Home / Browse projects / Bengaluru Urban, Karnataka / Assetz Inspira Melodies of Life Apartments
Assetz Inspira Melodies of Life Apartments
By IINSPIRA WORLDCITY PROJECTS PRIVATE LIMITED
RG-KA-37634 · RERA PRM/KA/RERA/1251/310/PR/061225/008321 · Last updated on RERA Karnataka portal: 13 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Assetz Inspira Melodies of Life Apartments is a Residential/Group Housing project by IINSPIRA WORLDCITY PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/061225/008321 on 6 Dec 2025. Possession is promised by 30 Nov 2030. 42 of the 204 units on this registration are recorded sold or booked, and 1 of 18 construction stages are filed complete.
At a glance
Project
- NameAssetz Inspira Melodies of Life Apartments
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560099
- Pincode560099
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/061225/008321
- ReraGenie IDRG-KA-37634
Builder
- NameIINSPIRA WORLDCITY PROJECTS PRIVATE LIMITED
- Entity typeCompany
- CINU70103KA2022PTC160915
- GSTIN29AAGCI6543P1ZT
- Authorized SignatoryPrabhu U R
- Managing DirectorPrabhu U R
- DirectorsPrabhu U R, Somashekar Akarsh, Aravinda MS
- Project HeadNanda Kumar PS
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on6 Dec 2025
- Promised completion30 Nov 2030
- Revised completionNone
- Buildings2 building records
- Documents filed143 files
Current status
Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | - | - | - | 102 | 0 | 102 |
| Tower 2 | - | - | - | 102 | 0 | 102 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 18 construction stages are filed complete. The stage furthest along is Foundation footing work, at 25%.
Building: 7% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 25% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | Yes | 0% |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| IINSPIRA WORLDCITY PROJECTS PRIVATE LIMITED | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 142.70 cr | Rs 3.13 cr |
| On-site expenditure-Site Overhead | Rs 63.69 cr | Rs 2.10 cr |
| On-site expenditure-Consultants Fees | Rs 3.04 cr | Rs 1.15 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 1.90 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Lolita Almeida Thota |
| Engineer | Rajesh Shirakol |
| Chartered Accountant | A.P.PRADEEP & CO |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed143
As listed on the registration, under the names the promoter filed them with; the newest 80 of 143 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/061225/008321 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - MOL Aptn.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) MOL Aptn - RA Sign.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer (QU) MOL Aptn.pdf | 13 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 13 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 13 Oct 2026 |
| Q2 2026-27 Fire and Safety | 13 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 13 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 13 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - MOL Aptn.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) MOL Aptn - RA Signed.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer (QU) MOL Aptn.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - MOL Aptn.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) MOL Aptn-signed.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer (QU) MOL Aptn.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - MOL Aptn.pdf | 4 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) MOL Aptn.pdf | 4 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer (QU) MOL Aptn.pdf | 4 Mar 2026 |
| Q3 2025-26 Water supply and sewage board | 4 Mar 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 4 Mar 2026 |
| Q3 2025-26 Fire and Safety | 4 Mar 2026 |
| Q3 2025-26 Airport Authority of India | 4 Mar 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 4 Mar 2026 |
| Structural Stability CertificateFile: Structural Stability Certificate.pdf | 3 Dec 2025 |
| BESCOM-AffidavitFile: BESCOM -Affidavit.pdf | 3 Dec 2025 |
| CA Certificate- Form 1File: Annexure 1-CA Certificate.pdf | 28 Nov 2025 |
| BANKAFFIDAVITFile: Annexure 2-BANKAFFIDAVIT.pdf | 28 Nov 2025 |
| 100% Account StatementFile: Annexure 3-100% Account Statement.pdf | 28 Nov 2025 |
| 70% Account StatementFile: Annexure 4-70% Account Statement.pdf | 28 Nov 2025 |
| 30% Account StatementFile: Annexure 5-30% Account Statement.pdf | 28 Nov 2025 |
| Auditors report 2024-25File: Annexure 6-Auditors report 2024-25.pdf | 28 Nov 2025 |
| Balance Sheet with Schedules 2024-25File: Annexure 7-Balance Sheet with Schedules 2024-25.pdf | 28 Nov 2025 |
| Profit & Loss Account 2024-25File: Annexure 8-Profit & Loss Account 2024-25.pdf | 28 Nov 2025 |
| Cash Flow 2024-25File: Annexure 9-Cash Flow 2024-25.pdf | 28 Nov 2025 |
| Source of fundFile: Annexure 10-Source of fund.pdf | 28 Nov 2025 |
| RTC 2025--26File: Annexure 11-RTC-2025-26.pdf | 28 Nov 2025 |
| MR-Title FlowFile: Annexure 12-MR-Title Flow.pdf | 28 Nov 2025 |
| ECFile: Annexure 13-Contineous EC.pdf | 28 Nov 2025 |
| Non-Litigation AffidvitFile: Annexure 14-Non-Litigation Affidvit.pdf | 28 Nov 2025 |
| Clarification regarding ongoing projectFile: Annexure 15-Clarification regarding ongoing project.pdf | 28 Nov 2025 |
| Building LicenseFile: Annexure 16-Building License.pdf | 28 Nov 2025 |
| Latitude and LogitudeFile: Annexure 17-Latitude and Lognitude.pdf | 28 Nov 2025 |
| Approved Building Plan-Site PlanFile: Annexure 18-Approved Building Plan.pdf | 28 Nov 2025 |
| Basement one Floor PlanFile: Annexure 19-Basement one Floor Plan.pdf | 28 Nov 2025 |
| Basement two Floor PlanFile: Annexure 20-Basement two Floor Plan.pdf | 28 Nov 2025 |
| Ground Floor PlanFile: Annexure 21-Ground Floor Plan.pdf | 28 Nov 2025 |
| First Floor PlanFile: Annexure 22-First Floor Plan.pdf | 28 Nov 2025 |
| Secound Floor PlanFile: Annexure 23-Secound Floor Plan.pdf | 28 Nov 2025 |
| Typical Secound Floor Plan to 12th Floor PlanFile: Annexure 24-Typical Secound Floor Plan to 12th Floor Plan.pdf | 28 Nov 2025 |
| 13th Floor PlanFile: Annexure 25-13th Floor Plan.pdf | 28 Nov 2025 |
| Terrace Floor PlanFile: Annexure 26-Terrace Floor Plan.pdf | 28 Nov 2025 |
| Elevation PlanFile: Annexure 27-Elevation Plan.pdf | 28 Nov 2025 |
| Section planFile: Annexure 28-Section plan.pdf | 28 Nov 2025 |
| Clarification regarding Commencement certificateFile: Annexure 29-Clarification regarding Commencement certificate.pdf | 28 Nov 2025 |
| CDP MapFile: Annexure 30-CDP Map.pdf | 28 Nov 2025 |
| Village MapFile: Annexure 31-Village Map.pdf | 28 Nov 2025 |
| Clarification -KTPCL NOCFile: Annexure 32-Clarification -KTPCL NOC.pdf | 28 Nov 2025 |
| Clarifiaction for delay in registering the projectFile: Annexure 34-Clarifiaction for delay in registering the project.pdf | 28 Nov 2025 |
| Details of facilitiesFile: Annexure 35-Details of facilities.pdf | 28 Nov 2025 |
| Engineer Certificate self attestedFile: Annexure 36-Self Attested engineer licence.pdf | 28 Nov 2025 |
| Clarification regarding signing the Form 3File: Annexure 37-Calarification regarding signing the Form 3.pdf | 28 Nov 2025 |
| Structural stability certifiacteFile: Annexure 38-Structural stability certifiacte.pdf | 28 Nov 2025 |
| Signed Project specifiationFile: Annexure 39-Signed Project specifiation.pdf | 28 Nov 2025 |
| Proforma Allotement letter with Annexure AFile: Annexure 40-Proforma Allotement letter with Annexure A.pdf | 28 Nov 2025 |
| BESCOM AffidavitFile: Annexure 41-BESCOM Affidavit.pdf | 28 Nov 2025 |
| SIIAA NOCFile: Annexure 42-SIIAA NOC.pdf | 28 Nov 2025 |
| Airport NOCFile: Annexure 43-Airport NOC.pdf | 28 Nov 2025 |
| Brief Project Estimation signed by Chartered EngineerFile: Annexure 44-Brief Project Estimation signed by Chartered Engineer.pdf | 28 Nov 2025 |
| Calculation of Land cost as per guidance valueFile: Annexure 45-Calculation of Land cost as per guidance value.pdf | 28 Nov 2025 |
| Signed STP DetailsFile: Annexure 46-Signed STP Details.pdf | 28 Nov 2025 |
| RERA BrochureFile: Annexure 47-RERA Brochure.pdf | 28 Nov 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Assetz Inspira Melodies of Life Apartments on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 46 registered projects within 2 km.
Adarsh Welkin Park Phase 2
Akarshak Realty Private Limited
Adarsh Welkin Park Phase 1
Akarshak Realty Private Limited
Nambiar District 25 Phase 1
Nambiar EnsembleResidential Projects LLP
CASAGRAND VIVACITY
CASA GRANDE GARDEN CITY BUILDERS PVT LTD
Mahendra Solterra Aarya Phase-2
Mahendra Homes Private Limited
SIGNATURE SPLENDOR
SIGNATURE DWELLINGS PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: IINSPIRA WORLDCITY PROJECTS PRIVATE LIMITED
IINSPIRA WORLDCITY PROJECTS PRIVATE LIMITED has 2 registrations on RERA Karnataka, including Assetz Inspira Melodies of Life Apartments and Assetz Inspira Melodies of Life. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Assetz Inspira Melodies of Life Apartments is delayed beyond 30 Nov 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Assetz Inspira Melodies of Life Apartments?
The registered promoter entity is IINSPIRA WORLDCITY PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U70103KA2022PTC160915 and GSTIN 29AAGCI6543P1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Assetz Inspira Melodies of Life Apartments?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Assetz Inspira Melodies of Life Apartments?
The professionals named in the filing: Architect: Lolita Almeida Thota; Engineer: Rajesh Shirakol; Chartered Accountant: A.P.PRADEEP & CO. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Assetz Inspira Melodies of Life Apartments?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback