ReraGenieLog inGet a buyer report

Home / Browse projects / Vadodara, Gujarat / ZAM ZAM TOWER

Valid until 30 Apr 2028 Residential/Group Housing project

ZAM ZAM TOWER

By GLOBAL DEVELOPERS

RG-GJ-77937 · RERA PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN150AA10050/100822 · Last updated on GujRERA portal: 1 Oct 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2028Possession promisedno revision filed
5 of 9Construction stages donefurthest along: Stilt Floor, 99%
71 of 175Units unsoldnot recorded sold or booked
Jump to the 21 documents Report an error

ZAM ZAM TOWER is a Residential/Group Housing project by GLOBAL DEVELOPERS in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN150AA10050/100822 on 10 Aug 2022. Possession is promised by 30 Apr 2028. 104 of the 175 units on this registration are recorded sold or booked, and 5 of 9 construction stages are filed complete.

At a glance

Project

  • NameZAM ZAM TOWER
  • TypeResidential/Group Housing
  • Location
    • FP NO. 61/1
    • TP NO. 26
    • RS NO. 311
    • TANDALJA
    • VADODARA
    • TANDALJA
    • Vadodara
    • 390012
  • Pincode390012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN150AA10050/100822
  • ReraGenie IDRG-GJ-77937

Builder

  • NameGLOBAL DEVELOPERS
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredAug 2022PromisedApr 2028

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2028
  • Registered on10 Aug 2022
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed21 files

Current status

59%104 of 175 units booked
81.4%Of the estimated cost spent so far

Figures as on 1 Oct 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower AB---1750175

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 1 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 9 construction stages are filed complete. The stage furthest along is Stilt Floor, at 99%.

Tower AB: 98% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor99%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats99%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing80%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing99%

Progress on shared amenities23

As on 1 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes90%
Water supplyYes90%
Sewerage (chamber, lines, septic tank, STP)Yes90%
Storm water drainsYes90%
Landscaping and tree plantingYes90%
Street lightingYes90%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%
Compound wallYes90%
Plinth protectionYes90%
Water tankYes90%
Other requirementsYes90%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,299 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 21.50 cr
Cost incurredRs 17.50 cr
Spent of the estimate81.4%
BuildingWingEstimatedIncurred
Tower ABNARs 21.50 crRs 17.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRENIK RAJENDRAKUMAR SONI
EngineerRANJIT NARAYANBHAI RAJPUT

Documents filed21

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Vadodara Municipal Corporation/RN150AA10050/100822 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)1 Oct 2024
Engineer's certificate annexure1 Oct 2024
RERA registration certificate10 Aug 2022
Proforma agreement for sale-
Project specific document-
Drainage affidavit-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Proforma sale deed-
Project photograph-

How this compares with Vadodara

59%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep ZAM ZAM TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near TANDALJA2,900+ in Vadodara

2 kmZAM ZAM TOWEROther 384Dot size: filed unitsN

Filed coordinates, straight-line distance. 384 registered projects within 2 km.

Builder: GLOBAL DEVELOPERS

GLOBAL DEVELOPERS has 1 registration on GujRERA, including ZAM ZAM TOWER. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if ZAM ZAM TOWER is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of ZAM ZAM TOWER?

The registered promoter entity is GLOBAL DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in ZAM ZAM TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ZAM ZAM TOWER?

The professionals named in the filing: Architect: SHRENIK RAJENDRAKUMAR SONI; Engineer: RANJIT NARAYANBHAI RAJPUT. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ZAM ZAM TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ZAM ZAM TOWER. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ZAM ZAM TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.