Home / Browse projects / Bengaluru Urban, Karnataka / ALN ARAMBH

Registration approved No litigation declared Residential/Group Housing project

ALN ARAMBH

By ALN Buildtech

RG-KA-11281 · RERA PRM/KA/RERA/1251/308/PR/020822/005115 · Last updated on RERA Karnataka portal: 19 Jul 2022

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Mar 2025Possession promisedno revision filed
1Complaints at RERA Karnatakaon this registration
Jump to the 129 documents Report an error

ALN ARAMBH is a Residential/Group Housing project by ALN Buildtech in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/020822/005115 on 2 Aug 2022. Possession is promised by 31 Mar 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameALN ARAMBH
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 560099
  • Pincode560099
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/020822/005115
  • ReraGenie IDRG-KA-11281

Builder

  • NameALN Buildtech
  • Entity typePartnership Firm
  • GSTIN29ABQFA2761H1Z4
  • Authorized SignatorySRIKANTH REDDY K

Key dates

this monthRegisteredAug 2022PromisedMar 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on2 Aug 2022
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed129 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ALN ARAMBH---24024

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 19 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 19 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area892 sq m
Named landowners3
LandownerVillageDistrict
SAMPANGI RAMAIAH--
SAMPANGI RAMAIAH--
SAMPANGI RAMAIAH--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.23 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 4.23 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR. RAHMAN BAIG
EngineerS MYTHILI
Chartered AccountantN. Naveenn & Associates

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01186/2024-ALN Buildtech19/11/2024

Documents filed129

As listed on the registration, under the names the promoter filed them with; the newest 80 of 129 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/020822/005115 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Agreement of Sale Proforma ALN BUILDTECHFile: Agreement of Sale Proforma ALN BUILDTECH.pdf19 Jul 2022
AMALGAMATED PLANFile: AMALGAMATED PLAN.pdf19 Jul 2022
AMALGAMATION ORDERFile: AMALGAMATION ORDER.pdf19 Jul 2022
APPROVED SITE PLANFile: APPROVED SITE PLAN.pdf19 Jul 2022
OLD PLOTS GPA refer Page 7 Serial No 21File: OLD PLOTS GPA refer Page 7 Serial No 21.pdf19 Jul 2022
OLD PLOTS JDA GPA SHARING AGREEMENTFile: OLD PLOTS JDA GPA SHARING AGREEMENT.pdf19 Jul 2022
OLD PLOTS JDA refer Page 7 Serial No 21File: OLD PLOTS JDA refer Page 7 Serial No 21.pdf19 Jul 2022
OLD PLOTS SHARING AGREEMENT SITE 11 12 13 page 11 or 21 Sr No 22File: OLD PLOTS SHARING AGREEMENT SITE 11 12 13 page 11 or 21 Sr No 22.pdf19 Jul 2022
Allotment FormFile: Allotment Form.pdf27 Jun 2022
ALN FINANCIALS WITH UDIN 2019-20File: ALN FINANCIALS WITH UDIN 2019-20.pdf27 Jun 2022
ALN FINANCIALS WITH UDIN 2020-21File: ALN FINANCIALS WITH UDIN 2020-21.pdf27 Jun 2022
ALN_AREA STATEMENTFile: ALN_AREA STATEMENT.pdf27 Jun 2022
Amalgamation Orders and SketchFile: Amalgamation Orders and Sketch.pdf27 Jun 2022
BROCHURE DECLARATIONFile: BROCHURE DECLARATION.pdf27 Jun 2022
KHATAFile: KHATA.pdf27 Jun 2022
STP Report on PHE and Allied ServicesFile: STP Report on PHE and Allied Services.pdf27 Jun 2022
ALN_APARTMENT_GROUND FLOOR_ PLUMBING DETAILSFile: ALN_APARTMENT_GROUND FLOOR_ PLUMBING DETAILS.pdf27 Jun 2022
ALN_APARTMENT_SITE PLAN DETAILSFile: ALN_APARTMENT_SITE PLAN DETAILS.pdf27 Jun 2022
ALN_APARTMENT_STILT FLOOR_ PLUMBING DETAILSFile: ALN_APARTMENT_STILT FLOOR_ PLUMBING DETAILS.pdf27 Jun 2022
ALN_APARTMENT_SUMP TANK DETAILSFile: ALN_APARTMENT_SUMP TANK DETAILS.pdf27 Jun 2022
Water demand-WD-R0-13-05-2022File: Water demand-WD-R0-13-05-2022.pdf27 Jun 2022
BESCOM NOCFile: BESCOM NOC.jpeg27 Jun 2022
WATER NOCFile: WATER NOC.jpeg27 Jun 2022
ALN AREA STATEMENTFile: ALN AREA STATEMENT.xlsx27 Jun 2022
LAND DOCUMENTS 1File: LAND DOCUMENTS 1.pdf27 Jun 2022
LAND DOCUMENTS 2File: LAND DOCUMENTS 2.pdf27 Jun 2022
LAND DOCUMENTS 3File: LAND DOCUMENTS 3.pdf27 Jun 2022
RTC, survey 11-
Mutation, survey 11-
Encumbrance Certificate, survey 11-
Conversion/Alienation Order, survey 11-
JDA, survey 11-
Khatha, survey 11-
RTC, survey 12-
Mutation, survey 12-
Encumbrance Certificate, survey 12-
Conversion/Alienation Order, survey 12-
JDA, survey 12-
Khatha, survey 12-
RTC, survey 13-
Mutation, survey 13-
Encumbrance Certificate, survey 13-
Conversion/Alienation Order, survey 13-
JDA, survey 13-
Khatha, survey 13-
Registration CertificateFile: ALN Buildtech Registration.pdf-
Partnership DeedFile: NEW PARTNERSHIP DEED.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: FORM 1.pdf-
Certificate issued by Architect Form 2File: FORM 2.pdf-
Certificate issued by Engineer Form 3File: FORM 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NO LITIGATION AFFIDAVIT.pdf-
Certificate from Chartered AccountFile: FORM 1.pdf-
Balance Sheet 2020 - 2021File: Certified Financials ALN Buildtech.pdf-
Balance Sheet 2019 - 2020File: Certified Financials ALN Buildtech.pdf-
Balance Sheet 2018 - 2019File: Certified Financials ALN Buildtech.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Certified Financials ALN Buildtech.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Certified Financials ALN Buildtech.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Certified Financials ALN Buildtech.pdf-
Director's Report 2020 - 2021File: Certified Financials ALN Buildtech.pdf-
Director's Report 2019 - 2020File: Certified Financials ALN Buildtech.pdf-
Director's Report 2018 - 2019File: Certified Financials ALN Buildtech.pdf-
Cash Flow Statement 2020 - 2021File: Certified Financials ALN Buildtech.pdf-
Cash Flow Statement 2019 - 2020File: Certified Financials ALN Buildtech.pdf-
Auditor's Report 2020 - 2021File: Certified Financials ALN Buildtech.pdf-
Auditor's Report 2019 - 2020File: Certified Financials ALN Buildtech.pdf-
Auditor's Report 2018 - 2019File: Certified Financials ALN Buildtech.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: Certified Financials ALN Buildtech.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 20 21.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITR 19 20.pdf-
LICENSE-
BESCOM NOC-
WATER NOC-
Plans Altogether-
Plan 1-
Plan 2-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep ALN ARAMBH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmALN ARAMBHOther 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 42 registered projects within 2 km.

Builder: ALN Buildtech

ALN Buildtech has 1 registration on RERA Karnataka, including ALN ARAMBH. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if ALN ARAMBH is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ALN ARAMBH?

The registered promoter entity is ALN Buildtech, a partnership firm as per the filing. Its GSTIN 29ABQFA2761H1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ALN ARAMBH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ALN ARAMBH?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at ALN ARAMBH?

The professionals named in the filing: Architect: AR. RAHMAN BAIG; Engineer: S MYTHILI; Chartered Accountant: N. Naveenn & Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ALN ARAMBH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ALN ARAMBH. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ALN ARAMBH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.