Registration approved No litigation declared Residential/Group Housing project

Adarsh Welkin Park Villas

By Adarsh Developers

RG-KA-08982 · RERA PRM/KA/RERA/1251/308/PR/020923/006224 · Last updated on RERA Karnataka portal: 31 Jan 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Oct 2027Possession promisedno revision filed
18 of 115Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 225 documents Report an error

Adarsh Welkin Park Villas is a Residential/Group Housing project by Adarsh Developers in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/020923/006224 on 2 Sep 2023. Possession is promised by 31 Oct 2027. 97 of the 115 units on this registration are recorded sold or booked.

At a glance

Project

  • NameAdarsh Welkin Park Villas
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 560099
  • Pincode560099
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/020923/006224
  • ReraGenie IDRG-KA-08982

Builder

  • NameAdarsh Developers
  • Entity typePartnership Firm
  • GSTIN29AAGFA3674G1ZC
  • Authorized SignatoryB M Jayeshankar
  • Other registrations5 more →
  • Declared earlier projects8 →

Key dates

this monthRegisteredSep 2023PromisedOct 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on2 Sep 2023
  • Promised completion31 Oct 2027
  • Revised completionNone
  • Buildings174 building records
  • Documents filed225 files

Current status

84%97 of 115 units booked

Figures as on 31 Jan 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Villa No 1---101
Villa No 2---101
Villa No 3---101
Villa No 4---101
Villa No 5---101
Villa No 6---101
Villa No 7---101
Villa No 8---101
Villa No 9---101
Villa No 10---101
Villa No 11---101
Villa No 12---101
Villa No 13---101
Villa No 14---101
Villa No 15---101
Villa No 16---101
Villa No 17---101
Villa No 18---101
Villa No 19---101
Villa No 20---101
Villa No 21---101
Villa No 22---101
Villa No 23---101
Villa No 24---101
Villa No 25---101
Villa No 26---101
Villa No 27---101
Villa No 28---101
Villa No 29---101
Villa No 30---101
Villa No 31---101
Villa No 32---101
Villa No 33---101
Villa No 34---101
Villa No 35---101
Villa No 36---101
Villa No 37---101
Villa No 38---101
Villa No 39---101
Villa No 40---101
Villa No 41---101
Villa No 42---101
Villa No 43---101
Villa No 44---101
Villa No 45---101
Villa No 46---101
Villa No 47---101
Villa No 48---101
Villa No 49---101
Villa No 50---101
Villa No 51---101
Villa No 52---101
Villa No 53---101
Villa No 54---101
Villa No 55---101
Villa No 56---101
Villa No 57---101
Villa No 58---101
Villa No 59---101
Villa No 60---101
Villa No 61---101
Villa No 62---101
Villa No 63---101
Villa No 64---101
Villa No 65---101
Villa No 66---101
Villa No 67---101
Villa No 68---101
Villa No 69---101
Villa No 70---101
Villa No 71---101
Villa No 72---101
Villa No 73---101
Villa No 74---101
Villa No 75---101
Villa No 76---101
Villa No 77---101
Villa No 78---101
Villa No 79---101
Villa No 80---101
Villa No 81---101
Villa No 82---101
Villa No 83---101
Villa No 84---101
Villa No 85---101
Villa No 86---101
Villa No 87---101
Villa No 88---101
Villa No 89---101
Villa No 90---101
Villa No 91---101
Villa No 92---101
Villa No 93---101
Villa No 94---101
Villa No 95---101
Villa No 96---101
Villa No 97---101
Villa No 98---101
Villa No 99---101
Villa No 100---101
Villa No 101---101
Villa No 102---101
Villa No 103---101
Villa No 104---101
Villa No 105---101
Villa No 106---101
Villa No 107---101
Villa No 108---101
Villa No 109---101
Villa No 110---101
Villa No 111---101
Villa No 112---101
Villa No 113---101
Villa No 114---101
Villa No 115---101
Villa No 116---101
Villa No 117---101
Villa No 118---101
Villa No 119---101
Villa No 120---101
Villa No 121---101
Villa No 122---101
Villa No 123---101
Villa No 124---101
Villa No 125---101
Villa No 126---101
Villa No 127---101
Villa No 128---101
Villa No 129---101
Villa No 130---101
Villa No 131---101
Villa No 132---101
Villa No 133---101
Villa No 134---101
Villa No 135---101
Villa No 136---101
Villa No 137---101
Villa No 138---101
Villa No 139---101
Villa No 140---101
Villa No 141---101
Villa No 142---101
Villa No 143---101
Villa No 144---101
Villa No 145---101
Villa No 146---101
Villa No 147---101
Villa No 148---101
Villa No 149---101
Villa No 150---101
Villa No 151---101
Villa No 152---101
Villa No 153---101
Villa No 154---101
Villa No 155---101
Villa No 156---101
Villa No 157---101
Villa No 158---101
Villa No 159---101
Villa No 160---101
Villa No 161---101
Villa No 162---101
Villa No 163---101
Villa No 164---101
Villa No 165---101
Villa No 166---101
Villa No 167---101
Villa No 168---101
Villa No 169---101
Villa No 170---101
Villa No 171---101
Villa No 172---101
Villa No 173---101
Villa No 174---101

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 31 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 31 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership7

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area91,517 sq m
Named landowners7
LandownerVillageDistrict
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Jayeshankar--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 312.60 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 247.57 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 42.00 cr-
On-site expenditure-Salaries of workersRs 14.60 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 3.57 cr-
On-site expenditure-Site OverheadRs 3.54 cr-
On-site expenditure-Consultants FeesRs 1.25 cr-
RERA FEERs 5.00 lakh-
RERA MODIFICATION FEERs 2.50 lakh-
Payment of chargesRs 6,800-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectK Anjali
EngineerRAJESH N T
Chartered AccountantMahesh B S

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed225

As listed on the registration, under the names the promoter filed them with; the newest 80 of 225 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/020923/006224 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Welkinpark Villas_merged.pdf31 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Welkinpark Villas.pdf31 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Eng Welkinpark Villas.pdf31 Jan 2026
1) Escrow Acc confirmation letterFile: Escrow Acc confirmation letter.pdf25 Aug 2023
2A) Partition Deed Doc No.32054/2005-06File: Partition deed- 32054-2004-05_compressed.pdf25 Aug 2023
2A) MR 2-2009-10 (23 _ 24)File: MR 2-2009-10 (23 _ 24).pdf25 Aug 2023
2B) MR 35-2010-11 (213File: MR 35-2010-11 (213.pdf25 Aug 2023
2C) MR 15-2011-12 (214File: MR 15-2011-12 (214.pdf25 Aug 2023
3) Relinquishment Deed- 2334-2017-18File: Relinquishment Deed- 2334-2017-18.pdf25 Aug 2023
3) Site PlanFile: Site Plan_compressed.pdf25 Aug 2023
4) Plan, Section & Elevation - Block 7 & Block 8File: Plan, Sectio & Elevation - Block 7 & Block 8.pdf25 Aug 2023
Plan, Section & Elevation - Block 9 & Block 10File: Plan, Section & Elevation - Block 9 & Block 10.pdf25 Aug 2023
Plan, Section & Elevation - Block 11 & Block 12File: Plan, Sectio & Elevation - Block 11 & Block 12.pdf25 Aug 2023
Plan, Section & Elevation - Block13 & Block 14File: Plan, Sectio & Elevation - Block13 & Block 14.pdf25 Aug 2023
Plan, Sectio & Elevation - Block 15 & Block 16File: Plan, Sectio & Elevation - Block 15 & Block 16.pdf25 Aug 2023
Plan, Sectio & Elevation - Block 17 & Block 18File: Plan, Sectio & Elevation - Block 17 & Block 18.pdf25 Aug 2023
PARTITION DEED- 7531-1974-75File: PARTITION DEED- 7531-1974-75.pdf3 Aug 2023
Order No 8-1959-60File: Order No 8-1959-60.pdf3 Aug 2023
PARTITION DEED-32054-2005-06File: PARTITION DEED-32054-2005-06_compressed.pdf3 Aug 2023
Approved typical sections & ElevationsFile: Approved typical sections & Elevations.pdf3 Aug 2023
Ground ,First & terrace floor plan(Block 7 & 8)File: scan0218.pdf3 Aug 2023
Elevation section(Block 9 & 10)File: scan0219.pdf3 Aug 2023
Ground ,First & terrace floor plan(Block 11 & 12)File: scan0220.pdf3 Aug 2023
Ground ,First & terrace floor plan(Block 13 & 14)File: scan0221.pdf3 Aug 2023
Ground ,First & terrace floor plan(Block 15 & 16)File: scan0222.pdf3 Aug 2023
Ground ,First & terrace floor plan(Block 17 & 18)File: scan0223.pdf3 Aug 2023
Site PlanFile: Site Plan For Rera ADARSH WELKIN PARK VILLAS.pdf3 Aug 2023
BDA Letter For DPFile: BDA Letter For DP.pdf3 Aug 2023
AD BS 19-20File: AD BS 19-20.pdf14 Jul 2023
Adarsh Developers FY 2020-21File: Adarsh Developers FY 2020-21.pdf14 Jul 2023
Adarsh Developers BS FY 2021-22File: Adarsh Developers BS FY 2021-22.pdf14 Jul 2023
Attested panFile: Attested PAN.pdf14 Jul 2023
APM Annexe Registrration cancellation docFile: APM Annexe cancellation doc.pdf14 Jul 2023
Adarsh premia phase 1 - FORM 7File: 10 Form 7 Premia.pdf14 Jul 2023
Affidavit- Non LitigationFile: Affidavit- Non Litigation.pdf14 Jul 2023
RTC- 2000-01 to 2022-23 (23File: RTC- 2000-01 to 2022-23 (23.pdf14 Jul 2023
RTC- 2000-01 to 2022-23 (66File: RTC- 2000-01 to 2022-23 (66.pdf14 Jul 2023
RTC- 2000-01 to 2022-23 (196File: RTC- 2000-01 to 2022-23 (196.pdf14 Jul 2023
RTC- 2000-01 to 2022-23 (198File: RTC- 2000-01 to 2022-23 (198.pdf14 Jul 2023
RTC- 2000-01 to 2022-23 (199File: RTC- 2000-01 to 2022-23 (199.pdf14 Jul 2023
RTC- 2000-01 to 2022-23 (204File: RTC- 2000-01 to 2022-23 (204.pdf14 Jul 2023
RTC- 2000-01 to 2022-23 (214File: RTC- 2000-01 to 2022-23 (214.pdf14 Jul 2023
RTC- 2014-15 to 2022-23 (18File: RTC- 2014-15 to 2022-23 (18.pdf14 Jul 2023
RTC- 2014-15 to 2022-23 (20File: RTC- 2014-15 to 2022-23 (20.pdf14 Jul 2023
RTC- 2014-15 to 2022-23 (24File: RTC- 2014-15 to 2022-23 (24.pdf14 Jul 2023
Typical Villa sectionsFile: Villa Section-REV PART A LAYOUT BLOCK 28 & 29 ON 25-11-19-Model.pdf14 Jul 2023
Building LicenseFile: Building Licence- 27-2021-22.pdf14 Jul 2023
Demarcation PlanFile: Adarsh Welkin Park Villas Area- Demarcation.pdf14 Jul 2023
Project specificationFile: Approved specification - Villa.pdf14 Jul 2023
Agreement for saleFile: AFS-Adarsh Welkin Park Villas.pdf14 Jul 2023
Allotment letterFile: ADARSH WELKIN PARK VILLA- ALLOTMENT LETTER .pdf14 Jul 2023
STP - Flow chartFile: STP Flow Chart.jpg14 Jul 2023
RTC, survey 18(P)-
Mutation, survey 18(P)-
Encumbrance Certificate, survey 18(P)-
Conversion/Alienation Order, survey 18(P)-
JDA, survey 18(P)-
Khatha, survey 18(P)-
RTC, survey 19-
Mutation, survey 19-
Encumbrance Certificate, survey 19-
Conversion/Alienation Order, survey 19-
JDA, survey 19-
Khatha, survey 19-
RTC, survey 20(P)-
Mutation, survey 20(P)-
Encumbrance Certificate, survey 20(P)-
Conversion/Alienation Order, survey 20(P)-
JDA, survey 20(P)-
Khatha, survey 20(P)-
RTC, survey 23-
Mutation, survey 23-
Encumbrance Certificate, survey 23-
Conversion/Alienation Order, survey 23-
Khatha, survey 23-
RTC, survey 24-
Mutation, survey 24-
Encumbrance Certificate, survey 24-
Conversion/Alienation Order, survey 24-
JDA, survey 24-

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 not delivered by the promised date1 under way, not due yet
ProjectLocationStatusPromisedDelivered
Adarsh Lake Reserva Phase 1SY. NO.32/1, 32/3 & 32/4 OF PUTTENAHALLI VILLAGE, UTTARHALLI HOBLI, BENGALURU SOUTH, BENGALURU URBANOngoingDec 2027Not due yet
Adarsh Crest Phase1SY.NO.25/1,WARD NO.07,KHATHA NO.278/331, OF KEMPAPURA VILLAGE, YELHANKA HOBLI,, BENGALURU EAST, BENGALURU URBANOngoingDec 2025Not delivered
Adarsh Stratuss Phase 1KHATA NO.1224,SURVEY NO 18 / 2A / 1, SARAKKIKERE VILLAGE UTTARAHALLI HOBLI , WARD NO 187.BANGALOREOngoingNov 2024Not delivered
Adarsh AstriaSy No 60,61/1, Kadirenahalli Main Subramanyapura main road, Bangalore Ward no 55OngoingNov 2023Not delivered

How this compares with Bengaluru Urban

84%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Adarsh Welkin Park Villas on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmAdarsh Welkin Park VillaOther 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 47 registered projects within 2 km.

Builder: Adarsh Developers

Adarsh Developers has 6 registrations on RERA Karnataka, including Adarsh Welkin Park Villas and Adarsh Premia - Phase 1. Its filings declare 8 earlier projects, none of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Adarsh Welkin Park Villas is delayed beyond 31 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Adarsh Welkin Park Villas?

The registered promoter entity is Adarsh Developers, a partnership firm as per the filing. Its GSTIN 29AAGFA3674G1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Adarsh Welkin Park Villas?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Adarsh Welkin Park Villas?

The professionals named in the filing: Architect: K Anjali; Engineer: RAJESH N T; Chartered Accountant: Mahesh B S. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Adarsh Welkin Park Villas?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Adarsh Welkin Park Villas. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Adarsh Welkin Park Villas to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.