RG-KA-30689 · RERA PRM/KA/RERA/1251/308/PR/121026/009011 · Last updated on RERA Karnataka portal: 5 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Sep 2030Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 105 documents Report an error

ANANDAA AIRA is a Residential/Group Housing project by ANANDAA VENTURES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/121026/009011 on 12 Oct 2026. Possession is promised by 30 Sep 2030.

At a glance

Project

  • NameANANDAA AIRA
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 560099
  • Pincode560099
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/121026/009011
  • ReraGenie IDRG-KA-30689

Builder

  • NameANANDAA VENTURES
  • Entity typePartnership Firm
  • GSTIN29ACCFA1171A1Z0
  • Authorized SignatoryMr. Bhanu Prakash Gummadi

Key dates

this monthRegisteredOct 2026PromisedSep 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on12 Oct 2026
  • Promised completion30 Sep 2030
  • Revised completionNone
  • Buildings7 building records
  • Documents filed105 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anandaa Aira Block 1---12012
Anandaa Aira Block 2---12012
Anandaa Aira Block 3---202
Anandaa Aira Block 4---14014
Anandaa Aira Block 5---10010
Anandaa Aira Block 6---303
Anandaa Aira Block 7---404

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 5 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities37

As on 5 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Outdoor Sports FacilityYes-
Indoor Sports FacilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackYes-
Water and SanitationYes-
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership9

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,378 sq m
Named landowners9
LandownerVillageDistrict
Smt Ravikala W/o Govindashetty and Family--
Sri. Nagaraja Shetty and Family--
Sri. H K Ashwath and Family--
Smt Ravikala W/o Govindashetty and Family--
Sri. Nagaraja Shetty and Family--
H K Ashwath--
Smt Ravikala W/o Govindashetty and Family--
Sri. Nagaraja Shetty and Family--
H K Ashwath--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 62.46 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 53.96 cr-
Payment of miscellaneous expenditureRs 2.00 cr-
On-site expenditure-Salaries of workersRs 1.50 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 1.50 cr-
Administrative CostsRs 1.50 cr-
On-site expenditure-Consultants FeesRs 1.00 cr-
On-site expenditure-Site OverheadRs 1.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBommu Veera Narendranath Reddy
EngineerChanakya N
Chartered AccountantKumar B T

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed105

As listed on the registration, under the names the promoter filed them with; the newest 80 of 105 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/121026/009011 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Query 2 - ANANDAA AIRAFile: Query 2 - ANANDAA AIRA.pdf5 Oct 2026
Area Statement Block WiseFile: 1 Area Statement Block Wise.pdf2 Oct 2026
Structural Stability Certificate - Anandaa AiraFile: 3 Structural Stability Certificate Ananda Aira.pdf2 Oct 2026
SBC Of SoilFile: 3 SBC Of Soil.pdf2 Oct 2026
Abstract Estimation Signed by EngineerFile: 4 Abstract Estimation Signed by Engineer.pdf2 Oct 2026
STP Drawing - Engineer CertifiedFile: 5 STP Drawing - Engineer Certified.pdf2 Oct 2026
Land Cost calculation - Anandaa AiraFile: 6 Land Cost calculation - Anandaa Aira.pdf2 Oct 2026
ADLR Sketch - Anandaa AiraFile: 6 ADLR Sketch - Anandaa Aira.pdf2 Oct 2026
Query Clarification - Anandaa AiraFile: Query Clarification - Anandaa Aira.pdf2 Oct 2026
RTC, survey 149/2-
Mutation, survey 149/2-
Encumbrance Certificate, survey 149/2-
Conversion/Alienation Order, survey 149/2-
JDA, survey 149/2-
Khatha, survey 149/2-
RTC, survey 149/3-
Mutation, survey 149/3-
Encumbrance Certificate, survey 149/3-
Conversion/Alienation Order, survey 149/3-
JDA, survey 149/3-
Khatha, survey 149/3-
RTC, survey 150/1-
Mutation, survey 150/1-
Encumbrance Certificate, survey 150/1-
Conversion/Alienation Order, survey 150/1-
JDA, survey 150/1-
Khatha, survey 150/1-
Registration CertificateFile: Firm Registrartion Certificate - Anandaa Aira_.pdf-
GST CertificateFile: GST Certificate - Anandaa Ventures_.pdf-
Partnership DeedFile: Partnership Deed -Anandaa Ventures_.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 CA Certificate - Anandaa Aira.pdf-
Certificate issued by Architect Form 2File: Form 2 Architect Certificate - Anandaa Aira.pdf-
Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate - Anandaa Aira.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation Affidavit - Anandaa Aira.pdf-
Balance Sheet 2024 - 2025File: Balancesheet Withn Schedules 2024-25.pdf-
Balance Sheet 2023 - 2024File: Balancesheet Withn Schedules 2023-24.pdf-
Audited Profit and Loss Statement 2024 - 2025File: Profit and Loss 2024-25.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Profit and Loss 2023-24.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: ITR 2024-25 - Anandaa Ventures.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR 2023-24 -Anandaa Ventures.pdf-
Approval letter - Anandaa Aira-
Approved Building Plan - Anandaa Aira-
Building Plan Third Floor and Section and Elevation-
Project Specification - Anandaa Aira-
Proforma of AOS - Anandaa Aira-
Allotment Letter - Anandaa Aira-
Form B Affidavit - Anandaa Aira-
Section 3(1) Affidavit - Anandaa Aira-
JDA Affidavit - Anandaa Aira-
Legal Opinion - Ananadaa Aira_-
BESCOM NOC - Anandaa Aira-
Water NOC - Anandaa Aira-
KSPCB NOC - Anandaa Aira_-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Legal Opinion - Ananadaa Aira_-
Sale Deed 3112-68-69 Sy No 149-
Pavathi MR 149-2,3-
Sale Deed 6768, Sy No 150-1-
Sy No 150-1 MR56-2008-09-
Release-Deed - Anandaa Aira-
JDA - ANANDAA AIRA-
GPA - ANANDAA AIRA-
Family Tree - Krishnappa Shetty-
krishnappa shetty Death certificate-
Govinda Shetty Death Certificate-
Akharband - Sy No 149-2-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep ANANDAA AIRA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmANANDAA AIRAOther 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: ANANDAA VENTURES

ANANDAA VENTURES has 1 registration on RERA Karnataka, including ANANDAA AIRA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if ANANDAA AIRA is delayed beyond 30 Sep 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ANANDAA AIRA?

The registered promoter entity is ANANDAA VENTURES, a partnership firm as per the filing. Its GSTIN 29ACCFA1171A1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ANANDAA AIRA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ANANDAA AIRA?

The professionals named in the filing: Architect: Bommu Veera Narendranath Reddy; Engineer: Chanakya N; Chartered Accountant: Kumar B T. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANDAA AIRA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANDAA AIRA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANDAA AIRA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.