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer - Marq 3B.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Labour and Education Department | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant (QU) Marq 3B.pdf | 11 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5-Architech Certificate Marq 3B.pdf | 11 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer certificate.pdf | 11 Mar 2026 |
| Q3 2025-26 Water supply and sewage board | 11 Mar 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 11 Mar 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 11 Mar 2026 |
| Q3 2025-26 KPTCL- BESCOM | 11 Mar 2026 |
| Q3 2025-26 Fire and Safety | 11 Mar 2026 |
| Q3 2025-26 Labour and Education Department | 11 Mar 2026 |
| Q3 2025-26 Airport Authority of India | 11 Mar 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 11 Mar 2026 |
| Covering LetterFile: Covering Letter.pdf | 9 Nov 2022 |
| CA CertificateFile: Annexure 1-CA Certificate.pdf | 9 Nov 2022 |
| Signed Financial 2021-22File: Annexure 2-Signed Financial 2021-22.pdf | 9 Nov 2022 |
| Audit Report 2021-22File: Annexure 3-Audit Report 2021-22.pdf | 9 Nov 2022 |
| ITR 2021-22File: Annexure 4-ITR 2021-22.pdf | 9 Nov 2022 |
| Bank StatementFile: Annexure 5-Bank statement.pdf | 9 Nov 2022 |
| Title DeedFile: Annexure 6-Title Deed.pdf | 9 Nov 2022 |
| RTCFile: Annexure 7-RTC.pdf | 9 Nov 2022 |
| GPAFile: Annexure 8-GPA.pdf | 9 Nov 2022 |
| conversion OrderFile: Annexure 9-Coversion Order.pdf | 9 Nov 2022 |
| Final GazzetteFile: Annexure 10-Final Gazette.pdf | 9 Nov 2022 |
| MutationFile: Annexure 11 - Mutation issued by Panchayat.pdf | 9 Nov 2022 |
| MRFile: Annexure 12-Endorsement for non availability of MR1-96-97.pdf | 9 Nov 2022 |
| Approved Building PlanFile: Annexure 13 - Approved Building Plan (Site Plan).pdf | 9 Nov 2022 |
| Basement Floor PlanFile: Annexure 14-Basement Floor Plan.pdf | 9 Nov 2022 |
| Ground Floor PlanFile: Annexure 15-Ground Floor Plan.pdf | 9 Nov 2022 |
| First Floor PlanFile: Annexure 16-First Floor Plan.pdf | 9 Nov 2022 |
| Second Floor PlanFile: Annexure 17-Secound Floor Plan.pdf | 9 Nov 2022 |
| 3rd ,4th & 5th Floor PlanFile: Annexure 18-3rd,4th & 5th floor Plan.pdf | 9 Nov 2022 |
| 6th Floor PlanFile: Annexure 19-6th Floor Plan.pdf | 9 Nov 2022 |
| 7th to 25th floor planFile: Annexure 20-7th to 25th floor Plan.pdf | 9 Nov 2022 |
| 26,27,28,29 and Terrace floor planFile: Annexure 21-26,27,28,29 & terrace floor Plan.pdf | 9 Nov 2022 |
| ElevationFile: Annexure 22-Elevation.pdf | 9 Nov 2022 |
| Section PlanFile: Annexure 22-Section.pdf | 9 Nov 2022 |
| Reliquishment deedFile: Annexure 23-Reliquishment Deed.pdf | 9 Nov 2022 |
| SEIAA NOCFile: Annexure 24- SEIAA NOC.pdf | 9 Nov 2022 |
| Certificate for Carpet AreaFile: Annexure 25-Certificate for Carpet Area Calculation.pdf | 9 Nov 2022 |
| CDP MapFile: Annexure 26-CDP MAP.pdf | 9 Nov 2022 |
| Village MapFile: Annexure 27-Village map.pdf | 9 Nov 2022 |
| Water Permission NOCFile: Annexure 28-Water Permission.pdf | 9 Nov 2022 |
| STP DetailsFile: Annexure 29-Provison for STP.pdf | 9 Nov 2022 |
| RTC, survey 167/1 167/2 167/3 167/4 159/1 159/2 160/1 168 (168/1 & 168/2) 169/1 169/2 169/3 169/4 and 171 | - |
| Mutation, survey 167/1 167/2 167/3 167/4 159/1 159/2 160/1 168 (168/1 & 168/2) 169/1 169/2 169/3 169/4 and 171 | - |
| Encumbrance Certificate, survey 167/1 167/2 167/3 167/4 159/1 159/2 160/1 168 (168/1 & 168/2) 169/1 169/2 169/ | - |
| Conversion/Alienation Order, survey 167/1 167/2 167/3 167/4 159/1 159/2 160/1 168 (168/1 & 168/2) 169/1 169/2 | - |
| Sale/Title/Gift Deed, survey 167/1 167/2 167/3 167/4 159/1 159/2 160/1 168 (168/1 & 168/2) 169/1 169/2 169/3 1 | - |
| JDA, survey 167/1 167/2 167/3 167/4 159/1 159/2 160/1 168 (168/1 & 168/2) 169/1 169/2 169/3 169/4 and 171 | - |
| Khatha, survey 167/1 167/2 167/3 167/4 159/1 159/2 160/1 168 (168/1 & 168/2) 169/1 169/2 169/3 169/4 and 171 | - |
| Registration CertificateFile: Annexure 1-COI.pdf | - |
| Organization StructureFile: Annexure 11-Org Structure.pdf | - |
| Certificate issued by CA Form 1 | - |
| Certificate issued by Architect Form 2 | - |
| Certificate issued by Engineer Form 3 | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Annexure 45-Joint Affidavit.pdf | - |
| Balance Sheet 2021 - 2022File: Annexure 60c-Provisional BS 2021-22.pdf | - |
| Balance Sheet 2020 - 2021File: Annexure 60 - BS 2020-21.pdf | - |
| Balance Sheet 2019 - 2020File: Annexure 60 - BS 2019-20.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: Annexure 60c-Provisional P & L 2021-22.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Annexure 61 - P & L 2020-21.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: Annexure 61 - P & L 2019-20.pdf | - |
| Director's Report 2021 - 2022File: Annexure 62-DR 2021-22.pdf | - |
| Director's Report 2020 - 2021File: Annexure 62 - DR 2020-21.pdf | - |
| Director's Report 2019 - 2020File: Annexure 62 - DR 19-20.pdf | - |
| Cash Flow Statement 2021 - 2022File: Annexure 63c-CF 2021-22.pdf | - |
| Cash Flow Statement 2020 - 2021File: Annexure 63 - CF 2020-21.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Assetz Marq Phase 3B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 35 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
DS MAX SKY FIELDS
DS Max Properties Private Limited
Sowparnika Rhythm of Rain
SOWPARNIKA HOMES PRIVATE LIMITED
WORLD OF GARDENS
RLP TRENDSQUARES PROJECTS PRIVATE LIMITED
DS MAX SKYSAMPURN
DS MAX PROPERTIES PRIVATE LIMITED
Amrutha Lake Vista
Amrutha Shelters Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Assetz Whitefield Homes Private Limited
Assetz Whitefield Homes Private Limited has 4 registrations on RERA Karnataka, including Assetz Marq Phase 3B and Assetz Marq Building 2 - Tower 5. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Assetz Marq Phase 3B is delayed beyond 31 Jul 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Assetz Marq Phase 3B?
The registered promoter entity is Assetz Whitefield Homes Private Limited, a company as per the filing. Its CIN U70109KA2012PTC063873 and GSTIN 29AAKCA7816P1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Assetz Marq Phase 3B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Assetz Marq Phase 3B?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Assetz Marq Phase 3B?
The professionals named in the filing: Architect: Veda T N (Katerra Design Private Limited); Engineer: B E Pruthviraja; Chartered Accountant: Y S Shetty & Co. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Assetz Marq Phase 3B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.