Red flags

  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Oct 2023Possession promisedmoved 21 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 84 documents Report an error

URBAN VILLE is a Residential/Group Housing project by Mohak Properties in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/410/PR/200304/003325 on 4 Mar 2020. Possession is promised by 10 Oct 2023. The completion date has moved by 21 months from the original filing.

At a glance

Project

  • NameURBAN VILLE
  • TypeResidential/Group Housing
  • Location
    • Dharwad
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1259/410/PR/200304/003325
  • ReraGenie IDRG-KA-06464

Builder

  • NameMohak Properties
  • Entity typePartnership Firm
  • Authorized SignatoryVINAY VISHWANATH JARTARGHAR
  • OthersVINAY VISHWANATH JARTARGHAR, VISHWANATH RAMASA JARTARGHAR

Key dates

this monthRegisteredMar 2020First promiseJan 2022Revised toOct 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on4 Mar 2020
  • Promised completion10 Oct 2023
  • Revised completionRevised to 10 Oct 2023 (originally 10 Jan 2022)
  • Buildings1 building record
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
URBAN VILLE---808

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 26 Feb 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on 26 Feb 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area530 sq m
Named landowners1
LandownerVillageDistrict
NANDIKESHWAR BASAVARAJ YADAWAD--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.26 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVINAYAK PATIL
EngineerB MAHESH

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJan 2022 → Oct 2022

No reason recorded in the filing

EX/PRM/KA/RERA/1259/410/PR/230329/003325Oct 2022 → Oct 2023

Reason as filed by the promoterFinancial crunch

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed84

As listed on the registration, under the names the promoter filed them with; the newest 80 of 84 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/410/PR/200304/003325 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Balance sheet 17-18File: BALANCE SHEET 17-18 UDIN.pdf26 Feb 2020
Balance sheet 18-19File: BALANCE SHEET 18-19 UDIN.pdf26 Feb 2020
P & L Account 17-18File: P & l 17-18 UDIN.pdf26 Feb 2020
P & L Account 18-19File: P & L 18-19 UDIN.pdf26 Feb 2020
Fire permissionFile: FIRE PERMISSION.pdf26 Feb 2020
Hescom permissionFile: HESCOM NOC.pdf26 Feb 2020
gift deedFile: GIFT DEED1.pdf28 Jan 2020
gift deedFile: GIFTDEED.pdf28 Jan 2020
fee receiptFile: RERA fee payment receipt.pdf28 Jan 2020
form bFile: AFFIDAVIT FORM B.pdf28 Jan 2020
joint venture affidavitFile: AFFIDAVIT JOINT VENTURE.pdf28 Jan 2020
encumbranceFile: ENCUMBRANCE.pdf28 Jan 2020
project specificationsFile: PROJECT SPECIFICATIONS.pdf28 Jan 2020
audit reportFile: AUDIT REPORT.pdf28 Jan 2020
section 3File: AFFIDAVIT SECTION 3.pdf28 Jan 2020
Architect Certificate for Work Completion Schedule till DateFile: FORM 5 ARCHITECH Q2 22-23.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form -6, Engineer Q2 22-23.pdf-
Architect Certificate for Pending Work Completion Schedule.File: FORM 5 ARCHITECH Q2 22-23.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form -6, Engineer Q2 22-23.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
BUILDING PERMISSION-
APPROVED PLAN-
SECTIONAL PLAN-
Sale-Deed format-
Agreement_for_Sale_of_RERA-
GIFT DEED1-
SECTIONAL PLAN-
APPROVED PLAN-
Proforma of allotment letter-
BROCHURE-
PROJECT SPECIFICATIONS-
ENCUMBRANCE-
PROPERTY CARD-
PROPERTY CARD-
corporation ASSESSMENT-
JOINT DEVELOPMENT AGREEMENT-
PROPERTY CARD-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
map-
SECTIONAL PLAN-
corporation ASSESSMENT-
LEGAL OPINION-
Balance Sheet 2018 - 2019File: BALANCE SHEET 19-20.pdf-
Balance Sheet 2017 - 2018File: BALANCE SHEET 18-19.pdf-
Balance Sheet 2016 - 2017File: BALANCE SHEET 17-18.pdf-
Audited Profit and Loss Statement 2018 - 2019File: P & L 19-20.pdf-
Audited Profit and Loss Statement 2017 - 2018File: P & L 18-19.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P & L 17-18.pdf-
Director's Report 2018 - 2019File: DIRECTORS REPORT.pdf-
Director's Report 2017 - 2018File: DIRECTORS REPORT.pdf-
Director's Report 2016 - 2017File: DIRECTORS REPORT.pdf-
Cash Flow Statement 2018 - 2019File: CASH FLOW STATEMENT.pdf-
Cash Flow Statement 2017 - 2018File: CASH FLOW STATEMENT.pdf-
Auditor's Report 2018 - 2019File: AUDIT REPORT.pdf-
Auditor's Report 2017 - 2018File: AUDIT REPORT.pdf-
Auditor's Report 2016 - 2017File: AUDIT REPORT.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITR 19-20.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR 18-19.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 17-18.pdf-

How this compares with Dharwad

29%of Dharwad projects moved their completion datethis one moved by 21 months
0%of Dharwad registrations are shown as withdrawn or revokedthis one is not

Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.

Keep URBAN VILLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dharwad250+ in Dharwad

2 kmURBAN VILLEOther 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: Mohak Properties

Mohak Properties has 1 registration on RERA Karnataka, including URBAN VILLE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dharwad district page.

Frequently asked questions

What are my rights if URBAN VILLE is delayed beyond 10 Oct 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of URBAN VILLE?

The registered promoter entity is Mohak Properties, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in URBAN VILLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at URBAN VILLE?

The professionals named in the filing: Architect: VINAYAK PATIL; Engineer: B MAHESH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in URBAN VILLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About URBAN VILLE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save URBAN VILLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.