SWASTIK VILLA

By RANJITBHAI THAKORBHAI PATEL AND OTHERS

RG-GJ-51339 · RERA PR/GJ/SURAT/SURAT CITY/SUDA/PAA09082/210921 · Last updated on GujRERA portal: 24 Dec 2021

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Dec 2024Possession promisedno revision filed
42 of 42Units unsoldnot recorded sold or booked
Jump to the 42 documents Report an error

SWASTIK VILLA is a Plotted Development project by RANJITBHAI THAKORBHAI PATEL AND OTHERS in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/SURAT CITY/SUDA/PAA09082/210921 on 21 Sep 2021. Possession is promised by 31 Dec 2024. 0 of the 42 units on this registration are recorded sold or booked.

At a glance

Project

  • NameSWASTIK VILLA
  • TypePlotted Development
  • Location
    • T.P. Scheme No. 46 (JAHANGIRPURA)
    • Block No. 107
    • O.P. No. 44
    • F.P. No. 71
    • Paikee Sub Plot no.: 1
    • bearing Village : Jahangirpura
    • Taluka : Adajan
    • Dist :...
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/SURAT CITY/SUDA/PAA09082/210921
  • ReraGenie IDRG-GJ-51339

Builder

  • NameRANJITBHAI THAKORBHAI PATEL AND OTHERS
  • Entity typeOther

Key dates

this monthRegisteredSep 2021PromisedDec 2024

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2024
  • Registered on21 Sep 2021
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed42 files

Current status

0%0 of 42 units booked
100.0%Of the estimated cost spent so far

Figures as on 24 Dec 2021, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OPEN RESIDENTIAL PLOT---0042

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 24 Dec 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

OPEN RESIDENTIAL PLOT:

ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable

Progress on shared amenities19

As on 24 Dec 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyNoNot applicable
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,547 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 40.88 lakh
Cost incurredRs 40.88 lakh
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
OPEN RESIDENTIAL PLOTNARs 40.88 lakhRs 40.88 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHUVNESH B MANGROLIYA
EngineerDHAVAL B DAVDA

Documents filed42

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/SURAT CITY/SUDA/PAA09082/210921 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)24 Dec 2021
Engineer's certificate (Form 2)24 Dec 2021
Engineer's certificate annexure24 Dec 2021
Accountant's certificate (Form 3)24 Dec 2021
Site photograph, OPEN RESIDENTIAL PLOT24 Dec 2021
Site photograph, OPEN RESIDENTIAL PLOT24 Dec 2021
Site photograph, OPEN RESIDENTIAL PLOT24 Dec 2021
RERA registration certificate21 Sep 2021
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

0%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one has not

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep SWASTIK VILLA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Surat2,600+ in Surat

2 kmSWASTIK VILLAOther 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: RANJITBHAI THAKORBHAI PATEL AND OTHERS

RANJITBHAI THAKORBHAI PATEL AND OTHERS has 1 registration on GujRERA, including SWASTIK VILLA. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if SWASTIK VILLA is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SWASTIK VILLA?

The registered promoter entity is RANJITBHAI THAKORBHAI PATEL AND OTHERS. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SWASTIK VILLA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SWASTIK VILLA?

The professionals named in the filing: Architect: BHUVNESH B MANGROLIYA; Engineer: DHAVAL B DAVDA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWASTIK VILLA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWASTIK VILLA. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWASTIK VILLA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.