Registration approved Residential/Group Housing project

Amina Residency

By ARSH CONSTRUCTION

RG-KA-61140 · RERA PRM/KA/RERA/1274/351/PR/200304/003319 · Last updated on RERA Karnataka portal: 19 Feb 2020

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Aug 2024Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 57 documents Report an error

Amina Residency is a Residential/Group Housing project by ARSH CONSTRUCTION in Uttara Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1274/351/PR/200304/003319 on 4 Mar 2020. Possession is promised by 22 Aug 2024. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameAmina Residency
  • TypeResidential/Group Housing
  • Location
    • Karwar
    • Uttara Kannada
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1274/351/PR/200304/003319
  • ReraGenie IDRG-KA-61140

Builder

  • NameARSH CONSTRUCTION
  • Entity typePartnership Firm
  • Authorized SignatoryMansoor Momin
  • OthersMansoor Momin, Nazma Momin
  • Other registrations4 more →

Key dates

this monthRegisteredMar 2020First promiseNov 2023Revised toAug 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on4 Mar 2020
  • Promised completion22 Aug 2024
  • Revised completionRevised to 22 Aug 2024 (originally 22 Nov 2023)
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Amina Residency---16016

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 19 Feb 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on 19 Feb 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area600 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.82 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionNov 2023 → Aug 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed57

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1274/351/PR/200304/003319 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Balance SheetFile: Balance sheet.pdf19 Feb 2020
Profit and LossFile: profit and loss.pdf19 Feb 2020
DeclarationFile: declaration.pdf27 Jan 2020
JOINT AFFIDAVIT CUM DECLARATIONFile: Amina Affidavit.pdf18 Jan 2020
Auditors ReportFile: Auditor’s Report.pdf18 Jan 2020
Plan licenseFile: amina permission.pdf18 Jan 2020
ecFile: encumbrances.pdf18 Jan 2020
power supplu nocFile: Power Supply Noc - Declaration .pdf18 Jan 2020
Balance SheetFile: balance sheet.pdf27 Dec 2019
Profit and lossFile: p&l.pdf27 Dec 2019
ITRFile: itr.pdf27 Dec 2019
EncumbrancesFile: EC.pdf27 Dec 2019
AffidavitFile: AFFIDAVIT.pdf27 Dec 2019
Power Supply nocFile: Power Supply Noc - Declaration .pdf27 Dec 2019
CertificateFile: COI.jpg-
building liecense-
LAYOUT (2)-
LAYOUT (2)-
Performa of sale deed-
Performa of Agreement for sale-
sale deed & khata-
LAYOUT (2)-
Area development-
Provisional Allotment Letter Format-
Brouchers declaration-
Project specification-
EC-
AFFIDAVIT-
JDA-
khata-
JDA-
LAYOUT (2)-
layout & project specification 2-
NA ORDER-
Balance Sheet 2018 - 2019File: Balance Sheet.pdf-
Balance Sheet 2017 - 2018File: Balance Sheet.pdf-
Balance Sheet 2016 - 2017File: Balance Sheet.pdf-
Audited Profit and Loss Statement 2018 - 2019File: P & L declaration.pdf-
Audited Profit and Loss Statement 2017 - 2018File: P & L declaration.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P & L declaration.pdf-
Director's Report 2018 - 2019File: Directos Report.pdf-
Director's Report 2017 - 2018File: Directos Report.pdf-
Director's Report 2016 - 2017File: Directos Report.pdf-
Cash Flow Statement 2018 - 2019File: Cash flow statement.pdf-
Cash Flow Statement 2017 - 2018File: Cash flow statement.pdf-
Auditor's Report 2018 - 2019File: Auditor’s Report.pdf-
Auditor's Report 2017 - 2018File: Auditor’s Report.pdf-
Auditor's Report 2016 - 2017File: Auditor’s Report.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITR declaration.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR declaration.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR declaration.pdf-
FORM B-
Prospectus/BrochureFile: brochure.pdf-
Advertisement Copy 1File: brochure.pdf-
Tower Excel SheetFile: PRM.xlsx-
Occupancy CertificateFile: OCCUPANCY CERTIFICATE.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: AFFIDAVIT.pdf-

How this compares with Uttara Kannada

22%of Uttara Kannada projects moved their completion datethis one moved by 9 months
0%of Uttara Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 100+ Uttara Kannada projects on ReraGenie, from their own filings.

Keep Amina Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Uttara Kannada100+ in Uttara Kannada

2 kmAmina ResidencyOther 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: ARSH CONSTRUCTION

ARSH CONSTRUCTION has 5 registrations on RERA Karnataka, including Radha Residency and Golden Orchid. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Uttara Kannada district page.

Frequently asked questions

What are my rights if Amina Residency is delayed beyond 22 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Amina Residency?

The registered promoter entity is ARSH CONSTRUCTION, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Amina Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in Amina Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amina Residency. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amina Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.