Valid until 30 Dec 2023 Residential/Group Housing project

AADHYA HOMES

By DINESHBHAIAMBALALPATEL PROPRIETOR OF AADHYAHOMES

RG-GJ-48267 · RERA PR/GJ/ANAND/UMRETH/Others/RAA06024/A1R/030620 · Last updated on GujRERA portal: 6 May 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Dec 2023Possession promisedno revision filed
0 of 36Construction stages doneacross 4 buildings; furthest along: Excavation, 72%
23 of 25Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

AADHYA HOMES is a Residential/Group Housing project by DINESHBHAIAMBALALPATEL PROPRIETOR OF AADHYAHOMES in Anand, Gujarat, registered with GujRERA as PR/GJ/ANAND/UMRETH/Others/RAA06024/A1R/030620 on 12 Sep 2019. Possession is promised by 30 Dec 2023. 2 of the 25 units on this registration are recorded sold or booked, and 0 of 36 construction stages are filed complete.

At a glance

Project

  • NameAADHYA HOMES
  • TypeResidential/Group Housing
  • Location
    • FATAK NO 24
    • NEAR RAILWAY STATION
    • Umreth
    • Anand
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/ANAND/UMRETH/Others/RAA06024/A1R/030620
  • ReraGenie IDRG-GJ-48267

Builder

  • NameDINESHBHAIAMBALALPATEL PROPRIETOR OF AADHYAHOMES
  • Entity typeIndividual/Propritorship

Key dates

this monthRegisteredSep 2019PromisedDec 2023

Key facts

Registration and timeline

  • StatusValid until 30 Dec 2023
  • Registered on12 Sep 2019
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed44 files

Current status

8%2 of 25 units booked
16.0%Of the estimated cost spent so far

Figures as on 6 May 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---404
A1---505
B---808
B1---808

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 6 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 72%.

A0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
A156%
ActivityProgress
Excavation72%
Podiums (if any)Not applicable
Plinth72%
Stilt Floor0%
Slabs of Super Structure72%
Internal walls, internal plaster, floorings, doors and windows within flats58%
Sanitary fittings within the flats58%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks58%
External plumbing and external plaster, elevation, completion of terraces with waterproofing58%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing58%
B7%
ActivityProgress
Excavation10%
Podiums (if any)Not applicable
Plinth13%
Stilt Floor0%
Slabs of Super Structure13%
Internal walls, internal plaster, floorings, doors and windows within flats10%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks7%
External plumbing and external plaster, elevation, completion of terraces with waterproofing7%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
B17%
ActivityProgress
Excavation10%
Podiums (if any)Not applicable
Plinth13%
Stilt Floor0%
Slabs of Super Structure13%
Internal walls, internal plaster, floorings, doors and windows within flats10%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks7%
External plumbing and external plaster, elevation, completion of terraces with waterproofing7%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 6 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes35%
Water supplyYes5%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes5%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes20%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,911 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.61 cr
Cost incurredRs 41.78 lakh
Spent of the estimate16.03%
BuildingWingEstimatedIncurred
ANARs 65.17 lakh-
A1NARs 65.17 lakh-
BNARs 65.17 lakhRs 20.89 lakh
B1NARs 65.17 lakhRs 20.89 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRAN PATEL
EngineerVINODBHAI C PRAJAPATI

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/ANAND/UMRETH/Others/RAA06024/A1R/030620 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)6 May 2024
Engineer's certificate annexure6 May 2024
Accountant's certificate (Form 3)6 May 2024
Architect's certificate (Form 1)13 Mar 2024
Site photograph, A5 Mar 2024
Site photograph, A15 Mar 2024
Site photograph, B5 Mar 2024
Site photograph, B15 Mar 2024
RERA registration certificate12 Sep 2019
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Anand

8%of this project is bookeddistrict median 57%
17%of Anand projects moved their completion datethis one has not

Computed across the 310+ Anand projects on ReraGenie, from their own filings.

Keep AADHYA HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Umreth310+ in Anand

2 kmAADHYA HOMESOther 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: DINESHBHAIAMBALALPATEL PROPRIETOR OF AADHYAHOMES

DINESHBHAIAMBALALPATEL PROPRIETOR OF AADHYAHOMES has 1 registration on GujRERA, including AADHYA HOMES. Read the full track record. See more projects on the Anand district page.

Frequently asked questions

What are my rights if AADHYA HOMES is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of AADHYA HOMES?

The registered promoter entity is DINESHBHAIAMBALALPATEL PROPRIETOR OF AADHYAHOMES, an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in AADHYA HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at AADHYA HOMES?

The professionals named in the filing: Architect: KIRAN PATEL; Engineer: VINODBHAI C PRAJAPATI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AADHYA HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AADHYA HOMES. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AADHYA HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.