Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2027Possession promisedno revision filed
13 of 17Construction stages donefurthest along: Electrification, 95%
4 of 8Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 128 documents Report an error

TRANQUIL is a Residential/Group Housing project by Silver Nest Realty in Dharwad, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1259/479/PR/150525/007745 on 15 May 2025. Possession is promised by 30 Dec 2027. 4 of the 8 units on this registration are recorded sold or booked, and 13 of 17 construction stages are filed complete.

At a glance

Project

  • NameTRANQUIL
  • TypeResidential/Group Housing
  • Location
    • Hubballi
    • Dharwad
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1259/479/PR/150525/007745
  • ReraGenie IDRG-KA-83919

Builder

  • NameSilver Nest Realty
  • Entity typePartnership Firm
  • GSTIN29AFHFS6545N1Z4
  • Authorized SignatoryAbraz M Bagawan

Key dates

this monthRegisteredMay 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 May 2025
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed128 files

Current status

50%4 of 8 units booked
13.6%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TRANQUIL---808

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 17 construction stages are filed complete. The stage furthest along is Electrification, at 95%.

Building: 93% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing95%
Painting0%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)90%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work100%
Internal and External work including landscapes as per sanctioned drawings95%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes95%
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes95%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes95%
Storm water drainsYes95%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes95%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes95%
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes95%
LiftsYes95%
Corridor/LobbiesYes95%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes95%
BasementYes90%
TerraceYes95%
Outer WallYes95%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes85%
Water conservation and renewable energyNoNot applicable
Common storage spacesYes95%

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Darla Bhaskar Rao--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.37 cr
Cost incurredRs 32.20 lakh
Spent of the estimate13.61%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.81 crRs 27.16 lakh
Administrative costRs 43.92 lakh-
Payment of taxesRs 7.33 lakh-
On-site expenditure-Consultants FeesRs 4.00 lakh-
On-site expenditure-Site Overhead-Rs 5.03 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnup Vijaykumar Oswal
EngineerVinayak Tambe
Chartered AccountantKartik Bhujanga Shetty

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed128

As listed on the registration, under the names the promoter filed them with; the newest 80 of 128 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1259/479/PR/150525/007745 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 CA Certificate (QU) Sep 26.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect certificate Sep 26.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6, Engineer certificate Sep 26.pdf15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 CA Certificate.pdf14 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect certificate June 26.pdf14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6, Engineer certificate June 26.pdf14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA certi.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect certificate March 26.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6, Engineer certificate March 26.pdf15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 CA Certificate (QU) dec 25.pdf17 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect certificate Dec 25.pdf17 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6, Engineer certificate Dec 25.pdf17 Jan 2026
Source of Funds with supportive docFile: 1 Source of Funds with supportive doc.pdf28 Apr 2025
HESCOM NOC ApplicationFile: 3 HESCOM NOC Application.pdf28 Apr 2025
NOC AffidavitFile: NOC Affidavit.pdf28 Apr 2025
Query AnswersFile: Query Answers.pdf28 Apr 2025
Source of Funds with supportive docFile: 1 Source of Funds with supportive doc.pdf18 Mar 2025
HESCOM NOC ApplicationFile: 4 HESCOM NOC Application.pdf18 Mar 2025
Query Answer DocumentFile: Query Answer Document.pdf18 Mar 2025
Source of fund with supportive documentsFile: 2 Source of fund with supportive documents.pdf13 Feb 2025
Area StatementFile: 8 Area Statement.pdf13 Feb 2025
HESCOM NOC ApplicationFile: 11 HESCOM NOC Application.pdf13 Feb 2025
Water board NOC ApplicationFile: 11 Water board NOC Application.pdf13 Feb 2025
Query 4 AnswerFile: Query 4 Answer.pdf13 Feb 2025
Provision BSFile: 1 Provision BS.pdf10 Jan 2025
Provision PLFile: 1 Provision PL.pdf10 Jan 2025
Source of fund with supportive documentsFile: 2 Source of fund with supportive documents.pdf10 Jan 2025
Village MapFile: 5 Village Map.pdf10 Jan 2025
CDP PlanFile: 6 CDP Plan.pdf10 Jan 2025
CDP PlanFile: 7 CDP Plan.pdf10 Jan 2025
Area StatementFile: 8 Area Statement.pdf10 Jan 2025
Form-6 Engineer CertificateFile: 10 Form-6 Engineer Certificate.pdf10 Jan 2025
HESCOM NOC ApplicationFile: 11 HESCOM NOC Application.pdf10 Jan 2025
Water board NOC ApplicationFile: 11 Water board NOC Application.pdf10 Jan 2025
proforma of Allotment LetterFile: 12 proforma of Allotment Letter.pdf10 Jan 2025
Query Answer Document 3 10-01-2025File: Query Answer Document 3 10-01-2025.pdf10 Jan 2025
Provision BSFile: 1 Provision BS.pdf9 Dec 2024
Provision PLFile: 1 Provision PL.pdf9 Dec 2024
Source of Funds with supportive docFile: 2 Source of Funds with supportive doc.pdf9 Dec 2024
Tital deed of the current land ownerFile: 3 Tital deed of the current land owner.pdf9 Dec 2024
PT Sheet ADLR SY SketchFile: 4 PT Sheet ADLR SY Sketch.pdf9 Dec 2024
Building permission letter from Local lanning AuthorityFile: 7 Building permission.pdf9 Dec 2024
Approval plan - All Sanction planFile: 8 Approval plan - All Sanction plan.pdf9 Dec 2024
Village MapFile: 11 Village Map.pdf9 Dec 2024
CDP PlanFile: 12 CDP Plan.pdf9 Dec 2024
Area StatementFile: 13 Area Statement.pdf9 Dec 2024
Form-6 Engineer CertificateFile: 15 Form-6 Engineer Certificate.pdf9 Dec 2024
HESCOM NOC ApplicationFile: 16 HESCOM NOC Application.pdf9 Dec 2024
proforma of Allotment LetterFile: 17 proforma of Allotment Letter.pdf9 Dec 2024
Provision BSFile: 1 Provision BS.pdf29 Oct 2024
Provision PLFile: 1 Provision PL.pdf29 Oct 2024
Source of Funds with supportive docFile: 2 Source of Funds with supportive doc.pdf29 Oct 2024
Tital deed of the current land ownerFile: 3 Tital deed of the current land owner.pdf29 Oct 2024
Legal OpenionFile: 4 Legal Openion.pdf29 Oct 2024
Building permissionFile: 8 Building permission.pdf29 Oct 2024
approval planFile: 9 approval plan.pdf29 Oct 2024
Village MapFile: 12 Village Map.pdf29 Oct 2024
Area Statement-3File: 16 Area Statement-3.pdf29 Oct 2024
Form-6 Engineer CertificateFile: 17 Form-6 Engineer Certificate.pdf29 Oct 2024
Declaration on SEPTIC TANKFile: 18 Declaration on SEPTIC TANK.pdf29 Oct 2024
HESCOM NOC ApplicationFile: 19 HESCOM NOC Application.pdf29 Oct 2024
Source of waterFile: 20 Source of water.pdf29 Oct 2024
Allotment LetterFile: 21 Allotment Letter.pdf29 Oct 2024
Project Specification finalFile: 22 Project Specification final.pdf29 Oct 2024
Registration CertificateFile: Firm Registration certificate - silver nest.jpeg-
GST Certificate-
Partnership DeedFile: partnership deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: Form-5 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Form-6 Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: No litigation Affidavit.pdf-
Certificate from Chartered AccountFile: Form 1 CA Certificate.pdf-
Balance Sheet 2023 - 2024File: Financials Declearations.pdf-
building permission -
HESCOM NOC Application-

How this compares with Dharwad

50%of this project is bookeddistrict median 38%
29%of Dharwad projects moved their completion datethis one has not
0%of Dharwad registrations are shown as withdrawn or revokedthis one is not

Computed across the 250+ Dharwad projects on ReraGenie, from their own filings.

Keep TRANQUIL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dharwad250+ in Dharwad

Builder: Silver Nest Realty

Silver Nest Realty has 1 registration on RERA Karnataka, including TRANQUIL. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dharwad district page.

Frequently asked questions

What are my rights if TRANQUIL is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of TRANQUIL?

The registered promoter entity is Silver Nest Realty, a partnership firm as per the filing. Its GSTIN 29AFHFS6545N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in TRANQUIL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at TRANQUIL?

The professionals named in the filing: Architect: Anup Vijaykumar Oswal; Engineer: Vinayak Tambe; Chartered Accountant: Kartik Bhujanga Shetty. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRANQUIL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRANQUIL. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRANQUIL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.