ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / AATMIYA SELENITE

Valid until 30 Apr 2027 Residential/Group Housing project

AATMIYA SELENITE

By SANMITA REALTY PRIVATE LIMITED

RG-GJ-17016 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA11011/061222 · Last updated on GujRERA portal: 18 Oct 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2027Possession promisedno revision filed
17 of 18Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 90%
44 of 80Units unsoldnot recorded sold or booked
Jump to the 38 documents Report an error

AATMIYA SELENITE is a Residential/Group Housing project by SANMITA REALTY PRIVATE LIMITED in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA11011/061222 on 6 Dec 2022. Possession is promised by 30 Apr 2027. 36 of the 80 units on this registration are recorded sold or booked, and 17 of 18 construction stages are filed complete.

At a glance

Project

  • NameAATMIYA SELENITE
  • TypeResidential/Group Housing
  • Location
    • Aatmiya Selenite
    • B/h labh Icon
    • Nr Bansal Mall
    • Nilamber Circle
    • GERI Compound Road
    • Gotri
    • Vadodara-390021
    • Vadodara
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA11011/061222
  • ReraGenie IDRG-GJ-17016

Builder

  • NameSANMITA REALTY PRIVATE LIMITED
  • Entity typeCOMPANY
  • Other registrations3 more →

Key dates

this monthRegisteredDec 2022PromisedApr 2027

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2027
  • Registered on6 Dec 2022
  • Promised completion30 Apr 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed38 files

Current status

45%36 of 80 units booked
96.5%Of the estimated cost spent so far

Figures as on 18 Oct 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER-A---40040
TOWER-S---40040

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building2

As on 18 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

TOWER-A99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TOWER-S100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities23

As on 18 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes50%
Sewerage (chamber, lines, septic tank, STP)NoNot applicable
Storm water drainsNoNot applicable
Landscaping and tree plantingYes0%
Street lightingYes100%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable
Compound wallYes100%
Plinth protectionNoNot applicable
Water tankYes100%
Other requirementsNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,849 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 18.00 cr
Cost incurredRs 17.36 cr
Spent of the estimate96.46%
BuildingWingEstimatedIncurred
TOWER-ANARs 9.00 crRs 8.50 cr
TOWER-SNARs 9.00 crRs 8.86 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHarsh Pandya
EngineerChirag A Shah

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA11011/061222 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)18 Oct 2024
Engineer's certificate annexure18 Oct 2024
RERA registration certificate6 Dec 2022
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

45%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep AATMIYA SELENITE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vadodara2,900+ in Vadodara

2 kmAATMIYA SELENITEOther 344Dot size: filed unitsN

Filed coordinates, straight-line distance. 344 registered projects within 2 km.

Builder: SANMITA REALTY PRIVATE LIMITED

SANMITA REALTY PRIVATE LIMITED has 4 registrations on GujRERA, including AATMIYA SIGNATURE and AATMIYA SELENITE. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if AATMIYA SELENITE is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of AATMIYA SELENITE?

The registered promoter entity is SANMITA REALTY PRIVATE LIMITED, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in AATMIYA SELENITE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at AATMIYA SELENITE?

The professionals named in the filing: Architect: Harsh Pandya; Engineer: Chirag A Shah. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AATMIYA SELENITE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AATMIYA SELENITE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AATMIYA SELENITE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.